PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021

Stored extracted text; legal completeness and current force have not been independently established. Inspect source and version details

Reading view reduces excess blank space and hides page extraction markers. Original text and downloads are retained.

Reading layout follows the stored source. Open the original transcription below to compare wording and extraction details.

THE PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 (VI of 2021)

FIRST SCHEDULE [See section 2(b)]

SECOND SCHEDULE (See section 56)

TEXT 1THE PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 (VI of 2021)

[17 May 2021]

An Act to establish 2[Punjab] Central Business District Development Authority. It is necessary to make provisions for establishment of 3[Punjab] Central Business District Development Authority for development, promotion and regulation of the state-of-the-art vertical construction in the area both for residential and commercial purposes while maintaining highest environmental standards, quality of life and modern facilities so as to develop a healthy and prosperous business community in the Area 4[of the Authority]. Be it enacted by Provincial Assembly of the Punjab as follows:

Section 1. Short title, extent and commencement

(1) This Act may be cited as the 5[Punjab] Central Business District Development Authority Act 2021. 6[(2) This Act extends to Walton Airport Area Lahore including its surrounding areas and such other areas, cities, urban centres and towns as the Government may, by notification in the official Gazette, specify.]

(3) It shall come into force at once.

Section 2. Definitions

In this Act:

(a) “Agency” means an Agency established by the Authority to perform one or more of its functions under this Act; 7[(b) “Area” means the area of the Authority as specified in the FIRST SCHEDULE];

(c) “Authority” means 8[Punjab] Central Business District Development Authority constituted under section 4 of this Act;

1This Act was passed by Provincial Assembly of the Punjab on 17 May 2021; assented to by the Governor of the Punjab on 17 May 2021; and, was published in the Punjab Gazette (Extraordinary), dated: 17 May 2021, pp.9163-9176.

2Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

3Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

4Inserted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.2.

5Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

6Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.4.

7Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5.

8Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

(d) “Board” means the Board of the Authority established under section 5 of this Act;

(e) “CEO” means Chief Executive Officer of the Authority appointed under section 10 of this Act;

(f) “Chairman” means the Chairman of the Board;

(g) “Collector” means Land Acquisition Collector under the Land Acquisition Act, 1894 (I of 1894);

(h) “compensation” means the compensation given under this Act;

(i) “concession” means the grant by the Authority of any of its rights, privileges or functions to a person in consideration of the investment made or arranged by such person at the instance of the Authority on any development project;

(j) “conversion” means any change in use of land or property from the one originally provided in an approved scheme or the Master Plan;

(k) “Director General” means the principal executive of an Agency;

(l) “District Collector” means Collector of the District under the Punjab Land Revenue Act, 1967 (XVII of 1967);

(m) “fee” means an amount levied by the Authority on the land, area, scheme or property on account of any privilege, benefit, services, transfer of rights and interests, issuance of a license or permission or any cost and includes charges for provision of water supply, construction, maintenance and network of roads, drainage, sewerage and other services;

(n) “finance” shall have the same meanings as assigned thereto in the Financial Institution (Recovery of Finances) Ordinance 2001;

(o) “financial institutions” shall have the same meanings as assigned thereto in the Financial (Recovery of Finances) Ordinance 2001;

(p) “Fund” means the 9[Punjab] Central Business District Development Authority Fund created under this Act;

(q) “Government” means Government of the Punjab;

(r) “Government agency” includes–

(i) a Department, Bureau, section, commission, board, office, or unit of the Government;

(ii) a local government; and

(iii) a developmental or any other public authority, company or corporation owned or controlled by the Government or a local government;

(s) “housing scheme” means a scheme which provides for multi-story residential sites, houses or apartments including ancillary land in the Area such as:

(i) high rise building and other facilities for health, education, commercial, recreation, sports, culture, transportation, communication and shopping;

9Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

(ii) environmental improvement; and

(iii) utility services such as water supply, drainage, sewerage, sanitation, electricity, fuel and other related services;

(t) “joint venture” means entering into an agreement as partner;

(u) “land” includes earth, water and air, above, below or on the surface and any improvements in the structure customarily regarded as land and benefits arising out of land and things attached to earth or permanently fastened to earth;

10[(v) “local government” means a local government as defined in the relevant law on local governments for the time being in force;]

(w) “Master Plan” means the independent master plan of the Area notified and prepared in the traditional method for presenting a set of land usage, allocation and control measures in the form of a map or in graphical form and is supported by written statement of goals and objectives, strategy, financial implications and policies for planning and development for an area and includes a structure plan, an outline development plan, a spatial plan, peri-urban structure plan;

11[(x) “member” means a member of the Board and includes an ex officio member or his nominee;]

(y) “person” includes an individual, company, firm, institution, Government agency, co-operative society or association of individuals whether incorporated or not;

(z) “person interested” includes a person claiming an interest in the compensation to be made on account of the acquisition of land under the Act;

(aa) “prescribed” means prescribed by the rules or the regulations made or framed under this Act;

(bb) “regulations” means the regulations framed under this Act;

(cc) “rules” means the rules made under this Act;

(dd) “Schedule” means 12[a] schedule appended to this Act;

(ee) “scheme” means a project approved for urban development, redevelopment or renewal and includes larger area plan, areas specified and notified for specific use, traffic control plans, classification and reclassification plans, housing scheme or zoning scheme in the Area; or infrastructure and services including transportation systems and road networks, healthcare facilities, recreational facilities, parks and theme parks, educational facilities, cultural facilities, communication and civic facilities, water supply and drainage systems, sewerage and sanitation, energy generation, procurement, transmissions and distribution systems

10Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5.

11Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5.

12Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5.

including for electric powers, through any energy source, and gas (LNG, LPG, etc) or industrial estates and all systems and facilities or works ancillary thereto, planned, made, undertaken and or supervised and or approved by the Authority under this Act;

(ff) “service area” means an area to be notified as such by the Authority and in which an Agency provides services;

(gg) “sponsor” means the sponsor or developer of a commercial or housing scheme and, in case of any liability or offence includes the chief executive, director or any other individual in charge of the scheme on behalf of sponsor entity; and

(hh) “toll” means a charge levied and collected for the use of a road, bridge, flyover, underpass or similar other facility.

Section 3. [Omitted]

13[*****]

Section 4. Establishment of the Authority

(1) As soon as, after promulgation of the Lahore Central Business District Development Authority Ordinance 2021 (IV of 2021), the Government shall, by notification in the official Gazette, establish an Authority to be called as the 14[Punjab] Central Business District Development Authority for carrying out the purposes of this Act.

(2) The Authority shall be a body corporate, with perpetual succession and a common seal, with powers, subject to the provisions of this Act, to acquire and hold property, both movable and immovable, carry on development in the Area, and may, by the said name, sue and be sued.

(3) The Government shall review the performance of the Authority and may, from time to time, give general policy directions to implement such directions.

[15] Section 5. The Board

(1) There shall be a Board of the Authority consisting of the following:

(a) Chairman;

(b) three ex officio members not below the rank of Secretaries to the Government to be nominated by the Government;

(c) two non-official members to be nominated by the Government for a period of three years;

(d) two technical expert members to be appointed by the Government for a period of three years with following criteria:

(i) one expert in fields of engineering or business with at least fifteen years post-qualification experience in the relevant field; and

13Omitted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.6.

14Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

15Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.7.

(ii) one expert in the fields of Urban Planning, Architecture or smart cities with minimum of fifteen years post qualification experience in the relevant field; and

(e) the CEO as member/secretary.

(2) The Board shall exercise all powers, perform all functions and do all acts which may be exercised, performed or done by the Authority.

(3) In case of a casual vacancy, a member other than the Chairman shall be nominated by the Government for the remaining term of the outgoing member.

(4) Subject to subsection (4) of section 8, no act or proceeding of the Board shall be invalid merely by reason of any vacancy or defect in the constitution of the Board.]

Section 6. Disqualifications of members

(1) No person shall be, or shall continue to be a member who:

(a) is or, at any time, has been convicted of an offence involving moral turpitude; or

(b) is or, at any time, has been adjudicated insolvent; or

(c) is found to be a lunatic or of unsound mind; or

(d) is a minor; or

(e) has a financial interest in any scheme or a conflicting interest, directly or indirectly, between his interests as a member and his private interests, and has failed to disclose such interest in writing to the Authority.

(2) A member, other than an ex-officio member, may resign from his office at any time under his hand addressed to the Government and such resignation shall be effective from the date of acceptance by the Government.

(3) The Government may remove the Chairman or a member, other than an ex-officio member, subject to notice and opportunity of hearing, during the term of office if such member is:

(a) disqualified to be a member; or

(b) absent from three consecutive meetings of the Board without prior permission of the Chairman; or

(c) found guilty of misconduct.

Section 7. Powers and Functions of the Authority

(1) The Authority, may in the Area:

(a) initiate and maintain a continuous process of master planning, urban planning, spatial planning;

(b) update and amend the Master Plan and take all steps and measures necessary for the implementation and enforcement of the Master Plan;

(c) prepare and periodically revise land use and building regulations to implement the Master Plan;

(d) plan, amend or change the land use as it deems necessary;

(e) outsource one or more of its functions for smooth functioning and implementation of Master Plan, building control and infrastructure development;

(f) plan, promote, organize and implement programmes for vertical construction, high rise buildings, development, operations, repairs, rehabilitation, security and maintenance of all infrastructure;

(g) develop, operate, maintain and manage water supply, sewerage, drainage, wastewater treatment, improvement of groundwater level and fix any tariff as it may deem necessary and enter into any agreement with any other agency for such purposes;

(h) prepare, plan, design and implement comprehensive transportation plan;

(i) plan, design and implement traffic engineering and traffic management programs;

(j) prepare, plan and implement solid waste management plan;

(k) maintain green areas and aquaculture;

(l) prepare asset management schemes regarding the properties;

(m) prepare, implement and enforce schemes for environmental improvements, housing, urban renewal including slum improvement and redevelopment, health and educational facilities and preservation of objects or places of historical, archaeological, scientific, cultural and recreational importance;

(n) prepare annual development programmes and ensure compliance of such programmes;

(o) prepare the annual budget of the Authority;

(p) take any steps or adopt any measures for the face lifting, beautification, greenery and horticulture;

(q) acquire, dispose of property both movable and immovable or any interest in the property;

(r) sell, lease, exchange 16[, auction] or otherwise dispose of or grant license or concessions in respect of any property vested in it;

(s) raise funds through borrowing, investments, leasing of assets or any other means with the approval of the Government;

(t) enter into and perform such contracts with local and international organizations including but not limited to join venture agreements, as may be necessary for carrying out the purposes of the Act;

(u) award contracts for projects or schemes to be undertaken through public financing or through public private partnership;

(v) enter into partnership with national and international development agencies, organizations or companies or through joint ventures;

(w) undertake any works and incur any expenditure within service area;

(x) procure machinery, instruments or any other material;

16Inserted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.8.

(y) levy, collect or cause to be collected tolls on the use of the roads, bridges, flyovers, underpasses, any infrastructure or such other facilities and grant concession in respect thereof;

(z) establish different directorates, sectors and wings, and delegate such powers to the directorates, sectors and wings as are necessary for the efficient and effective performance of its functions under the Act;

(aa) disseminate and create awareness about the Authority;

(bb) collaborate with the Government, the local government or any other public or private sector agency for improvement of services and environment;

(cc) organize road shows or seminars to attract national and international investors, consultants and contractors for infrastructure, road development works and master planning;

(dd) ensure enforcement of this Act in collaboration with the Government and the local governments;

(ee) seek advice and assistance for the preparation of any scheme, or for the execution of any scheme from the Government or any person or agency;

(ff) support training and workshops of its human resource at local and international level for capacity building; and

(gg) perform such other functions as the Government may assign to the Authority to achieve the objectives of this Act; 17[(hh) prepare, launch and execute real estate investment trusts;

(ii) determine the terms and conditions of the Chairman;

(jj) develop models and mode of compensation for acquisition or purchase of land including through bonds, debentures, annuities, alternate land, developed sites or a combination of two or more of such forms; and

(kk) issue guarantees and indemnities for the purposes of this Act.]

(2) The Authority shall have all the powers of a local government as defined in Punjab Local Government Act 2019 (XIII of 2019), and the municipal authority independently for the purpose of carrying out any function under this Act in the Area.

Section 8. Meetings

18[(1) Subject to the regulations, the Board shall meet at such place and at such time as it may determine from time to time.]

(2) The meetings of the Board shall be presided over by the Chairman. 19[(3) In the absence of the Chairman, members present at a meeting shall elect a member from amongst them to preside over a meeting.]

17Added by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.8.

18Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9.

19Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9.

20[(4) Five members of the total members of the Board, including the Chairman, present in person or through video conference or tele-conference shall constitute the quorum for a meeting of the Board.]

(5) Subject to the quorum, the decisions of the Board shall be taken by majority of the members present and voting and in the event of equality of votes the Chairman or his nominee shall have casting vote:

provided that a coopted member shall not have any right to vote.

(6) The Board shall meet at least once in every calendar quarter and a meeting of the Board shall be held on such date and at such time and place as the Chairman may determine. 21[(7) The CEO shall act as Secretary of the Board.

(8) The Secretary of the Board shall maintain or cause to be maintained the record of each meeting of the Board including the minutes of the meetings.

(9) The Chairman may co-opt any person other than a member to attend a meeting of the Board for the purpose of advising or assisting the Board on any agenda item taken up for consideration at such meeting but a co-opted member shall not have right to vote.]

