Off the Grid (Captive Power Plants) Levy Act, 2025

Stored extracted text; legal completeness and current force have not been independently established. Inspect source and version details

Reading view reduces excess blank space and hides page extraction markers. Original text and downloads are retained.

Reading layout follows the stored source. Open the original transcription below to compare wording and extraction details.

THE OFF THE GRID (CAPTIVE POWER PLANTS) LEVY ACT, 2025

SCHEDULE

THE OFF THE GRID (CAPTIVE POWER PLANTS) LEVY ACT, 2025 ACT NO. XIV OF 2025 [30th May, 2025] AN ACT to impose an off the grid levy on natural gas based captive power plants WHEREAS it is expedient to provide for the validation, imposition and collection of the off the grid levy for consumption of natural gas by captive power plants for the purposes hereinafter appearing;

It is hereby enacted as under:__

Section 1. Short title, extent and commencement

(1) This Act shall be called as the off the Grid (Captive Power Plants) Levy Act, 2025.

(2) It extends to the whole of Pakistan.

(3) It shall come into force at once.

Section 2. Definitions

In this Act, unless there is anything repugnant in the subject or context,__

(a) “agent” means an entity specified in the Schedule;

(b) “bulk-power consumer” means a consumer as defined in section 2 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (Act No. XL of 1997);

(c) “captive power plant” means an industrial undertaking or unit carrying out the activity of power production (with or without cogeneration) for self- consumption or for sale of surplus power to a distribution company or a bulk- power consumer;

(d) “distribution company” means a distribution company as defined in section 2 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (Act No. XL of 1997);

(e) “levy” means an off the grid levy chargeable from natural gas or RLNG based captive power plants under section 3 of this Act;

(f) “LNG” means liquefied natural gas;

(g) “natural gas” means hydrocarbons or mixture of hydrocarbons and other gases which at sixty degrees fahrenheit and atmospheric pressure are in the gaseous state (including gas from gas wells, gas produced with crude oil and residue gas

and products resulting from the processing of gas) consisting primarily of methane, together with any other substance produced with such hydrocarbons;

(h) “NEPRA” means the National Electric Power Regulatory Authority established under section 3 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997;

(i) “prescribed” means prescribed by rules;

(J) “RLNG” means re-gasified LNG;

(k) “rules” means rules made under this Act;

(1) “Schedule” means a Schedule to this Act; and

(m) “self-power generation cost” means the power generation cost of the captive power plant at the Oil and Gas Regulatory Authority’s (OGRA) notified tariff.

Section 3. Imposition and collection of levy

(1) Subject to section 4, every captive power plant shall pay to the Federal Government a levy on consumption of natural gas or RLNG, over and above the sale price notified under section 8 and section 43B of the Oil and Gas Regulatory Authority Ordinance, 2002 (XVII of 2002), at such rate as notified by the Federal Government in the official Gazette, from time to time.

(2) The agent shall be responsible for billing of levy to captive power plants, its collection and onward payment to the Federal Government in the manner as may be prescribed.

Section 4. Calculation of rate of levy

Before notifying the levy under sub-section (1) of section 3, the divisions concerned under the Rules of Business, 1973 shall calculate the rate of levy by taking into account the difference of power tariff of industrial B3 category, notified by NEPRA, and the self- power generation cost of the captive power plant at the gas tariff notified by OGRA:

Provided that the rate of levy shall be increased by five percent immediately and further increased to ten percent by July, 2025, fifteen percent by February, 2026 and twenty percent by August,

2026.

Section 5. Utilization of levy

(1) The levy shall be utilized by the Federal Government for reduction of power generation tariff for all consumer categories of the power sector.

(2) An annual report in respect of the utilization of the levy shall be laid before both the Houses of Majlis-e-Shoora (Parliament) after three months from the end of each fiscal year.

Section 6. Consequences for non-payment of levy

(1) If the amount of levy is not paid within the specified time by the captive power plant, the same shall be recoverable under sub-section (2) and in case of persistent default in payment, the agent shall terminate the gas supplies to the defaulted captive power plant.

(2) The amount of levy due but not paid within the time allowed shall be recoverable under the provisions of the Public Finance Management Act, 2019.

Section 7. Allowance to be made for levy for purposes of income tax

The levy paid by a captive power plant shall be an expenditure for which allowance is to be made under the Income Tax Ordinance, 2001 (XLIX of 2001) in computing its profits or gains.

Section 8. Power to make rules

(1) The Federal Government may, by notification in the official Gazette, make rules to carrying out the purposes of this Act.

Section 9. Power to amend the Schedule

The Federal Government may, by notification in the official Gazette, make such amendments in the Schedule as it deems fit.