Section 9. Chairman of the Board

The Chairman of the Board shall be appointed by the Government on such terms and conditions as may be determined by the 22[Board].

Section 10. Chief Executive Officer

(1) The Government shall appoint the CEO to serve as a member of the Board, who shall, subject to the provisions of this Act, be responsible for the management, administration and operations of the Authority.

(2) The CEO shall be a person of sound integrity and competence with at least 15 years of relevant experience.

(3) The CEO shall be answerable to the Board for all administrative, financial and technical matters of the Authority. 23[(4) The CEO shall be appointed for an extendable term of three years on such terms and conditions as may be determined by the Board:

provided that the Board shall review the performance of the CEO every year, and grant him such increments and bonuses as may be approved in the annual budget of the Authority.

provided further that the CEO shall only be removed from service after giving him a notice and right of hearing before the Government.

(5) The CEO may, at any time before the expiry of his term and upon three months ’notice, resign his office.

20Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9.

21Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9.

22Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.10.

23Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.11.

(6) Subject to this Act and general supervision and control of the Board, the CEO may exercise all powers and perform all functions of the Authority and the Board.]

Section 11. Delegation

(1) The Board may delegate its powers under this Act subject to such conditions as it may deem fit. 24[(2) The Board or the CEO may establish, by special order, one or more Agencies.]

(3) The Director Generals of Agencies shall:

(a) be appointed by the CEO in consultation with the Chairman on such terms and conditions as may be determined by the CEO;

(b) hold office for a period of three years and shall be responsible for its administration and having such powers as may be prescribed; and

(c) remain in office for three months expiry of his term under clause (b) or until a successor in that office is appointed, whichever is earlier.

(4) Nothing in this section shall preclude the CEO from extending the term of office of the Director General of an Agency for such period as he may determine.

(5) Notwithstanding anything contained in this Act, the Director General of an Agency may, at any time before the expiry of his term and upon three months‟ notice, resign this office or, upon similar notice, be removed by the Government without assigning any reason.

[25] Section 12. Appointment of employees

(1) The Authority may appoint such employees including advisors, experts and consultants as it considers necessary for the efficient performance of its functions on such terms and conditions as may be prescribed by the regulations:

provided that the Authority shall review the performance of its employees every year, and may grant such increments and bonuses to them as may be approved in the annual budget of the Authority.]

Section 13. Termination from service

Notwithstanding anything contained in the terms and conditions of service, the Authority may, at any time, remove any employee from service of the Authority or an Agency after giving him one month notice and affording him an opportunity of being heard.

Section 14. Liability for loss

Any person employed by or serving under the Authority or an Agency or an agency acting on behalf of the Authority or an agency or acting under a contract with the Authority or an agency which is responsible for the loss, waste, misappropriation or misapplication of any money or property belonging to the Authority or an Agency, which is a direct consequence of his negligence or misconduct in the discharge of his duties, shall be liable to pay the loss suffered by the Authority or Agency as may be

24Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.12.

25Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.13.

determined by the Authority after giving such person a reasonable opportunity of being heard.

Section 15. Committees

The Board may constitute such number of financial, technical and advisory committees or other Committees as it may deem necessary for carrying out the purposes of this Act, and such committees shall exercise such powers and perform such functions as may be delegated or assigned to them by the Board.

[26] Section 16. Preparation of schemes and projects etc

(1) subject to the provisions of this Act, the Authority shall prepare projects for the area or any part thereof.

(2) Any planning or development scheme in the area of the Authority may be carried out only with the concurrence of the Authority.]

Section 17. Establishment of housing schemes, projects etc

(1) The Authority may prepare, establish and develop housing and any other schemes, buildings, infrastructure, services, commercial, semi-commercial projects or sites in the Area and for the purpose it may enter into an agreement including Joint Venture Agreement with any 27[private person, government, governmental agency, entity or corporation on revenue sharing basis].

(2) A scheme under subsection (1) shall be approved in the manner prescribed for the preparation of a scheme under this Act.

Section 18. Land use

(1) The Authority may, at any time, modify a scheme prepared under this Act by way of change of land use through classification, reclassification, settlements or resettlements or redevelopment in the Area in such manner as may be prescribed by the regulations.

(2) The Authority shall, in such manner as may be prescribed by the regulation, exercise land use control and perform multi-storied commercial and housing functions.

(3) In case any person contravenes any of the provisions of this section, he shall be punished with imprisonment for a term which may extend to three years or with fine which may extend to five hundred thousand rupees or with both.

Section 19. Control of Master Plan

28[(1) The Authority may make, maintain, amend, manage, enforce and keep in its custody a Master Plan or Master Plans if devised for the Area in different cities, towns and urban centres.]

(2) The Authority shall, in the prescribed manner, exercise land use control and perform housing functions in the Area without having any interference from any other authority or local government or Government Agency.

(3) Notwithstanding anything contained in any other law, a person shall be bound to adhere to the Master Plan, rules and regulations for land use control and housing functions as given under subsections (1) and (2).

26Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.14.

27Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.15.

28Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.16.

(4) If any person contravenes any of the provisions of this section, the Authority may direct that till the time the contravention continues–

(a) transfer of any immovable property of such person shall be prohibited;

(b) the District Collector shall impose a ban on the issuance of Fard Malkiat, registration of any document or attestation of mutation in favour of the said person; and

(c) a local government, an Agency or a Government agency shall stop or discontinue the provision of municipal services to such person.

(5) Notwithstanding, anything contained in any other law for the time being in force, the Master Plan shall be considered as an independent Master Plan and shall have no nexus whatsoever with the integrated master plans of any other Authority, agency or local government.

Section 20. Power to give directions

(1) The Authority may require a Government agency, within whose jurisdiction any particular locality or aspect of development covered by a scheme lies–

(a) to execute a scheme in consultation with the Authority;

(b) to take over and maintain any of the works and services in that area;

(c) to provide any amenity in relation to the land which in the opinion of the Authority ought to be provided; and

(d) to enforce regulations on behalf of the Authority.

(2) The expenditure incurred on the execution of any scheme or on the taking over or maintenance of any work, or the enforcement of regulation, under this section, shall be borne as may be agreed to between the Authority and the Government agency and in the event of any disagreement, as may be determined by the Government.

Section 21. Power to execute schemes

(1) Where the Authority is satisfied that any direction given by it under section 20 with regard to any scheme, has not been carried out by the Government agency, the Authority may, itself, undertake any work for the execution of that scheme and the cost thereof shall be borne as may be agreed between the Authority and the Government agency, and, in the event of disagreement, as may be determined by the CEO.

(2) Where any work is undertaken by the Authority under subsection (1), it shall be deemed to have, for the purposes of execution of such work, all the powers which may be exercised under any law for the time being in force, by the Government agency concerned.

Section 22. [Omitted]

29[*****]

Section 23. Transfer of functions

Where the Authority ceases to perform a function and another Government agency or organization assumes that function, the Government by notification in the official Gazette may direct:

29Omitted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.17.

(a) that the employees of the Authority connected with that function shall become servants of the Government agency or organization on such terms and conditions as the Government agency or organization may determine, subject to the condition that such terms and conditions are not less favorable than those admissible to such employees as employees of the Authority; and

(b) that such part of the Fund of the Authority as the Government may determine, shall stand transferred to such Government agency or organization.

Section 24. Controlled area

(1) The Authority may, by notification in the official Gazette, declare any locality within the Area to be a controlled area for purposes of this Act and may issue in respect of such controlled area such directions as it considers fit and appropriate and do all such things as may be necessary for the prevention of haphazard growth, encroachments and unauthorized constructions in such area.

(2) The Authority may, by notification in the official Gazette, notify any controlled area to be no longer such area.

(3) The Authority may, by notification in the official Gazette, entrust any of its functions in any locality within the Area, to any duly appointed agent or any Government agency.

(4) For purposes of subsection (3), the Authority may enter into an agreement with a person or any entity on such terms and conditions as may be mutually agreed including joint venture agreement 30[*****].

Section 25. Powers to remove sources of pollution

(1) The Authority shall have powers to take steps for improvement of the environment of the Area, and to check, replace, eliminate, remove, demolish, conserve, resettle or relocate the sources of environmental pollution such as milch cattle, horses or other animals, tongas, vehicular exhaust, industrial waste, solid waste, congestion, blight and slums and other such pollutants.

(2) The person affected by any action of the Authority under subsection (1) shall be paid such compensation as may be determined under this Act.

Section 26. Beautification and horticulture

(1) The Authority shall also undertake beautification including but not limited to greenery, tree plantation, horticulture services, green belts, parks of the area or part thereof, in any manner as it deems fit.

(2) Notwithstanding anything contained in the Parks and Horticulture Authority Act 2012 (XLVII of 2012) or rules made thereunder, this Act shall govern the matters of any undertaking, work or scheme relating to the beautification or horticulture in the Area.

Section 27. Borrowing money

(1) The Authority shall be deemed to be a „Local Authority‟ for the purpose of borrowing money and any scheme or project prepared or undertaken by the Authority shall be deemed to be “work” as defined in section 2 of the Local Authorities Loans Ordinance, 1914 (IX of 1914).

30Omitted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.18.

(2) The Authority may, in consultation with its financial advisors, borrow money from the financial institutions or raise funds or finances by issuing bonds or debentures for carrying out the purposes of this Act, at such rate of interest as may be approved by the Authority.

(3) The Authority shall have powers to arrange foreign direct investments on any of its schemes, projects or undertakings.

Section 28. Power to levy betterment fee

Where, as a consequence of any scheme having been executed by the Authority, the value of any property in that locality, in the opinion of the Authority, has increased or is likely to be increased, the Authority may levy fee upon the owner of the property or any person having an interest therein such betterment fee in respect of the increase in value of the property resulting from the execution of the scheme as may be assessed by the Authority in such manner as may be prescribed by the regulations.

Section 29. Assessment of betterment fee

(1) When it appears to the Authority that any particular development scheme is sufficiently advanced to enable the amount of the betterment fee to be determined, the Authority may, by an order made in this behalf, declare that for the purpose of determining the betterment fee, the execution of the scheme shall be deemed to have been completed and shall thereupon give notice in writing to the owner of the property, or any person having an interest therein that the Authority proposes to assess the amount of the betterment fee in respect of the property.

(2) The betterment fee under subsection (1) shall be assessed and be payable, in such manner as may be prescribed.

Section 30. Liability to acquisition

(1) Notwithstanding anything contained in the Land Acquisition Act, 1894 (I of 1894), or in any other law for the time being in force, any land within the Area shall be liable to acquisition at any time in accordance with the provisions of this Act.

(2) The Authority may acquire or purchase in a transparent manner any immovable property or land for any public purpose including development of housing, commercial purposes or any other scheme, urban renewal, redevelopment, environmental improvement or removal of source of pollution or traffic congestion.

[31] Section 31. Acquisition of land

Subject to the provisions of this Act and the regulations, the Authority may acquire an immovable property in the following modes:

(a) under the Land Acquisition Act, 1894 (I of 1894) and such acquisitions shall be deemed to be for public purpose;

(b) through a contract of purchase, lease, exchange and through the Authority land procurement models as may be approved by the Board; and

(c) by way of transfer, lease or grant from the Government or the Federal Government.]

[32] Section 32. Use of public and private land

Notwithstanding the provisions of any other law and subject to this Act, the Authority may, with consent of respective

31Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.19.

Government or any person and on such mutually agreed terms and conditions, use any state or private land belonging to the Federal, Provincial Government or any private person for the purpose of any scheme, project or phase of master plan on profit or revenue sharing basis within the Area.]

Section 33. Purchase, lease or exchange of property

The Authority may, by negotiations 33[*****], purchase, lease or exchange any land or building or any other property by entering into any agreement with the owner of the property or a person competent to sell, lease out or exchange such property or enter into joint venture for the development of any site, project, building and scheme.

[34] Section 34. Joint ventures and outsourcing

(1) Notwithstanding the provisions contained in the Punjab Public Private Partnership Act 2019 (XXX of 2019) and the Punjab Procurement Regulatory Authority Act, 2009 (VIII of 2009), and subject to such terms and conditions as may be prescribed by the regulations and until so prescribed as may be approved by the Board, for performance of its functions under this Act, the Authority may:

(a) enter into any joint venture agreement with any Government agency or organization, any local or foreign company to manage, sale, develop, maintain, build and transfer any land, plot, estate or property in the area including that vested in or owned by the Authority; and

(b) outsource any of its activities including development works through any mode including public private partnership.

(2) The Joint Venture Agreements or public private partnership Agreements under subsection (1) may be executed by the CEO or any other employee of the Authority as may be authorized by the Board.

(3) Notwithstanding anything contained in the Punjab Procurement Regulatory Authority Act, 2009 (VIII of 2009), any rules and regulations made thereunder, the Authority may, by the regulations, prescribe methods and procedures for undertaking public procurements under this Act and such prescribed methods shall exclusively govern procurements by the Authority.]

Section 35. Fund

(1) There shall be created a fund to be known as „the 35[Punjab] Central Business District Development Authority Fund‟ which shall vest in the Authority and shall be utilized by the Authority in connection with its functions under this Act including the payment of salaries, pensions and other remunerations to the members, officers, servants, experts and consultants of the Authority.

(2) The Fund shall consist of:

(a) grants and loans made by the Government;

32Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.20.

33Omitted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.21.

34Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.22.

35Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

(b) all moneys received from Federal Government or the Government in a form of loans or any inter-national agency by way of grants, donations loans, advances or revenues from joint venture, outsourcing agreements or otherwise;

(c) all fees, rates and charges received by the Authority under this Act;

(d) all moneys received by the Authority from the disposal of lands, buildings and other properties, movable and immovable;

(e) proceeds from the self-financing schemes of urban development and environmental sanitation; and

(f) all other sums receivable by the Authority.

(3) The sums under subsection (2) in respect of services related to water supply, sewerage and drainage shall be credited separately to the head „water supply and sanitation‟ and all other sums to the head 36[Punjab] Central Business District Development”; and the sums credited to the head „water supply and sanitation‟ shall be exclusively utilized for the purposes of water supply, sewerage and drainage.

(4) In case of deficit revenue of the Authority, the Government may provide loans, repayable in a prescribed manner, from its own revenues or from any other source, such sum as may be necessary for the efficient performance of the functions of the Authority under this Act.

(5) The Authority may keep in current account of any scheduled bank or banks such sum as may be 37[determined by it] by the regulation and any amount in excess of the said amount may be invested in investments schemes of nation or international institutions or may also be invested into Government securities, Government sponsored saving schemes or in such manner as may be determined by the Authority.

Section 36. Rates and fees

(1) The Authority may raise adequate funds to meet the cost of planning, expansion, execution, development, redevelopment, maintenance, zoning, classification, reclassification, augmentation, supervision, regulation and conversion of any property or any present and future scheme or any part of the scheme, by imposing rates, fees, surcharge, other charges and fines in the prescribed manner within the Area.

(2) The Authority may, in the prescribed manner, impose fee on change of land use owing to classification and reclassification.

(3) The rates, fees and other charges for water supply, sewerage and drainage schemes shall be such as to provide sufficient revenues:

(a) to cover the operating expenses including taxes, if any, and interest to provide adequate maintenance and depreciation;

(b) to meet repayments on long term indebtedness to the extent that such repayments exceed the provision of depreciation; and

(c) to finance the normal year to year extension of any of such schemes and to provide a reasonable portion of the cost of future major expansion of such schemes.

36Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3.

37Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.23.

Section 37. Fees on tube-wells

(1) The Authority shall have the exclusive right to use ground water resources within the Area.

(2) No person shall install a tube-well in the Area without the permission of the Authority.

(3) The Authority may, in the prescribed manner, levy rate on any person who has installed or intends to install tube-well within the Area.

(4) Any person violating the provisions of subsection (2) shall be liable to punishment under this Act along with closure or sealing of the tube-well by the Authority.

Section 38. Recovery of dues

Any sum due to the Authority from, or any sum wrongly paid by the Authority to, any person under this Act, shall be recoverable as arrears of land revenue.

Section 39. Conversion of property to a different use

If a person converts a property to a different use or purpose than the one provided under a scheme, Master Plan or classification map without the previous approval in writing of the Authority, he shall be liable to punishment of fine which may extend to ten thousand rupees per day from the date of its conversion till the default continues or with imprisonment for a term which may extend to one year or with both.

Section 40. Ejectment of unauthorized occupants

(1) Subject to an opportunity of hearing, the CEO or any person authorized by the CEO may summarily eject any person in unauthorized occupation of any land or property vested in the Authority and may for such ejectment use such force as may be necessary.

(2) Subject to an opportunity of hearing, the CEO or any person authorized by him may, on his own motion or on the application of the owner, summarily eject any person in unauthorized occupation of any land or plot in a housing scheme developed and controlled by the Authority and may, for such ejectment, use such force as may be necessary.

(3) Nothing contained in subsections (1) and (2) shall prohibit the CEO or any person authorized by him to proceed against such person on commission of an offence as provided in this Act.

Section 41. Removal of buildings

(1) If any building, structure, work or land is erected, constructed or used in contravention of the provisions of this Act or of any rule, regulation or order made thereunder, the CEO or any person authorized by him or the Authority in this behalf, may, by an order in writing, require the owner, occupier, user or person in control of such building, structure, work or land to remove, demolish or alter the building, structure or work or to use it in such manner so as to bring such erection, construction or use in accordance with the provisions of this Act.

(2) If an order under subsection (1) in respect of any building, structure, work or land is not complied with within such time as may be specified therein, the CEO or any person authorized by him, may, after giving the person affected by the order an opportunity of being heard, remove, demolish or alter the building, structure or work, or stop the use of the land by sealing the premises or land and, in so doing, may use such force as may be necessary and may also recover the cost therefor, from the person responsible for the erection, construction or use of the building, structure, work or land in contravention of the provisions as aforesaid.

Section 42. Accounts

The Authority shall maintain proper accounts and other relevant records and prepare annual statement of accounts in such form as may be 38[determined].

[39] Section 43. Budget

The CEO shall prepare a budget in respect of the financial year next ensuing showing the estimated receipts and expenditure of the Authority and each of its Agencies and shall submit the same to the Board for approval:

provided that the Authority shall maintain its own schedule of rates and costs for its projects and schemes to be approved by the Board, and until such schedule is approved, the rates determined through engineering estimates by approved engineering consultants shall be used by the Authority.]

Section 44. Audit

The accounts of the Authority shall be maintained and audited in such manner as may be prescribed.

Section 45. Annual report

(1) The Authority shall prepare for every year a report of its activities during that year and submit the report to the Government in such form and on or before such date, as may be prescribed.

(2) The Government shall lay the annual report of the Authority in the Provincial Assembly of the Punjab.

Section 46. Members, officers and employees to be public servants

The members, CEO, officers, servants, experts and consultants of the Authority or the Director General shall, when acting or purporting to act under this Act in pursuance of any of the provisions of this Act, be deemed to be public servants within the meaning of section 21 of the Pakistan Penal Code, 1860 (XLV of 1860).

Section 47. Immunity

No suit, prosecution or any other legal proceedings shall lie against the Authority, CEO, any member, officer, servant, expert or consultant of the Authority or the Director General, in respect of anything done or intended to be done in good faith under this Act.

Section 48. Jurisdiction of courts barred

Save as otherwise provided by this Act, no court or authority shall have jurisdiction to question the legality of anything done or any action taken under this Act, by or at the instance of the Authority.

Section 49. Overriding effect

In the event of any conflict or inconsistency between the provisions of this Act and the provisions of any other law, the provisions of this Act shall prevail to the extent of such inconsistency or conflict.

Section 50. Amendment of Schedule

The Government may, by notification in the official Gazette, amend the 40[Schedules].

Section 51. Removal of difficulties

If any difficulty arises in giving effect to any provision of this Act, the Government, at any time, may make such orders or give such directions as are necessary to remove such difficulty.

38Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.24.

39Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.25.

40Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.26.

Section 52. Power to make rules

The Government may by notification in the official Gazette, make rules for carrying out the purpose of this Act.

Section 53. Power to frame regulations

Subject to the provisions of this Act, the Board may make regulations as may be necessary, to carry out the purposes of this Act.

Section 54. Municipal and local government functions

(1) Notwithstanding anything contained in any other law for the time being in force , the Government may, by notification in the official Gazette, specify that the Authority may exercise and perform such powers and functions for the Area as municipal administration or local government may exercise and perform in relation to municipal function under the law for time being in force.

(2) Notwithstanding anything contained in the Punjab Local Government Act, 2019 (XIII of 2019), any rules and regulations made thereunder or any other law for time being in force, the Authority may by regulations, prescribe methods and procedures for undertaking municipal and local government functions under this Act, and such regulations shall exclusively govern the local government function by the Authority.

Section 55. Penalty

(1) If a person contravenes any provision of this Act, or any rules or regulations made under this Act, he shall, if no other penalty is provided for such contravention, be punishable with imprisonment for a term which may extend to one year or with fine which may extend to two hundred thousand rupees or with both.

(2) The Magistrate competent to try an offence under subsection (1) may try the offence in a summary manner in accordance with the provisions of sections 260 to 265 of the Code of Criminal Procedure, 1898 (V of 1898).

Section 56. Offences and cognizance

(1) If a person commits an offence specified in:

(a) Part-A of the 41[SECOND SCHEDULE], such person shall be liable to imprisonment for a term which may extend to seven years or fine which may extend to seven hundred thousand rupees or with both and where an accused was directed by the Authority for immediate discontinuance of the offence, the Court may impose a further fine which may extend to fifty thousand rupees for every day for the period the accused has persisted in the offence from the date of its commission; and

(b) Part-B of the 42[SECOND SCHEDULE], he shall be liable to imprisonment for a term which may extend to three years or fine which may extend to five hundred thousand rupees or with both and where an accused was directed by the Authority for immediate discontinuance of the offence, the Court may impose a further fine which may extend to ten thousand rupees per day for the period the offence continues.

41Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.27.

42Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.27.

(2) An offence punishable under subsection (1) shall be cognizable on a complaint in writing of an officer authorized by the Authority.

Section 57. Repeal

The Lahore Central Business District Development Authority Ordinance 2021 (IV of 2021) is hereby repealed.

43FIRST SCHEDULE [See section 2(b)] Area of the Authority

1. Lahore:

A. Walton Airport and Bab-e-Pakistan (3128 kanals approximately) having the following details:

(i) Boundary references:

Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Geographic Coordinate System/ Latitude and Longitude (GCS Lat Long WGS84)

Boundary Reference Point ID Longitude Latitude East E1/N10 74° 21' 18.540” E 31° 29' 21.175” N E2 74° 21' 9.227” E 31° 29' 4.064” N E2/S1 74° 21' 40.095” E 31° 28' 53.763” N North N1/W12 74° 19' 55.720” E 31° 30' 23.665” N N2 74° 20' 8.509” E 31° 30' 25.507” N N3 74° 20' 9.325” E 31° 30' 24.095” N N4 74° 20' 21.776” E 31° 30' 32.365” N N5 74° 20' 23.261” E 31° 30' 31.476” N N6 74° 20' 11.824” E 31° 30' 21.564” N N7 74° 20' 35.843” E 31° 29' 58.208” N N8 74° 20' 34.110” E 31° 29' 56.822” N N9 74° 21' 11.941” E 31° 29' 22.683” N West W1/S3 74° 21' 0.422” E 31° 28' 51.433” N W2 74° 21' 10.057” E 31° 29' 9.837” N W3 74° 21' 3.170” E 31° 29' 21.601” N W4 74° 20' 55.843” E 31° 29' 16.368” N W5 74° 20' 49.028” E 31° 29' 30.205” N W6 74° 20' 52.268” E 31° 29' 31.439” N W7 74° 20' 10.430” E 31° 30' 13.288” N W8 74° 20' 4.309” E 31° 30' 8.270” N W9 74° 20' 2.651” E 31° 30' 11.543” N W10 74° 19' 56.738” E 31° 30' 9.908” N

43Added by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.28.

Boundary Reference Point ID Longitude Latitude W11 74° 19' 53.694” E 31° 30' 17.049” N South S2 74° 21' 27.605” E 31° 28' 40.524” N

(ii) Boundary description:

NORTH:

The Northern Boundary of jurisdiction starts from the reference point N1/W12 moving along the northern boundary of Saint Mary Park (National Bank Park) (Including side road) towards East, up to reference point N2 falling exactly on Hali Road till N3 and it moves towards northeast up to the reference point N4 exactly on Main Boulevard Road towards Liberty Square and then up to the reference point N4 it moves towards N5 near United Christian Hospital. From reference point, N5 moves towards the southwest on Main Boulevard Road towards Kalma Square up to the reference point N6 and move towards the south along Falcon Complex Road till N7, excluding the boundary of Falcon Complex, move up to reference point N8. From N8 it moves towards southeast along the Falcon Complex Boundary excluding model Colony Up to the reference point N9 and towards the reference point E1/N10 on Railway Line. EAST:

From the reference point E1/N10 moving towards west south along the railway line excluding Railway Officers Colony Boundary, to the reference point E2. From the reference Point E2, it moves towards the southeast direction along Bab e Pakistan boundary till Walton Road at reference point E3/S1 excluding the Civil Service Academy Area and including Bab-e- Pakistan area. SOUTH:

From the reference point E3/S1 moving along Walton Road till the reference point S2 and then move towards the northwest along the Bab-e- Pakistan Road up to the reference point W1/S3 crossing Hall Road and Railway Track. WEST:

From the reference point W1/S3 in the North-East direction including areas of the WCB, move towards the reference point W2. From the reference point W2, it moves towards Northwest direction up to the reference Point W3 excluding the Walton Airport Military Area. From W3 move towards so southwest direction up to the reference point W4 connecting to Yasir Shaheed Road. From W4 it moves towards the northwest along Yasir Shaheed Road excluding the Pakistan Navy College and then moves towards North East along Walton Boundary till reference Point W5. From W5 it moves towards W6 in the northeast direction along the Naval Complex boundary. From W6 in the northwest direction along the boundary of Askari-V Flats, From reference point W6 it continues moving along the Walton boundary till W7, and then it moves towards west till reference point W8 (SW corner of the park), W9 North corner of the park on Aqa Khail

road. Along the nursery road, it moves towards the west up to reference point W10 on Ferozepur Road. From reference point W10, it moves towards North till Kalma Square including the Kalma Chowk Garden and Main Boulevard Gulberg Road to W11 and then connects with the Saint Mary‟s Park Road till the reference point N1W12.