Section 10. Removal of difficulties

If any difficulty arises in giving effect to the provisions of this Act, the President may make an order, not inconsistent with the provisions of this Act, to remove the difficulty.

SCHEDULE

[See Section 2(a)]

1. Sui Northern Gas Pipelines Limited.

2. Sui Southern Gas Company Limited.

3. Any other company engaged in sale of gas to captive power plants as may be notified in the official Gazette.

__________

p4wns5887 RGN Date: 24-06-2025

Print contents from the source
CONTENTS 
1. Short title, extent and commencement 
2. Definitions 
3. Imposition and collection of levy 
4. Calculation of rate of levy 
5. Utilization of levy 
6. Consequences for non-payment of levy 
7. Allowance to be made for levy for purposes of income tax 
8. Power to make rules 
9. Power to amend the Schedule 
10. Removal of difficulties 
Compare the original stored transcription

Exact source transcription retained, including print layout and extraction artifacts. Text SHA-256: c9868ca0fa29b75390d747c3e840d1cc3470a7b470639f513eef9f1d21c864b6.

Page 1 of 4 
 
 
 
 
THE OFF THE GRID (CAPTIVE POWER PLANTS) LEVY ACT, 
2025 
 
                                                          CONTENTS 
1. Short title, extent and commencement 
2. Definitions 
3. Imposition and collection of levy 
4. Calculation of rate of levy 
5. Utilization of levy 
6. Consequences for non-payment of levy 
7. Allowance to be made for levy for purposes of income tax 
8. Power to make rules 
9. Power to amend the Schedule 
10. Removal of difficulties 
SCHEDULE 
 
 
  

 
Page 2 of 4 
 
THE OFF THE GRID (CAPTIVE POWER PLANTS) LEVY ACT, 2025 
ACT NO. XIV OF 2025 
[30th May, 2025] 
AN 
ACT 
to impose an off the grid levy on natural gas based captive power plants 
WHEREAS it is expedient to provide for the validation, imposition and collection of the off 
the grid levy for consumption of natural gas by captive power plants for the purposes hereinafter 
appearing; 
It is hereby enacted as under:__ 
1. Short title, extent and commencement .__ (1) This Act shall be called as the off the Grid 
(Captive Power Plants) Levy Act, 2025. 
(2) It extends to the whole of Pakistan. 
(3) It shall come into force at once. 
2. Definitions.__ In this Act, unless there is anything repugnant in the subject or context,__ 
(a)  “agent” means an entity specified in the Schedule; 
(b)  “bulk-power consumer ” means a consumer as defined in section 2 of the 
Regulation of Generation, Transmission and Distribution of Electric Power Act, 
1997 (Act No. XL of 1997); 
(c)  “captive power plant” means an industrial undertaking or unit carrying out the 
activity of power production (with or without cogeneration) for self -
consumption or for sale of surplus power to a distribution company or a bulk -
power consumer; 
(d)  “distribution company” means a distribution company as defined in section 2 of 
the Regulation of Generation, Transmission and Distribution of Electric Power 
Act, 1997 (Act No. XL of 1997); 
(e)  “levy” means an off the grid levy chargeable from natural gas or RLNG based 
captive power plants under section 3 of this Act; 
(f)  “LNG” means liquefied natural gas; 
(g)  “natural gas” means hydrocarbons or mixture of hydrocarbons and other gases 
which at sixty de grees fahrenheit and atmospheric pressure are in the gaseous 
state (including gas from gas wells, gas produced with crude oil and residue gas 
 