(iii) Boundary Map:

(iv) Boundary Coordinates:

ID Longitude Latitude ID Longitude Latitude 1 31° 28' 40.524" N 74° 21' 27.605" E 39 31° 30' 25.269" N 74° 20' 6.362" E 2 31° 28' 47.233" N 74° 21' 9.691" E 40 31° 30' 24.684" N 74° 20' 6.759" E 3 31° 28' 51.325" N 74° 21' 0.308" E 41 31° 30' 25.507" N 74° 20' 8.509" E 4 31° 29' 9.837" N 74° 21' 10.057" E 42 31° 30' 24.095" N 74° 20' 9.325" E

B. Wahdat Colony (1,771 kanals approximately) having the following details:

(i) Boundary references:

Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Geographic Coordinate System/ Latitude and Longitude (GCS Lat Long WGS84)

5 31° 29' 9.745" N 74° 21' 7.783" E 43 31° 30' 32.365" N 74° 20' 21.776" E 6 31° 29' 13.900" N 74° 21' 7.097" E 44 31° 30' 31.476" N 74° 20' 23.261" E 7 31° 29' 14.454" N 74° 21' 7.386" E 45 31° 30' 23.462" N 74° 20' 11.651" E 8 31° 29' 17.317" N 74° 21' 6.375" E 46 31° 30' 21.564" N 74° 20' 11.824" E 9 31° 29' 21.601" N 74° 21' 3.170" E 47 31° 30' 12.089" N 74° 20' 20.953" E 10 31° 29' 19.908" N 74° 20' 59.849" E 48 31° 29' 58.208" N 74° 20' 35.843" E 11 31° 29' 19.046" N 74° 21' 0.246" E 49 31° 29' 56.822" N 74° 20' 34.110" E 12 31° 29' 16.368" N 74° 20' 55.843" E 50 31° 29' 42.086" N 74° 20' 50.440" E 13 31° 29' 16.799" N 74° 20' 55.266" E 51 31° 29' 22.683" N 74° 21' 11.941" E 14 31° 29' 17.538" N 74° 20' 55.266" E 52 31° 29' 23.145" N 74° 21' 13.530" E 15 31° 29' 29.161" N 74° 20' 49.417" E 53 31° 29' 21.175" N 74° 21' 18.540" E 16 31° 29' 30.238" N 74° 20' 49.092" E 54 31° 29' 16.665" N 74° 21' 16.229" E 17 31° 29' 31.439" N 74° 20' 52.268" E 55 31° 29' 14.815" N 74° 21' 15.877" E 18 31° 29' 36.863" N 74° 20' 47.703" E 56 31° 29' 13.623" N 74° 21' 15.548" E 19 31° 29' 37.232" N 74° 20' 47.956" E 57 31° 29' 12.232" N 74° 21' 15.038" E 20 31° 29' 47.133" N 74° 20' 36.618" E 58 31° 29' 10.334" N 74° 21' 13.937" E 21 31° 29' 45.871" N 74° 20' 34.632" E 59 31° 29' 9.233" N 74° 21' 13.299" E 22 31° 29' 52.701" N 74° 20' 27.256" E 60 31° 29' 8.435" N 74° 21' 12.836" E 23 31° 29' 53.501" N 74° 20' 28.302" E 61 31° 29' 7.732" N 74° 21' 11.987" E 24 31° 29' 56.948" N 74° 20' 24.728" E 62 31° 29' 6.728" N 74° 21' 10.774" E 25 31° 29' 57.841" N 74° 20' 25.811" E 63 31° 29' 6.403" N 74° 21' 10.382" E 26 31° 29' 59.719" N 74° 20' 23.753" E 64 31° 29' 5.764" N 74° 21' 10.066" E 27 31° 30' 0.242" N 74° 20' 24.078" E 65 31° 29' 4.064" N 74° 21' 9.227" E 28 31° 30' 2.386" N 74° 20' 22.325" E 66 31° 29' 3.818" N 74° 21' 9.840" E 29 31° 30' 4.871" N 74° 20' 19.294" E 67 31° 29' 4.095" N 74° 21' 10.057" E 30 31° 30' 5.566" N 74° 20' 18.316" E 68 31° 29' 3.137" N 74° 21' 12.551" E 31 31° 30' 13.288" N 74° 20' 10.430" E 69 31° 29' 1.571" N 74° 21' 16.626" E 32 31° 30' 9.908" N 74° 19' 56.738" E 70 31° 29' 1.940" N 74° 21' 17.492" E 33 31° 30' 16.980" N 74° 19' 53.712" E 71 31° 29' 2.710" N 74° 21' 17.998" E 34 31° 30' 17.910" N 74° 19' 56.909" E 72 31° 28' 58.735" N 74° 21' 27.814" E 35 31° 30' 23.665" N 74° 19' 55.720" E 73 31° 28' 53.763" N 74° 21' 40.095" E 36 31° 30' 23.840" N 74° 19' 57.348" E 74 31° 28' 47.143" N 74° 21' 33.850" E 37 31° 30' 24.282" N 74° 19' 57.264" E 75 31° 28' 40.591" N 74° 21' 5.183" E 38 31° 30' 24.930" N 74° 20' 4.196" E 76 31° 28' 44.203" N 74° 20' 56.349" E

Boundary Reference Point ID Longitude Latitude NORTH N1 31°31'14.10"N 74°18'49.49"E N2 31°31'6.11"N 74°18'14.50"E N3 31°31'4.14"N 74°18'14.38"E N4 31°31'2.53"N 74°18'11.05"E N5 31°31'5.33"N 74°18'9.92"E EAST E1 31°31'1.41"N 74°18'57.47"E SOUTH S1 31°30'41.61"N 74°18'15.50"E WEST W1 31°31'4.51"N 74°17'59.84"E

(ii) Boundary description:

EAST:

The Eastern boundary starts from Naqsha Stop along Wahdat Road at reference point E1. NORTH:

From reference point E1 it moves in north direction adjacent to Wahdat link road till T Junction at reference point N1 meeting at Shuja Road. From reference point N1 the boundary moves west along Shuja road through the points N2, N3, N4 and N5 respectively. WEST:

From reference point N5, it moves to west connecting at reference point W1 at Link Wahdat road opposite to Pak Block, Allama Iqbal Town. SOUTH:

From reference point W1, it moves along Link Wahdat Road to connect at point S1 at Wahdat Road.

(iii) Boundary Map:

(iv) Boundary Coordinates:

ID Longitude Latitude N1 31°31'14.10"N 74°18'49.49"E N2 31°31'6.11"N 74°18'14.50"E N3 31°31'4.14"N 74°18'14.38"E N4 31°31'2.53"N 74°18'11.05"E N5 31°31'5.33"N 74°18'9.92"E E1 31°31'1.41"N 74°18'57.47"E S1 31°30'41.61"N 74°18'15.50"E W1 31°31'4.51"N 74°17'59.84"E

44[C. RESCUE 1122 Site LOS, Ferozepur Road (68 kanals approximately) having the following details:

(i) Boundary references: Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Geographic Coordinates System/Latitude and Longitude (GCS Lat Long WGS84)

Boundary Reference Point ID Longitude Latitude East E1 74° 19' 2.009" E 31° 32' 32.119" N E2 / S3 74° 19' 5.029" E 31° 32' 28.088" N North N1 74° 18' 57.508" E 31° 32' 32.014" N N2 74° 18' 57.594" E 31° 32' 31.766" N N3 74° 19' 0.673" E 31° 32' 32.423" N N4 74° 19' 0.830" E 31° 32' 31.868" N West W1 74° 18' 54.113" E 31° 32' 31.239" N W2 74° 18' 53.876" E 31° 32' 30.096" N South S1 74° 19' 3.930" E 31° 32' 26.335" N S2 74° 19' 3.464" E 31° 32' 27.735" N

(ii) Boundary description:

EAST:

44Inserted by the Notification No. SO(UD)16-5/2023, dated: 15-09-2023 vide notification no.162 of 2023, published in the Punjab Gazette (Extraordinary), dated: 06 October 2023, pp, 963-967.

From the reference point E1, it moves towards the south east direction along the Los Stop till Ferozepur Road at reference point E2/S3. NORTH:

From the reference point E1, it moves in the north direction adjacent to T Junction till Ferozepur link road at reference point N1. From reference point N1, the boundary moves west along link Ferozepur road through the points N2, N3, and N4 respectively. WEST:

From the reference point N1, it moves to west connecting at reference point W1 at Link Ferozepur road opposite Jinnah Town. From reference point W1, the boundary moves west along the strom water channel (Nullah) through the point W2. SOUTH:

From the reference point W2, it moves along strom water channel

(Nullah) to connect at point S1 at Ferozepur Road. From the reference point S1, the boundary moves along Ferozepur Road till the reference point S2 opposite PMA trade center and then move towards the east south along the Ferozepur Road up to the reference point E2/S3.

(iii) Boundary Map:

(iv) Boundary Coordinates:

ID Longitude Latitude 1 74° 18' 53.888" E 31° 32' 30.531" N 2 74° 18' 53.894" E 31° 32' 30.132" N 3 74° 18' 53.980" E 31° 32' 30.823" N 4 74° 18' 53.987" E 31° 32' 30.823" N 5 74° 18' 54.113" E 31° 32' 31.232" N 6 74° 18' 57.885" E 31° 32' 31.848" N 7 74° 19' 0.684" E 31° 32' 32.337" N 8 74° 19' 0.749" E 31° 32' 32.343" N 9 74° 19' 0.798" E 31° 32' 31.978" N 10 74° 19' 0.811" E 31°32' 31.982" N 11 74° 19' 1.999" E 31° 32' 32.114" N 12 74° 19' 2.162" E 31° 32' 31.916" N 13 74° 19' 2.404" E 31° 32' 31.621" N 14 74° 19' 2.509" E 31° 32' 31.517" N 15 74° 19' 3.455" E 31° 32' 30.688" N 16 74° 19' 3.581" E 31° 32' 30.548" N 17 74° 19' 3.944" E 31° 32' 26.372" N 18 74° 18' 59.179" E 31° 32' 28.353" N 19 74° 18' 59.007" E 31° 32' 28.391" N 20 74° 19' 3.730" E 31° 32' 26.988" N 21 74° 19' 4.474" E 31° 32' 29.036" N 22 74° 19' 4.071" E 31° 32' 29.776" N 23 74° 19' 3.690" E 31° 32' 30.400" N 24 74° 19' 2.800" E 31° 32' 31.298" N]

45[D. LAHORE KNOWLEDGE PARK (NAWAZ SHARIF I.T CITY), Bedian Road (6,320 kanals approximately i.e. 790 acres) having the following details:

(i) Boundary References: Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Universal Transverse Mercator 43N

Boundary Reference Point ID Longitude Latitude NORTH N1/W27 74° 27' 40.488" E 31° 27' 29.908" N N2 74° 27' 53.039" E 31° 27' 25.439" N N3 74° 27' 59.901" E 31° 27' 22.956" N N4 74° 28' 0.314" E 31° 27' 24.942" N N5 74° 27' 59.773" E 31° 27' 34.441" N N6 74° 27' 59.397" E 31° 27' 41.257" N N7 74° 28' 9.831" E 31° 27' 39.363" N N8 74° 28' 14.174" E 31° 27' 38.325" N N9 74° 28' 17.431" E 31° 27' 38.243" N N10 74° 28' 20.940" E 31° 27' 37.596" N N11 74° 28' 24.957" E 31° 27' 35.641" N N12 74° 28' 28.774" E 31° 27' 34.106" N N13 74° 28' 34.925" E 31° 27' 30.910" N N14 74° 28' 39.064" E 31° 27' 28.416" N N15 74° 28' 40.932" E 31° 27' 25.702" N N16 74° 28' 43.956" E 31° 27' 21.924" N N17 74° 28' 45.567" E 31° 27' 20.898" N N18 74° 28' 51.772" E 31° 27' 18.594" N N19 74° 28' 53.707" E 31° 27' 17.160" N N20 74° 28' 58.182" E 31° 27' 12.660" N N21 74° 29' 2.388" E 31° 27' 8.632" N EAST N22/E1 74° 29' 3.152" E 31° 27' 7.626" N E2 74° 29' 3.368" E 31° 27' 6.846" N E3 74° 29' 2.570" E 31° 27' 1.120" N E4 74° 29' 1.267" E 31° 26' 53.771" N E5 74° 29' 0.554" E 31° 26' 51.041" N E6 74° 29' 0.428" E 31° 26' 50.748" N E7 74° 28' 59.788" E 31° 26' 43.638" N E8 74° 28' 59.191" E 31° 26' 42.201" N E9 74° 28' 58.639" E 31° 26' 38.496" N E10 74° 28' 58.296" E 31° 26' 37.988" N E11 74° 28' 57.314" E 31° 26' 34.624" N E12 74° 28' 54.689" E 31° 26' 29.653" N SOUTH E13/S1 74° 28' 52.942" E 31° 26' 25.181" N S2 74° 28' 52.608" E 31° 26' 25.243" N S3 74° 28' 51.408" E 31° 26' 27.299" N S4 74° 28' 49.783" E 31° 26' 27.115" N

45Inserted by the Notification No. SO(H-II)3-3/2021( (P-I) dated: 11-11-2024 vide notification no.167 of 2024, published in the Punjab Gazette (Extraordinary), dated: 21 November 2024, pp, 1431-1439.

S5 74° 28' 44.950" E 31° 26' 33.146" N S6 74° 28' 40.794" E 31° 26' 34.991" N S7 74° 28' 33.647" E 31° 26' 37.188" N S8 74° 28' 32.314" E 31° 26' 37.796" N S9 74° 28' 28.029" E 31° 26' 42.743" N S10 74° 28' 23.546" E 31° 26' 46.467" N S11 74° 28' 22.109" E 31° 26' 46.684" N S12 74° 28' 16.352" E 31° 26' 46.999" N S13 74° 28' 15.078" E 31° 26' 47.310" N S14 74° 28' 14.860" E 31° 26' 47.080" N S15 74° 28' 13.003" E 31° 26' 48.293" N S16 74° 28' 13.236" E 31° 26' 48.524" N S17 74° 28' 12.976" E 31° 26' 48.698" N S18 74° 28' 10.914" E 31° 26' 47.599" N S19 74° 28' 9.193" E 31° 26' 47.811" N S20 74° 28' 8.802" E 31° 26' 47.751" N WEST S21/W1 74° 28' 7.177" E 31° 26' 49.187" N W2 74° 28' 10.011" E 31° 26' 52.028" N W3 74° 28' 6.335" E 31° 26' 56.532" N W4 74° 27' 56.762" E 31° 26' 51.914" N W5 74° 27' 50.515" E 31° 27' 0.771" N W6 74° 27' 42.652" E 31° 27' 11.487" N W7 74° 27' 41.178" E 31° 27' 13.888" N W8 74° 27' 40.708" E 31° 27' 15.614" N W9 74° 27' 40.542" E 31° 27' 17.341" N W10 74° 27' 40.884" E 31° 27' 20.850" N W11 74° 27' 40.753" E 31° 27' 23.843" N W12 74° 27' 40.079" E 31° 27' 26.075" N W13 74° 27' 39.609" E 31° 27' 27.915" N W14 74° 27' 45.247" E 31° 27' 24.221" N W15 74° 27' 57.140" E 31° 27' 20.259" N W16 74° 27' 58.199" E 31° 27' 19.613" N W17 74° 27' 57.780" E 31° 27' 10.330" N W18 74° 27' 57.840" E 31° 27' 0.899" N W19 74° 27' 53.938" E 31° 27' 0.371" N W20 74° 27' 45.523" E 31° 27' 11.565" N W21 74° 27' 43.750" E 31° 27' 14.042" N W22 74° 27' 43.213" E 31° 27' 15.693" N W23 74° 27' 42.979" E 31° 27' 18.738" N W24 74° 27' 43.221" E 31° 27' 21.797" N W25 74° 27' 45.134" E 31° 27' 21.163" N W26 74° 27' 45.439" E 31° 27' 22.054" N N1/W27 74° 27' 40.488" E 31° 27' 29.908" N Note:

Area and boundary references are as per site survey of the land taking reference mainly from offset of existing wall and excluding PKLI area but including front road of PKLI.

(ii) Boundary Description: NORTH:

The northern boundary of jurisdiction start from the reference point N1/W27 (74° 27' 40.488" E,31° 27' 29.908” N) which is placed near the entrance gate of PKLI connected to the Avenue 5 and it moves towards the Eastern side along Avenue 12 which passes through the reference point N2 (74° 27' 53.039" E,31° 27' 25.439” N), N3 (74° 27' 59.901" E,31° 27' 22.956” N) & N4 (74° 28' 0.314" E,31° 27' 24.942”

N) towards T-Junction between the Avenue 8 and the Avenue 9 having the reference point N5 (74° 27' 59.773" E,31° 27' 34.441” N), N6 (74° 27' 59.397" E,31° 27' 41.257” N) moves toward Dera Khundadad where reference point N7 (74° 28' 9.831" E,31° 27' 39.363” N), N8 (74° 28' 14.174" E,31° 27' 38.325” N) is placed passing alongside Sector Z1 towards east west, from reference point N9 (74° 28' 17.431" E,31° 27' 38.243” N), N10 (74° 28' 20.940" E,31° 27' 37.596” N), N11 (74° 28' 24.957" E,31° 27' 35.641” N), N12 (74° 28' 28.774" E,31° 27' 34.106” N) & N13 (74° 28' 34.925" E,31° 27' 30.910” N) it passes alongside sector where reference point N14 (74° 28' 39.064" E,31° 27' 28.416” N),N15 (74° 28' 40.932" E,31° 27' 25.702” N),N16 (74° 28' 43.956" E,31° 27' 21.924” N),N17 (74° 28' 45.567" E,31° 27' 20.898” N),N18 (74° 28' 51.772" E,31° 27' 18.594” N),N19 (74° 28' 53.707" E,31° 27' 17.160” N),N20 (74° 28' 58.182" E,31° 27' 12.660” N) and N21 (74° 29' 2.388" E,31° 27' 8.632” N) is exactly placed on the northeast side of Alfatah Cricket Ground Knowledge Park Lahore from that point it finally end at the last reference point N22/E1 besides Defence Raya Golf Resort till reference point N22/E1 (74° 29' 3.152" E,31° 27' 7.626” N). EAST:

From reference point N22/E1 (74° 29' 3.152" E,31° 27' 7.626” N) at Avenue 13 from north to south is placed on the road behind the school, It moves alongside to west of sector Y towards the Southern side through E2 (74° 29' 3.368" E,31° 27' 6.846” N),E3 (74° 29' 2.570" E,31° 27' 1.120” N),E4 (74° 29' 1.267" E,31° 26' 53.771” N),E (74° 29' 0.554" E,31° 26' 51.041” N),E6 (74° 29' 0.428" E,31° 26' 50.748” N),E7 (74° 28' 59.788" E,31° 26' 43.638” N),E8 (74° 28' 59.191" E,31° 26' 42.201” N),E9 (74° 28' 58.639" E,31° 26' 38.496” N),E10 (74° 28' 58.296" E,31° 26' 37.988” N),E11 (74° 28' 57.314" E,31° 26' 34.624” N) & E12 (74° 28' 54.689" E,31° 26' 29.653” N) to the west of Dera Chanal till reference point E13/S1 (74° 28' 52.942" E,31° 26' 25.181” N) adjacent to Rohi Nala towards Block H. SOUTH:

From reference point E13/S1 (74° 28' 52.942" E,31° 26' 25.181” N) it moves to West towards Dera Chahal and passes through the reference points S2 (74° 28' 52.608" E,31° 26' 25.243” N),S3 (74° 28' 51.408" E,31° 26' 27.299” N),S4 (74° 28' 49.783" E,31° 26' 27.115” N),S5 (74° 28' 44.950" E,31° 26' 33.146” N),S6 (74° 28' 40.794" E,31° 26' 34.991” N),S7 (74° 28' 33.647" E,31° 26' 37.188” N),S8 (74° 28' 32.314" E,31° 26' 37.796” N),S9 (74° 28' 28.029" E,31° 26' 42.743”

N) & S10 (74° 28' 23.546" E,31° 26' 46.467” N) connecting to S11 (74° 28' 22.109" E,31° 26' 46.684” N) near Elite Police Force Headquarters which moves towards the points S12 (74° 28' 16.352"

E,31° 26' 46.999” N),S13 (74° 28' 15.078" E,31° 26' 47.310” N), S14 (74° 28' 14.860" E,31° 26' 47.080” N),S15 (74° 28' 13.003" E,31° 26' 48.293” N),S16 (74° 28' 13.236" E,31° 26' 48.524” N),S17 (74° 28' 12.976" E,31° 26' 48.698” N),S18 (74° 28' 10.914" E,31° 26' 47.599” N),S19 (74° 28' 9.193" E,31° 26' 47.811” N) & S20 (74° 28' 8.802" E,31° 26' 47.751” N) and the last reference point of South is ends at the back of Elite Police Force Headquarters S21/W1 (74° 28' 7.177" E,31° 26' 49.187” N). WEST:

S21/W1 (74° 28' 7.177" E,31° 26' 49.187” N), W2 (74° 28' 10.011" E,31° 26' 52.028” N) placed near residential houses through W3 (74° 28' 6.335" E,31° 26' 56.532” N), W4 (74° 27' 56.762" E,31° 26' 51.914” N) to W5 (74° 27' 50.515" E,31° 27' 0.771” N) which is placed near Chota Mota Singh. From reference point W6 (74° 27' 42.652" E,31° 27' 11.487” N), W7 (74° 27' 41.178" E,31° 27' 13.888” N), W8 (74° 27' 40.708" E,31° 27' 15.614” N), W9 (74° 27' 40.542" E,31° 27' 17.341” N), W10 (74° 27' 40.884" E,31° 27' 20.850” N), W11 (74° 27' 40.753" E,31° 27' 23.843” N), W12 (74° 27' 40.079" E,31° 27' 26.075” N), W13 (74° 27' 39.609" E,31° 27' 27.915” N) is ended the front side of Pakistan Kidney & Liver Institute and Research Center and connected at N1/W27 (74° 27' 40.488" E,31° 27' 29.908”

N) Near Sector – E DHA Phase 9 at Northern Side. The reference point of PKLI boundary which passes through W19 (74° 27' 53.938" E,31° 27' 0.371” N) which is placed near ARCOP consultant QS Section, which is then connected to reference point W18 (74° 27' 57.840" E,31° 27' 0.899” N) placed on the road passing alongside the Pakistan Kidney & Liver Institute and Research Centre & from that boundary moves towards the reference point W15 (74° 27' 57.140" E,31° 27' 20.259” N), & W16 (74° 27' 58.199" E,31° 27' 19.613” N) place at the corner point of schools GGCMS Lehna Singh extent at Avenue 5 and from there it connects to the boundary of PKLI having reference point W20 (74° 27' 45.523" E,31° 27' 11.565” N), W21 (74° 27' 43.750" E,31° 27' 14.042” N), W22 (74° 27' 43.213" E,31° 27' 15.693” N), W23 (74° 27' 42.979" E,31° 27' 18.738” N), W24 (74° 27' 43.221" E,31° 27' 21.797” N), W25 (74° 27' 45.134" E,31° 27' 21.163” N) & W26 (74° 27' 45.439" E,31° 27' 22.054” N).

(iii) Boundary Map:

(iv) Boundary Coordinates: ID Longitude Latitude ID Longitude Latitude 1 74° 28' 14.848" E 31° 27' 38.256" N 98 74° 28' 29.812" E 31° 26' 40.642" N 2 74° 28' 15.807" E 31° 27' 38.206" N 99 74° 28' 29.477" E 31° 26' 41.034" N 3 74° 28' 16.596" E 31° 27' 38.234" N 100 74° 28' 28.985" E 31° 26' 41.629" N 4 74° 28' 17.431" E 31° 27' 38.243" N 101 74° 28' 28.029" E 31° 26' 42.743" N 5 74° 28' 18.060" E 31° 27' 38.194" N 102 74° 28' 27.595" E 31° 26' 43.288" N 6 74° 28' 18.997" E 31° 27' 38.076" N 103 74° 28' 27.045" E 31° 26' 43.796" N 7 74° 28' 19.626" E 31° 27' 37.929" N 104 74° 28' 25.980" E 31° 26' 44.633" N 8 74° 28' 20.357" E 31° 27' 37.733" N 105 74° 28' 24.995" E 31° 26' 45.426" N 9 74° 28' 20.940" E 31° 27' 37.596" N 106 74° 28' 23.546" E 31° 26' 46.467" N 10 74° 28' 22.382" E 31° 27' 36.824" N 107 74° 28' 22.109" E 31° 26' 46.684" N 11 74° 28' 22.828" E 31° 27' 36.609" N 108 74° 28' 18.425" E 31° 26' 46.910" N 12 74° 28' 24.957" E 31° 27' 35.641" N 109 74° 28' 16.352" E 31° 26' 46.999" N 13 74° 28' 25.825" E 31° 27' 35.260" N 110 74° 28' 15.627" E 31° 26' 47.124" N 14 74° 28' 26.236" E 31° 27' 35.064" N 111 74° 28' 15.078" E 31° 26' 47.310" N 15 74° 28' 27.995" E 31° 27' 34.364" N 112 74° 28' 14.860" E 31° 26' 47.080" N 16 74° 28' 28.774" E 31° 27' 34.106" N 113 74° 28' 13.003" E 31° 26' 48.293" N 17 74° 28' 29.540" E 31° 27' 33.764" N 114 74° 28' 13.236" E 31° 26' 48.524" N 18 74° 28' 30.458" E 31° 27' 33.295" N 115 74° 28' 12.976" E 31° 26' 48.698" N 19 74° 28' 31.052" E 31° 27' 33.002" N 116 74° 28' 10.914" E 31° 26' 47.599" N 20 74° 28' 32.411" E 31° 27' 32.278" N 117 74° 28' 10.581" E 31° 26' 47.648" N 21 74° 28' 33.648" E 31° 27' 31.631" N 118 74° 28' 9.193" E 31° 26' 47.811" N 22 74° 28' 34.925" E 31° 27' 30.910" N 119 74° 28' 8.802" E 31° 26' 47.751" N 23 74° 28' 36.003" E 31° 27' 30.312" N 120 74° 28' 7.177" E 31° 26' 49.187" N 24 74° 28' 38.173" E 31° 27' 28.964" N 121 74° 28' 10.011" E 31° 26' 52.028" N 25 74° 28' 39.064" E 31° 27' 28.416" N 122 74° 28' 8.969" E 31° 26' 53.266" N 26 74° 28' 39.609" E 31° 27' 27.518" N 123 74° 28' 8.013" E 31° 26' 54.468" N 27 74° 28' 40.190" E 31° 27' 26.678" N 124 74° 28' 6.335" E 31° 26' 56.532" N 28 74° 28' 40.932" E 31° 27' 25.702" N 125 74° 28' 5.422" E 31° 26' 56.083" N 29 74° 28' 41.776" E 31° 27' 24.540" N 126 74° 28' 2.649" E 31° 26' 54.688" N 30 74° 28' 42.678" E 31° 27' 23.379" N 127 74° 27' 56.762" E 31° 26' 51.914" N 31 74° 28' 43.306" E 31° 27' 22.637" N 128 74° 27' 54.958" E 31° 26' 54.615" N 32 74° 28' 43.956" E 31° 27' 21.924" N 129 74° 27' 53.579" E 31° 26' 56.352" N 33 74° 28' 44.459" E 31° 27' 21.455" N 130 74° 27' 51.919" E 31° 26' 58.827" N 34 74° 28' 44.835" E 31° 27' 21.220" N 131 74° 27' 50.515" E 31° 27' 0.771" N 35 74° 28' 45.567" E 31° 27' 20.898" N 132 74° 27' 42.652" E 31° 27' 11.487" N 36 74° 28' 46.081" E 31° 27' 20.692" N 133 74° 27' 41.178" E 31° 27' 13.888" N 37 74° 28' 47.384" E 31° 27' 20.228" N 134 74° 27' 40.708" E 31° 27' 15.614" N 38 74° 28' 48.847" E 31° 27' 19.709" N 135 74° 27' 40.542" E 31° 27' 17.341" N 39 74° 28' 50.503" E 31° 27' 19.122" N 136 74° 27' 40.884" E 31° 27' 20.850" N 40 74° 28' 51.772" E 31° 27' 18.594" N 137 74° 27' 40.753" E 31° 27' 23.843" N 41 74° 28' 52.874" E 31° 27' 17.815" N 138 74° 27' 40.079" E 31° 27' 26.075" N 42 74° 28' 53.707" E 31° 27' 17.160" N 139 74° 27' 40.081" E 31° 27' 26.087" N 43 74° 28' 54.780" E 31° 27' 16.086" N 140 74° 27' 39.609" E 31° 27' 27.915" N 44 74° 28' 55.522" E 31° 27' 15.325" N 141 74° 27' 40.488" E 31° 27' 29.908" N 45 74° 28' 56.927" E 31° 27' 13.910" N 142 74° 27' 42.582" E 31° 27' 29.336" N 46 74° 28' 58.182" E 31° 27' 12.660" N 143 74° 27' 45.992" E 31° 27' 28.046" N 47 74° 28' 59.598" E 31° 27' 11.215" N 144 74° 27' 53.039" E 31° 27' 25.439" N