Page 3 of 4 
 
and products resulting from the processing of gas) consisting primarily of 
methane, together with any other substance produced with such hydrocarbons; 
(h)  “NEPRA” means the National Electric Power Regulatory Authority established 
under section 3 of the Regulation of Generation, Transmission and Distribution 
of Electric Power Act, 1997; 
(i)  “prescribed” means prescribed by rules; 
(J)  “RLNG” means re-gasified LNG; 
(k)  “rules” means rules made under this Act; 
(1)  “Schedule” means a Schedule to this Act; and 
(m)  “self-power generation cost ” means the power generation cost of the captive 
power plant at the Oil and Gas Regulatory Authority’s (OGRA) notified tariff. 
3. Imposition and collection of levy.__ (1) Subject to section 4, every captive power plant shall 
pay to the Federal Government a levy on consumption of natural gas or RLNG, over and above the 
sale price notified under section 8 and section 43B of the Oil and Gas Regulatory Authority Ordinance, 
2002 (XVII of 2002), at such rate as notified by the Federal Government in the official Ga zette, from 
time to time. 
(2) The agent shall be responsible for billing of levy to captive power plants, its collection and 
onward payment to the Federal Government in the manner as may be prescribed. 
4. Calculation of rate of levy .__ Before notifying the levy under sub-section (1) of section 3, 
the divisions concerned under the Rules of Business, 1973 shall calculate the rate of levy by taking 
into account the difference of power tariff of industrial B3 category, notified by NEPRA, and the self-
power generation cost of the captive power plant at the gas tariff notified by OGRA: 
Provided that the rate of levy shall be increased by five percent immediately and further 
increased to ten percent by July, 2025, fifteen percent by February, 2026 and twenty percent by August, 
2026. 
5. Utilization of levy.__ (1) The levy shall be utilized by the Federal Government for reduction 
of power generation tariff for all consumer categories of the power sector. 
(2) An annual report in respect of the utilization of the levy shall be laid before both the Houses 
of Majlis-e-Shoora (Parliament) after three months from the end of each fiscal year. 
6. Consequences for non-payment of levy.__ (1) If the amount of levy is not paid within the 
specified time by the captive power p lant, the same shall be recoverable under sub -section (2) and in 
case of persistent default in payment, the agent shall terminate the gas supplies to the defaulted captive 
power plant. 
(2) The amount of levy due but not paid within the time allowed shall be recoverable under the 
provisions of the Public Finance Management Act, 2019. 
 
Page 4 of 4 
 
7. Allowance to be made for levy for purposes of income tax .__ The levy paid by a captive 
power plant shall be an expenditure for which allowance is to be made under the Income Tax 
Ordinance, 2001 (XLIX of 2001) in computing its profits or gains. 
8. Power to make rules .__ (1) The Federal Government may, by notification in the official 
Gazette, make rules to carrying out the purposes of this Act. 
9. Power to amend the Schedule. __ The Federal Government may, by notification in the 
official Gazette, make such amendments in the Schedule as it deems fit. 
10. Removal of difficulties.__ If any difficulty arises in giving effect to the provisions of this 
Act, the President may make an order, not inconsistent with the provisions of this Act, to remove the 
difficulty. 
SCHEDULE 
[See Section 2(a)] 
1. Sui Northern Gas Pipelines Limited. 
2. Sui Southern Gas Company Limited. 
3. Any other company engaged in sale of gas to captive power plants as may be notified 
in the official Gazette. 
 
__________ 
 
 
 
 
 
 
 
 
p4wns5887 
RGN Date: 24-06-2025
LAW LIBRARY MAP

This law in the library

Follow the instruments and provisions named in this source edition, and the laws that cite it. Citation links identify the text being referred to; legal effect and current force require separate examination.

5 citations to other instruments0 citations from other laws5 internal provision references4 explicit external provision references
Instruments cited by this law 3
References to provisions in this text 5

Section 3

Open the identified operative provision

Read reference in context
ution of Electric Power Act, 1997 (Act No. XL of 1997); (e) “levy” means an off the grid levy chargeable from natural gas or RLNG based captive power plants under section 3 of this Act; (f) “LNG” means liquefied natural gas; (g) “natural gas” means hydrocarbons or mixture of hydrocarbons and other gases which at sixty de grees fahrenheit and atmospheric pressure are in the gaseous state (i

Read the source passage

Section 4

Open the identified operative provision

Read reference in context
r generation cost of the captive power plant at the Oil and Gas Regulatory Authority’s (OGRA) notified tariff. 3. Imposition and collection of levy.__ (1) Subject to section 4, every captive power plant shall pay to the Federal Government a levy on consumption of natural gas or RLNG, over and above the sale price notified under section 8 and section 43B of the Oil and Gas Regulatory Authority Ordin

Read the source passage

Section 8

Open the identified operative provision

Read reference in context
o section 4, every captive power plant shall pay to the Federal Government a levy on consumption of natural gas or RLNG, over and above the sale price notified under section 8 and section 43B of the Oil and Gas Regulatory Authority Ordinance, 2002 (XVII of 2002), at such rate as notified by the Federal Government in the official Ga zette, from time to time. (2) The agent shall be responsible for

Read the source passage

Section 3

Open the identified operative provision

Read reference in context
nd onward payment to the Federal Government in the manner as may be prescribed. 4. Calculation of rate of levy .__ Before notifying the levy under sub-section (1) of section 3, the divisions concerned under the Rules of Business, 1973 shall calculate the rate of levy by taking into account the difference of power tariff of industrial B3 category, notified by NEPRA, and the self- power generation c

Read the source passage

Section 2(a)

Open the identified operative provision

Read reference in context
effect to the provisions of this Act, the President may make an order, not inconsistent with the provisions of this Act, to remove the difficulty. SCHEDULE [See Section 2(a)] 1. Sui Northern Gas Pipelines Limited. 2. Sui Southern Gas Company Limited. 3. Any other company engaged in sale of gas to captive power plants as may be notified in the official Gazette. __________

Read the source passage

Provisions explicitly cited in other instruments 4

Section 2 of Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997

Cited by Off the Grid (Captive Power Plants) Levy Act, 2025

The named instrument matches multiple source editions; no edition is selected.