48 74° 29' 0.641" E 31° 27' 10.223" N 145 74° 27' 55.900" E 31° 27' 24.371" N 49 74° 29' 2.388" E 31° 27' 8.632" N 146 74° 27' 57.335" E 31° 27' 23.837" N 50 74° 29' 3.152" E 31° 27' 7.626" N 147 74° 27' 59.901" E 31° 27' 22.956" N 51 74° 29' 3.323" E 31° 27' 7.275" N 148 74° 28' 0.090" E 31° 27' 23.414" N 52 74° 29' 3.368" E 31° 27' 6.846" N 149 74° 28' 0.142" E 31° 27' 23.728" N 53 74° 29' 3.287" E 31° 27' 5.801" N 150 74° 28' 0.266" E 31° 27' 24.323" N 54 74° 29' 3.194" E 31° 27' 4.884" N 151 74° 28' 0.314" E 31° 27' 24.942" N 55 74° 29' 3.078" E 31° 27' 3.938" N 152 74° 28' 0.262" E 31° 27' 25.265" N 56 74° 29' 2.939" E 31° 27' 3.099" N 153 74° 28' 0.119" E 31° 27' 26.078" N 57 74° 29' 2.570" E 31° 27' 1.120" N 154 74° 28' 0.094" E 31° 27' 26.921" N 58 74° 29' 2.420" E 31° 27' 0.223" N 155 74° 28' 0.095" E 31° 27' 27.718" N 59 74° 29' 2.316" E 31° 26' 59.423" N 156 74° 28' 0.037" E 31° 27' 29.116" N 60 74° 29' 2.097" E 31° 26' 58.143" N 157 74° 28' 0.024" E 31° 27' 30.504" N 61 74° 29' 1.832" E 31° 26' 56.691" N 158 74° 27' 59.980" E 31° 27' 31.481" N 62 74° 29' 1.544" E 31° 26' 55.452" N 159 74° 27' 59.892" E 31° 27' 32.830" N 63 74° 29' 1.267" E 31° 26' 53.771" N 160 74° 27' 59.773" E 31° 27' 34.441" N 64 74° 29' 1.048" E 31° 26' 52.786" N 161 74° 27' 59.685" E 31° 27' 35.777" N 65 74° 29' 0.772" E 31° 26' 51.860" N 162 74° 27' 59.577" E 31° 27' 37.549" N 66 74° 29' 0.554" E 31° 26' 51.041" N 163 74° 27' 59.397" E 31° 27' 41.257" N 67 74° 29' 0.428" E 31° 26' 50.748" N 164 74° 28' 1.199" E 31° 27' 40.939" N 68 74° 28' 59.788" E 31° 26' 43.638" N 165 74° 28' 3.266" E 31° 27' 40.620" N 69 74° 28' 59.191" E 31° 26' 42.201" N 166 74° 28' 5.810" E 31° 27' 40.143" N 70 74° 28' 58.845" E 31° 26' 39.972" N 167 74° 28' 7.745" E 31° 27' 39.779" N 71 74° 28' 58.639" E 31° 26' 38.496" N 168 74° 28' 9.831" E 31° 27' 39.363" N 72 74° 28' 58.296" E 31° 26' 37.988" N 169 74° 28' 10.619" E 31° 27' 39.157" N 73 74° 28' 57.314" E 31° 26' 34.624" N 170 74° 28' 11.293" E 31° 27' 38.942" N 74 74° 28' 56.318" E 31° 26' 32.856" N 171 74° 28' 11.991" E 31° 27' 38.736" N 75 74° 28' 55.620" E 31° 26' 31.483" N 172 74° 28' 12.756" E 31° 27' 38.609" N 76 74° 28' 54.689" E 31° 26' 29.653" N 173 74° 28' 13.431" E 31° 27' 38.462" N 77 74° 28' 53.932" E 31° 26' 27.506" N 174 74° 28' 14.174" E 31° 27' 38.325" N 78 74° 28' 53.509" E 31° 26' 26.368" N 175 74° 28' 14.848" E 31° 27' 38.256" N 79 74° 28' 52.942" E 31° 26' 25.181" N 176 74° 27' 45.272" E 31° 27' 24.226" N 80 74° 28' 52.608" E 31° 26' 25.243" N 177 74° 27' 45.245" E 31° 27' 24.235" N 81 74° 28' 51.408" E 31° 26' 27.299" N 178 74° 27' 45.247" E 31° 27' 24.221" N 82 74° 28' 49.783" E 31° 26' 27.115" N 179 74° 27' 45.439" E 31° 27' 22.054" N 83 74° 28' 48.305" E 31° 26' 29.107" N 180 74° 27' 45.134" E 31° 27' 21.163" N 84 74° 28' 45.486" E 31° 26' 32.490" N 181 74° 27' 43.221" E 31° 27' 21.797" N 85 74° 28' 44.950" E 31° 26' 33.146" N 182 74° 27' 42.979" E 31° 27' 18.738" N 86 74° 28' 42.729" E 31° 26' 34.147" N 183 74° 27' 43.213" E 31° 27' 15.693" N 87 74° 28' 41.729" E 31° 26' 34.556" N 184 74° 27' 43.750" E 31° 27' 14.042" N 88 74° 28' 40.794" E 31° 26' 34.991" N 185 74° 27' 45.523" E 31° 27' 11.565" N 89 74° 28' 40.033" E 31° 26' 35.202" N 186 74° 27' 47.993" E 31° 27' 8.167" N 90 74° 28' 39.062" E 31° 26' 35.525" N 187 74° 27' 52.743" E 31° 27' 2.019" N 91 74° 28' 36.694" E 31° 26' 36.267" N 188 74° 27' 53.938" E 31° 27' 0.371" N 92 74° 28' 35.445" E 31° 26' 36.654" N 189 74° 27' 57.840" E 31° 27' 0.899" N 93 74° 28' 34.604" E 31° 26' 36.903" N 190 74° 27' 57.780" E 31° 27' 10.330" N 94 74° 28' 33.647" E 31° 26' 37.188" N 191 74° 27' 58.199" E 31° 27' 19.613" N 95 74° 28' 32.314" E 31° 26' 37.796" N 192 74° 27' 57.140" E 31° 27' 20.259" N 96 74° 28' 31.535" E 31° 26' 38.611" N 193 74° 27' 52.981" E 31° 27' 21.731" N 97 74° 28' 30.521" E 31° 26' 39.788" N 194 74° 27' 45.272" E 31° 27' 24.226" N]

46[E. Sialkot on Wazirabad Road (5092.02 kanals approximately i.e. 636.27 acres) having the following details:

(i) Boundary References: Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Universal Transverse Mercator 43N

Boundary Reference Point ID Longitude Latitude NORTH N1/W4 74° 25' 14.440" E 32° 28' 39.169" N N2 74° 26' 2.420" E 32° 28' 39.607" N N3/E1 74° 26' 7.863" E 32° 28' 38.372" N EAST N3/E1 74° 26' 7.863" E 32° 28' 38.372" N E2 74° 26' 11.425" E 32° 28' 34.352" N E3 74° 26' 8.013" E 32° 28' 28.817" N E4 74° 26' 0.550" E 32° 28' 21.634" N E5 74° 26' 8.361" E 32° 28' 20.808" N E6 74° 26' 13.448" E 32° 28' 17.890" N E7 74° 26' 13.971" E 32° 28' 9.048" N E8 74° 26' 34.835" E 32° 28' 9.344" N S1/E9 74° 26' 34.983" E 32° 27' 44.525" N SOUTH S1/E9 74° 26' 34.983" E 32° 27' 44.525" N S2 74° 26' 20.446" E 32° 27' 43.377" N S3 74° 25' 51.214" E 32° 27' 37.228" N S4/W1 74° 25' 34.978" E 32° 27' 33.180" N WEST S4/W1 74° 25' 34.978" E 32° 27' 33.180" N W2 74° 25' 23.995" E 32° 27' 59.311" N W3 74° 25' 23.771" E 32° 28' 0.131" N N1/W4 74° 25' 14.440" E 32° 28' 39.169" N

(ii) Boundary Description: NORTH:

The northern boundary of jurisdiction start from the reference point N1/W4 (74° 25' 14.440" E, 32° 28' 39.169" N) near the railway line, Where it moves eastward, continuing along with the railway track and passes through the reference point N2 (74° 26' 2.420" E, 32° 28' 39.607" N) and extends further to the reference point N3/E1 (74° 26' 7.863" E, 32° 28' 38.372" N) situated close to Wazirabad Road. EAST:

46Inserted by the Notification No.SO(H-II)3-3/2021( (P-II) dated: 27-01-2026 vide Gazette notification no.07 of 2026, published in the Punjab Gazette (Extraordinary), dated: 27 January 2026, pp, 3993-4000.

The eastern boundary start from reference point N3/E1 (74° 26' 7.863" E, 32° 28' 38.372" N) and continues through several points in a generally southeast direction where it first reaches reference point E2 (74° 26' 11.425" E, 32° 28' 34.352" N), then proceeds to reference point E3 (74° 26' 8.013" E, 32° 28' 28.817" N), running alongside the rural settlement of Dulchike. The boundary line then moves through reference points E4 (74° 26' 0.550" E, 32° 28' 21.634" N), E5 (74° 26' 8.361" E, 32° 28' 20.808" N), E6 (74° 26' 13.448" E, 32° 28' 17.890"

N) and E7 (74° 26' 13.971" E, 32° 28' 9.048" N). It then reaches reference point E8 (74° 26' 34.835" E, 32° 28' 9.344" N) which lies adjacent to Ugoki Cantonment and finally continues to reference point S1/E9 (74° 26' 34.983" E, 32° 27' 44.525" N) situated near the rural settlement of Veerum. SOUTH:

The southern boundary start from reference point S1/E9 (74° 26' 34.983" E, 32° 27' 44.525" N) and stretches across various points towards the west. It passes through reference point S2 (74° 25' 51.214" E, 32° 27' 37.228" N), then to S3 (74° 26' 20.446" E, 31° 26' 52.104" N), following a tertiary road that connects to the Marala-Ravi link and continues to reference point S4/W1 (74° 25' 34.978" E, 32° 27' 33.180" N) located beside the Barala River link. WEST:

The western boundary start from reference point S4/W1 (74° 25' 34.978" E, 32° 27' 33.180" N) towards the north where it moves to reference point W2 (74° 25' 23.771" E, 32° 28' 0.131" N) which connects to Ganjianwala Road. From there, the boundary returns to the original reference point N1/W4 (74° 25' 14.440" E, 32° 28' 39.169" N) located near Wazirabad Road.

(iii) Boundary Map:

(iv) Boundary Coordinates: ID Longitude Latitude ID Longitude Latitude 1 74° 25' 38.869" E 32° 28' 37.420" N 154 74° 26' 28.050" E 32° 27' 43.968" N 2 74° 25' 40.328" E 32° 28' 37.547" N 155 74° 26' 31.401" E 32° 27' 44.266" N 3 74° 26' 13.659" E 32° 28' 8.941" N 156 74° 26' 34.964" E 32° 27' 47.271" N 4 74° 26' 13.980" E 32° 28' 3.761" N 157 74° 26' 34.945" E 32° 27' 49.378" N 5 74° 26' 34.902" E 32° 28' 3.846" N 158 74° 26' 34.954" E 32° 27' 52.515" N 6 74° 26' 24.133" E 32° 28' 3.790" N 159 74° 26' 34.899" E 32° 27' 56.062" N 7 74° 26' 24.178" E 32° 28' 3.551" N 160 74° 26' 34.871" E 32° 27' 59.197" N 8 74° 26' 34.823" E 32° 28' 3.563" N 161 74° 26' 34.869" E 32° 28' 5.293" N 9 74° 26' 34.842" E 32° 28' 2.132" N 162 74° 26' 34.853" E 32° 28' 6.751" N 10 74° 26' 33.948" E 32° 28' 2.125" N 163 74° 26' 34.843" E 32° 28' 8.143" N 11 74° 26' 33.948" E 32° 28' 1.583" N 164 74° 26' 32.478" E 32° 28' 9.338" N 12 74° 26' 34.850" E 32° 28' 1.596" N 165 74° 26' 29.785" E 32° 28' 9.292" N 13 74° 25' 33.076" E 32° 27' 59.957" N 166 74° 26' 26.615" E 32° 28' 9.238" N 14 74° 25' 33.146" E 32° 27' 59.295" N 167 74° 26' 23.527" E 32° 28' 9.186" N 15 74° 25' 32.889" E 32° 27' 59.218" N 168 74° 26' 20.400" E 32° 28' 9.135" N 16 74° 25' 32.954" E 32° 27' 58.493" N 169 74° 26' 17.018" E 32° 28' 9.089" N 17 74° 25' 32.563" E 32° 27' 58.387" N 170 74° 26' 13.574" E 32° 28' 12.536" N 18 74° 25' 32.607" E 32° 27' 57.887" N 171 74° 26' 13.505" E 32° 28' 15.463" N 19 74° 25' 30.682" E 32° 27' 57.829" N 172 74° 26' 10.929" E 32° 28' 17.826" N 20 74° 25' 30.682" E 32° 27' 57.161" N 173 74° 26' 8.489" E 32° 28' 17.764" N 21 74° 25' 31.863" E 32° 27' 57.248" N 174 74° 26' 4.196" E 32° 28' 20.731" N 22 74° 25' 31.914" E 32° 27' 56.360" N 175 74° 25' 59.575" E 32° 28' 20.591" N 23 74° 25' 31.403" E 32° 27' 56.337" N 176 74° 25' 55.528" E 32° 28' 20.453" N 24 74° 25' 31.429" E 32° 27' 55.693" N 177 74° 25' 55.508" E 32° 28' 16.602" N 25 74° 25' 32.571" E 32° 27' 55.568" N 178 74° 25' 53.388" E 32° 28' 20.222" N 26 74° 25' 32.454" E 32° 27' 57.110" N 179 74° 25' 53.748" E 32° 28' 24.914" N 27 74° 25' 33.223" E 32° 27' 57.248" N 180 74° 25' 52.755" E 32° 28' 24.409" N 28 74° 25' 33.170" E 32° 27' 57.823" N 181 74° 25' 54.005" E 32° 28' 20.670" N 29 74° 25' 34.622" E 32° 27' 57.919" N 182 74° 25' 57.102" E 32° 28' 21.305" N 30 74° 25' 34.879" E 32° 27' 57.129" N 183 74° 25' 53.831" E 32° 28' 17.973" N 31 74° 25' 34.045" E 32° 27' 57.003" N 184 74° 25' 58.693" E 32° 28' 22.114" N 32 74° 25' 34.143" E 32° 27' 55.880" N 185 74° 26' 0.416" E 32° 28' 29.299" N 33 74° 25' 35.040" E 32° 27' 55.918" N 186 74° 26' 3.797" E 32° 28' 28.694" N 34 74° 25' 35.233" E 32° 27' 54.419" N 187 74° 26' 8.018" E 32° 28' 34.304" N 35 74° 25' 37.480" E 32° 27' 54.492" N 188 74° 26' 10.354" E 32° 28' 36.426" N 36 74° 25' 37.427" E 32° 27' 55.245" N 189 74° 26' 2.726" E 32° 28' 36.338" N 37 74° 25' 38.198" E 32° 27' 55.297" N 190 74° 26' 2.771" E 32° 28' 32.368" N 38 74° 25' 38.249" E 32° 27' 55.708" N 191 74° 26' 5.508" E 32° 28' 32.441" N 39 74° 25' 39.174" E 32° 27' 55.262" N 192 74° 26' 5.505" E 32° 28' 31.272" N 40 74° 25' 39.705" E 32° 27' 55.297" N 193 74° 26' 0.285" E 32° 28' 31.120" N 41 74° 25' 39.945" E 32° 27' 55.999" N 194 74° 25' 57.657" E 32° 28' 34.309" N 42 74° 25' 40.922" E 32° 27' 55.965" N 195 74° 26' 0.267" E 32° 28' 34.385" N 43 74° 25' 40.922" E 32° 27' 55.382" N 196 74° 26' 0.210" E 32° 28' 35.351" N 44 74° 25' 41.727" E 32° 27' 55.365" N 197 74° 25' 57.625" E 32° 28' 35.329" N 45 74° 25' 41.727" E 32° 27' 55.691" N 198 74° 25' 57.594" E 32° 28' 36.242" N 46 74° 25' 44.827" E 32° 27' 55.897" N 299 74° 26' 1.648" E 32° 28' 36.335" N 47 74° 25' 44.805" E 32° 27' 56.732" N 200 74° 26' 1.509" E 32° 28' 38.279" N

48 74° 25' 44.099" E 32° 27' 56.860" N 201 74° 25' 57.810" E 32° 28' 29.874" N 49 74° 25' 44.141" E 32° 27' 57.674" N 202 74° 26' 5.704" E 32° 28' 38.328" N 50 74° 25' 42.482" E 32° 27' 57.775" N 203 74° 26' 7.966" E 32° 28' 36.422" N 51 74° 25' 42.465" E 32° 27' 58.632" N 204 74° 25' 17.875" E 32° 28' 39.269" N 52 74° 25' 43.752" E 32° 27' 58.804" N 205 74° 25' 21.525" E 32° 28' 39.261" N 53 74° 25' 43.670" E 32° 27' 59.893" N 206 74° 25' 24.865" E 32° 28' 39.253" N 54 74° 25' 44.298" E 32° 28' 0.251" N 207 74° 25' 28.725" E 32° 28' 39.244" N 55 74° 25' 45.154" E 32° 28' 0.352" N 208 74° 25' 32.422" E 32° 28' 39.290" N 56 74° 25' 47.421" E 32° 28' 0.078" N 209 74° 25' 36.273" E 32° 28' 39.337" N 57 74° 25' 47.438" E 32° 28' 0.922" N 210 74° 25' 38.609" E 32° 28' 39.366" N 58 74° 25' 48.508" E 32° 28' 0.915" N 211 74° 25' 40.317" E 32° 28' 39.382" N 59 74° 25' 48.525" E 32° 28' 0.237" N 212 74° 25' 43.419" E 32° 28' 39.390" N 60 74° 25' 50.279" E 32° 28' 0.164" N 213 74° 25' 46.504" E 32° 28' 39.398" N 61 74° 25' 50.339" E 32° 27' 59.183" N 214 74° 25' 50.100" E 32° 28' 39.407" N 62 74° 25' 51.203" E 32° 27' 59.139" N 215 74° 25' 53.492" E 32° 28' 39.415" N 63 74° 25' 51.143" E 32° 28' 0.951" N 216 74° 25' 57.085" E 32° 28' 39.470" N 64 74° 25' 51.964" E 32° 28' 0.973" N 217 74° 25' 59.814" E 32° 28' 39.558" N 65 74° 25' 51.973" E 32° 28' 0.000" N 218 74° 25' 35.613" E 32° 28' 4.061" N 66 74° 25' 52.444" E 32° 27' 59.970" N 219 74° 25' 36.694" E 32° 28' 4.200" N 67 74° 25' 52.889" E 32° 28' 0.179" N 220 74° 25' 40.313" E 32° 28' 6.202" N 68 74° 25' 53.128" E 32° 28' 0.511" N 221 74° 25' 40.110" E 32° 28' 6.973" N 69 74° 25' 53.693" E 32° 28' 0.800" N 222 74° 25' 35.281" E 32° 28' 6.371" N 70 74° 25' 53.111" E 32° 28' 0.821" N 223 74° 25' 40.714" E 32° 28' 10.443" N 71 74° 25' 53.753" E 32° 28' 0.107" N 224 74° 25' 42.591" E 32° 28' 5.582" N 72 74° 25' 54.831" E 32° 27' 59.977" N 225 74° 25' 43.184" E 32° 28' 5.579" N 73 74° 25' 55.199" E 32° 27' 59.782" N 226 74° 25' 43.226" E 32° 28' 6.391" N 74 74° 25' 55.712" E 32° 27' 59.782" N 227 74° 25' 44.210" E 32° 28' 6.500" N 75 74° 25' 55.695" E 32° 28' 0.345" N 228 74° 25' 44.125" E 32° 28' 7.600" N 76 74° 25' 56.499" E 32° 28' 0.403" N 229 74° 25' 45.644" E 32° 28' 7.637" N 77 74° 25' 56.474" E 32° 28' 1.081" N 230 74° 25' 45.472" E 32° 28' 9.911" N 78 74° 25' 55.147" E 32° 28' 1.096" N 231 74° 25' 44.660" E 32° 28' 9.911" N 79 74° 25' 53.796" E 32° 28' 1.190" N 232 74° 25' 44.595" E 32° 28' 10.560" N 80 74° 25' 53.744" E 32° 28' 1.767" N 233 74° 26' 28.999" E 32° 27' 55.069" N 81 74° 25' 54.300" E 32° 28' 1.803" N 234 74° 26' 28.603" E 32° 27' 53.845" N 82 74° 25' 54.309" E 32° 28' 2.128" N 235 74° 26' 24.464" E 32° 27' 53.854" N 83 74° 25' 53.650" E 32° 28' 2.128" N 236 74° 26' 24.635" E 32° 27' 54.942" N 84 74° 25' 53.633" E 32° 28' 2.944" N 237 74° 26' 23.341" E 32° 27' 55.187" N 85 74° 25' 52.298" E 32° 28' 3.045" N 238 74° 26' 23.084" E 32° 27' 56.384" N 86 74° 25' 52.281" E 32° 28' 2.633" N 239 74° 26' 21.533" E 32° 27' 57.409" N 87 74° 25' 52.247" E 32° 28' 2.323" N 240 74° 26' 19.619" E 32° 27' 56.865" N 88 74° 25' 52.349" E 32° 28' 1.218" N 241 74° 26' 19.822" E 32° 27' 57.336" N 89 74° 25' 51.913" E 32° 28' 1.211" N 242 74° 26' 22.421" E 32° 27' 58.025" N 90 74° 25' 51.887" E 32° 28' 2.114" N 243 74° 26' 21.672" E 32° 27' 57.726" N 91 74° 25' 51.451" E 32° 28' 2.099" N 244 74° 26' 23.223" E 32° 27' 57.001" N 92 74° 25' 51.417" E 32° 28' 2.424" N 245 74° 26' 26.935" E 32° 27' 55.468" N 93 74° 25' 51.032" E 32° 28' 2.424" N 246 74° 26' 27.225" E 32° 27' 53.399" N 94 74° 25' 50.980" E 32° 28' 1.717" N 247 74° 26' 25.204" E 32° 27' 52.527" N 95 74° 25' 48.508" E 32° 28' 1.594" N 248 74° 26' 25.150" E 32° 27' 51.170" N 96 74° 25' 48.516" E 32° 28' 1.955" N 249 74° 26' 24.797" E 32° 27' 50.655" N