Read source and target evidence

Explicit source reference

is anything repugnant in the subject or context,__ (a) “agent” means an entity specified in the Schedule; (b) “bulk-power consumer ” means a consumer as defined in section 2 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (Act No. XL of 1997); (c) “captive power plant” means an industrial undertaking or unit carrying out the activity of power production (with or without cogeneration) for self - consumption or for sale of surplus power to a d

Read the source passage

Section 2 of Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997

Cited by Off the Grid (Captive Power Plants) Levy Act, 2025

The named instrument matches multiple source editions; no edition is selected.

Read source and target evidence

Explicit source reference

consumption or for sale of surplus power to a distribution company or a bulk - power consumer; (d) “distribution company” means a distribution company as defined in section 2 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997 (Act No. XL of 1997); (e) “levy” means an off the grid levy chargeable from natural gas or RLNG based captive power plants under section 3 of this Act; (f) “LNG” means liquefied natural gas; (g) “natural gas” means hyd

Read the source passage

Section 3 of Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997

Cited by Off the Grid (Captive Power Plants) Levy Act, 2025

The named instrument matches multiple source editions; no edition is selected.

Read source and target evidence

Explicit source reference

f methane, together with any other substance produced with such hydrocarbons; (h) “NEPRA” means the National Electric Power Regulatory Authority established under section 3 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997; (i) “prescribed” means prescribed by rules; (J) “RLNG” means re-gasified LNG; (k) “rules” means rules made under this Act; (1) “Schedule” means a Schedule to this Act; and (m) “self-power generation cost ” means t

Read the source passage

Section 43B of Oil and Gas Regulatory Authority Ordinance, 2002

Cited by Off the Grid (Captive Power Plants) Levy Act, 2025

The named instrument has not been matched in this library.

Read source and target evidence

Explicit source reference

very captive power plant shall pay to the Federal Government a levy on consumption of natural gas or RLNG, over and above the sale price notified under section 8 and section 43B of the Oil and Gas Regulatory Authority Ordinance, 2002 (XVII of 2002), at such rate as notified by the Federal Government in the official Ga zette, from time to time. (2) The agent shall be responsible for billing of levy to captive power plants, its collection and onward payme

Read the source passage

Cited instruments not matched in this library 5

Explore this law in the whole-library map · Download this law’s relationship evidence · Download preserved source record

Original-source comparison

Original-source character comparison matched under the recorded normalization

Open the compared original source

Source comparison checks the identified transcription and edition. The law's current force, later amendments and territorial application require separate legal review.

Comparison evidence
Stored text SHA-256
c9868ca0fa29b75390d747c3e840d1cc3470a7b470639f513eef9f1d21c864b6
Original source SHA-256
c107775febf99bd72dea56b1719e32efc1ed6bf5810bead6c932a3603b883cf1
Comparison method
Complete exact non-whitespace character stream after NFKC, quotation-mark equivalents and soft-hyphen removal. Word boundaries and PDF line-layout differences remain separately described.

Download the library source-comparison register

View the recorded official source
Source, version and text details
Recorded title
Off the Grid (Captive Power Plants) Levy Act, 2025
Source collection
Federal — this does not establish territorial applicability.
Recorded version
Not supplied in this record
Source snapshot
Not supplied in this record
Legal status
not independently verified
Text quality
Complete stored UTF-8 TXT file recovered byte-for-byte from owned Drive. Source transcription retained verbatim; legal completeness, OCR accuracy and current consolidation unverified.
Recorded quality flags
No additional flags recorded
Stable record
pk-code-596c0ae8a8266065
Content extent
Legal completeness not independently established
Integrity scope
Stored UTF-8 text and TXT download bytes checked against their recorded hash. This does not establish legal authenticity or currency.
Passage offsets
zero-based Unicode code points and UTF8 bytes; end exclusive
Stored text SHA-256
c9868ca0fa29b75390d747c3e840d1cc3470a7b470639f513eef9f1d21c864b6

Law, understood
in its full context.

Evolutionary

Examine institutional development, adaptation and correction.

Strategic

Examine authority, purpose and the choices before institutions.

Anticipatory

Explore emerging consequences and the safeguards they require.