97 74° 25' 46.223" E 32° 28' 1.919" N 250 74° 26' 23.411" E 32° 27' 50.710" N 98 74° 25' 46.240" E 32° 28' 1.449" N 251 74° 26' 22.422" E 32° 27' 50.691" N 99 74° 25' 44.632" E 32° 28' 1.399" N 252 74° 26' 22.188" E 32° 27' 48.800" N 100 74° 25' 44.512" E 32° 28' 2.272" N 253 74° 26' 20.423" E 32° 27' 48.612" N 101 74° 25' 43.613" E 32° 28' 2.280" N 254 74° 26' 19.674" E 32° 27' 48.127" N 102 74° 25' 43.588" E 32° 28' 1.738" N 255 74° 26' 19.727" E 32° 27' 49.645" N 103 74° 25' 42.609" E 32° 28' 1.723" N 256 74° 26' 18.890" E 32° 27' 49.612" N 104 74° 25' 42.187" E 32° 28' 0.550" N 257 74° 26' 18.914" E 32° 27' 50.502" N 105 74° 25' 41.044" E 32° 28' 0.250" N 258 74° 26' 18.444" E 32° 27' 50.503" N 106 74° 25' 40.715" E 32° 28' 0.377" N 259 74° 26' 18.454" E 32° 27' 50.069" N 107 74° 25' 39.504" E 32° 28' 0.943" N 260 74° 26' 18.005" E 32° 27' 50.060" N 108 74° 25' 38.335" E 32° 28' 1.562" N 261 74° 26' 18.005" E 32° 27' 49.627" N 109 74° 25' 40.195" E 32° 28' 1.183" N 262 74° 26' 17.492" E 32° 27' 49.681" N 110 74° 25' 40.445" E 32° 28' 1.693" N 263 74° 26' 17.492" E 32° 27' 50.503" N 111 74° 25' 39.907" E 32° 28' 1.978" N 264 74° 26' 16.882" E 32° 27' 50.503" N 112 74° 25' 39.181" E 32° 28' 2.113" N 265 74° 26' 16.309" E 32° 27' 51.126" N 113 74° 25' 38.150" E 32° 28' 2.636" N 266 74° 26' 15.655" E 32° 27' 51.535" N 114 74° 25' 36.562" E 32° 28' 3.302" N 267 74° 26' 14.389" E 32° 27' 52.043" N 115 74° 25' 34.714" E 32° 28' 3.094" N 268 74° 26' 14.384" E 32° 27' 52.993" N 116 74° 25' 33.939" E 32° 28' 2.263" N 269 74° 26' 15.556" E 32° 27' 53.317" N 117 74° 25' 33.237" E 32° 28' 1.735" N 270 74° 26' 16.765" E 32° 27' 53.742" N 118 74° 25' 31.978" E 32° 28' 0.792" N 271 74° 26' 16.283" E 32° 27' 53.534" N 119 74° 25' 23.486" E 32° 28' 1.169" N 272 74° 26' 16.465" E 32° 27' 54.951" N 120 74° 25' 22.646" E 32° 28' 4.236" N 273 74° 26' 15.638" E 32° 27' 54.816" N 121 74° 25' 21.831" E 32° 28' 8.364" N 274 74° 26' 15.716" E 32° 27' 54.229" N 122 74° 25' 21.080" E 32° 28' 12.685" N 275 74° 26' 14.946" E 32° 27' 54.148" N 123 74° 25' 20.363" E 32° 28' 16.852" N 276 74° 26' 14.069" E 32° 27' 56.160" N 124 74° 25' 19.550" E 32° 28' 21.157" N 277 74° 26' 14.807" E 32° 27' 55.519" N 125 74° 25' 18.761" E 32° 28' 24.946" N 278 74° 26' 15.545" E 32° 27' 55.610" N 126 74° 25' 17.665" E 32° 28' 29.730" N 279 74° 26' 15.545" E 32° 27' 56.169" N 127 74° 25' 16.461" E 32° 28' 34.495" N 280 74° 26' 16.112" E 32° 27' 56.169" N 128 74° 25' 34.119" E 32° 27' 35.344" N 281 74° 26' 16.133" E 32° 27' 55.592" N 129 74° 25' 33.246" E 32° 27' 37.544" N 282 74° 26' 18.166" E 32° 27' 55.781" N 130 74° 25' 32.246" E 32° 27' 39.919" N 283 74° 26' 18.099" E 32° 27' 56.157" N 131 74° 25' 31.222" E 32° 27' 42.299" N 284 74° 26' 18.790" E 32° 27' 56.323" N 132 74° 25' 30.274" E 32° 27' 44.499" N 285 74° 26' 18.658" E 32° 27' 57.360" N 133 74° 25' 29.312" E 32° 27' 46.669" N 286 74° 26' 19.203" E 32° 27' 57.351" N 134 74° 25' 28.303" E 32° 27' 48.906" N 287 74° 26' 19.107" E 32° 27' 59.345" N 135 74° 25' 27.151" E 32° 27' 51.461" N 288 74° 26' 19.834" E 32° 27' 59.373" N 136 74° 25' 26.153" E 32° 27' 53.733" N 289 74° 26' 19.877" E 32° 27' 58.596" N 137 74° 25' 25.226" E 32° 27' 55.951" N 290 74° 26' 20.209" E 32° 27' 58.651" N 138 74° 25' 24.533" E 32° 27' 57.611" N 291 74° 26' 20.241" E 32° 27' 58.028" N 139 74° 25' 37.962" E 32° 27' 33.558" N 292 74° 26' 20.069" E 32° 27' 57.432" N 140 74° 25' 40.907" E 32° 27' 34.258" N 293 74° 26' 19.481" E 32° 27' 56.846" N 141 74° 25' 43.930" E 32° 27' 34.976" N 294 74° 26' 21.631" E 32° 27' 57.117" N 142 74° 25' 47.015" E 32° 27' 35.883" N 295 74° 26' 21.689" E 32° 27' 56.573" N 143 74° 25' 49.109" E 32° 27' 36.554" N 296 74° 26' 22.294" E 32° 27' 56.629" N 144 74° 25' 54.510" E 32° 27' 38.604" N 297 74° 26' 22.455" E 32° 27' 55.537" N 145 74° 25' 57.260" E 32° 27' 39.652" N 298 74° 26' 23.197" E 32° 27' 55.040" N

146 74° 26' 0.095" E 32° 27' 40.729" N 399 74° 26' 24.407" E 32° 27' 54.985" N 147 74° 26' 3.593" E 32° 27' 41.982" N 300 74° 26' 24.380" E 32° 27' 53.534" N 148 74° 26' 6.340" E 32° 27' 42.884" N 301 74° 26' 26.508" E 32° 27' 52.253" N 149 74° 26' 9.905" E 32° 27' 43.492" N 302 74° 26' 26.786" E 32° 27' 52.993" N 150 74° 26' 13.176" E 32° 27' 43.782" N 303 74° 26' 21.225" E 32° 27' 48.814" N 151 74° 26' 16.599" E 32° 27' 44.012" N 304 74° 26' 24.080" E 32° 27' 50.294" N 152 74° 26' 22.992" E 32° 27' 43.335" N 305 74° 26' 25.727" E 32° 27' 51.179" N 153 74° 26' 25.316" E 32° 27' 43.638" N 306 74° 26' 25.717" E 32° 27' 50.664" N]

47[F. Potohar Site (both sides) adjacent to Islamabad International Airport along M-14 (99241.61 Kanals approximately i.e. 12405.20

acres)

(i) Boundary References:

Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Universal Transverse Mercator 43N

Boundary Reference Points ID Longitude Latitude North N1/W4 72° 43' 15.893" E 33° 34' 41.604" N N2 72° 44' 24.489" E 33° 35' 1.769" N N3 72° 46' 6.611" E 33° 35' 38.042" N N4 72° 47' 26.059" E 33° 35' 53.960" N N5/E1 72° 49' 20.742" E 33° 35' 43.511" N East

N5/E1 72° 49' 20.742" E 33° 35' 43.511" N E2 72° 49' 4.994" E 33° 35' 12.263" N E3 72° 48' 58.874" E 33° 34' 6.743" N E4 72° 47' 48.063" E 33° 33' 29.714" N E5 72° 47' 49.483" E 33° 32' 57.904" N E6/S1 72° 47' 47.871" E 33° 31' 51.798" N South

E6/S1 72° 47' 47.871" E 33° 31' 51.798" N S2 72° 46' 42.140" E 33° 31' 17.286" N S3 72° 45' 48.340" E 33° 31' 44.206" N S4 72° 45' 9.147" E 33° 32' 4.181" N S5/W1 72° 44' 11.409" E 33° 32' 11.193" N West

S5/W1 72° 44' 11.409" E 33° 32' 11.193" N W2 72° 43' 35.089" E 33° 33' 23.097" N W3 72° 43' 39.411" E 33° 33' 50.645" N N1/W4 72° 43' 15.893" E 33° 34' 41.604" N

47 Inserted by the Notification No.SO(H-II)3-3/2021( (P-III) dated: 08-01-2026 vide Gazette notification no.08 of 2026, published in the Punjab Gazette (Extraordinary), dated: 27 January 2026, pp, 4001-4012.

(ii) Boundary Description:

NORTH:

The northern boundary of jurisdiction start from the reference point N1/W4 (72° 43' 15.893"E, 33° 34' 41.604"N) near Madina Protein Farms, where it moves towards the eastern side which passes through the reference point N2 (72° 44' 24.489"E, 33° 35' 1.769"N) along Sukha Kas and to the reference point N3 (72° 46' 6.611"E, 33° 35' 38.042"N) crossing Fateh Jang-Girja Road towards east, where it passes alongside sector towards the reference point N4 (72° 47' 26.059"E, 33° 35' 53.960"N) on the Rawalpindi-Jand Kohat Road where it finally end at the reference point N5/E1 (72° 49' 20.742"E, 33° 35' 43.511"N) besides Mian Cattle Farms. EAST:

The eastern boundary start from the reference point N5/E1 (72° 49' 20.742"E, 33° 35' 43.511"N) near Mian Cattle farms, where it moves towards the southern side to the reference point E2 (72°49'4.994"E, 33°35'12.263"N) at Dr. Yasir’s Farms and then it moves towards the reference point E3 (72°48'58.874"E, 33°34'6.743"N) near Rama Dam and then moves along the boundary wall of Islamabad International Airport to the reference point E4 (72°47'48.063"E, 33°33'29.714"N) which further moves towards the reference point E5 (72°47'49.483"E, 33°32'57.904"N) at ASF Camp Mosque which ends at the reference point E6/S1 (72°47'47.871"E, 33°31'51.798"N) near Dhoke Manewali. SOUTH:

The southern boundary start from the reference point S1/E6 (72°47'47.871"E, 33°31'51.798"N) where it moves to west towards Dulatpur at

the reference point S2 (72°46'42.140"E, 33°31'17.286"N) which ends at the reference point S3 (72°45'48.340"E, 33°31'44.206"N) near Bonga which further extends to the reference point S4 (72° 45' 9.147" E, 33° 32' 4.181" N) by passing the settlement of Bonga and ends at the reference point S5/W1 (72° 44' 11.409"E, 33° 32' 11.193"N). WEST:

The western boundary start from the reference point S5/W1 (72° 44' 11.409"E, 33° 32' 11.193"N) where it passes through the reference point W2 (72° 43' 35.089"E, 33° 33' 23.097"N) at M14 further it moves in the northern direction along water stream to the reference point W3 (72° 43' 39.411"E, 33° 33' 50.645"N) and ends at the reference point N1/W4 (72° 43' 15.893"E, 33° 34' 41.604"N) near Madina Protein Farms.

(iii) Boundary Map:

(iv) Boundary Coordinates:

ID Longitude Latitude ID Longitude Latitude 1 72° 48' 38.374" E 33° 35' 52.963" N 60 72° 43' 20.004" E 33° 34' 40.634" N 2 72° 47' 57.979" E 33° 35' 53.987" N 61 72° 43' 13.285" E 33° 34' 39.358" N 3 72° 47' 51.769" E 33° 35' 53.267" N 62 72° 43' 3.554" E 33° 34' 29.044" N 4 72° 47' 38.613" E 33° 35' 56.126" N 63 72° 43' 2.637" E 33° 34' 12.493" N 5 72° 47' 28.344" E 33° 35' 17.303" N 64 72° 43' 5.161" E 33° 34' 7.060" N 6 72° 46' 44.194" E 33° 35' 11.644" N 65 72° 43' 11.667" E 33° 34' 7.021" N 7 72° 46' 27.695" E 33° 35' 13.233" N 66 72° 43' 12.688" E 33° 34' 0.161" N 8 72° 46' 14.161" E 33° 35' 21.659" N 67 72° 43' 7.437" E 33° 34' 1.538" N 9 72° 45' 52.631" E 33° 35' 40.203" N 68 72° 43' 6.157" E 33° 33' 57.278" N 10 72° 45' 48.132" E 33° 35' 36.660" N 69 72° 43' 10.659" E 33° 33' 53.384" N 11 72° 45' 43.242" E 33° 35' 35.298" N 70 72° 43' 14.932" E 33° 33' 55.392" N 12 72° 45' 40.893" E 33° 35' 30.130" N 71 72° 43' 25.652" E 33° 33' 49.842" N 13 72° 45' 36.208" E 33° 35' 30.036" N 72 72° 43' 27.354" E 33° 33' 48.505" N 14 72° 45' 35.590" E 33° 35' 27.045" N 73 72° 43' 29.187" E 33° 33' 46.241" N 15 72° 45' 31.213" E 33° 35' 25.221" N 74 72° 43' 33.934" E 33° 33' 50.442" N 16 72° 45' 35.332" E 33° 35' 22.349" N 75 72° 43' 43.165" E 33° 33' 45.831" N 17 72° 45' 32.100" E 33° 35' 18.862" N 76 72° 43' 39.725" E 33° 33' 42.734" N 18 72° 45' 26.949" E 33° 35' 15.858" N 77 72° 43' 45.872" E 33° 33' 39.970" N 19 72° 45' 13.637" E 33° 35' 17.527" N 78 72° 43' 46.451" E 33° 33' 35.268" N 20 72° 45' 8.579" E 33° 35' 16.301" N 79 72° 43' 53.189" E 33° 33' 34.706" N 21 72° 45' 4.714" E 33° 35' 17.433" N 80 72° 43' 49.125" E 33° 33' 29.388" N 22 72° 45' 4.407" E 33° 35' 12.987" N 81 72° 43' 42.928" E 33° 33' 8.748" N 23 72° 44' 59.394" E 33° 35' 5.640" N 82 72° 43' 55.011" E 33° 32' 58.954" N 24 72° 44' 58.671" E 33° 35' 8.957" N 83 72° 44' 0.380" E 33° 32' 56.844" N 25 72° 44' 51.933" E 33° 35' 7.884" N 84 72° 44' 15.769" E 33° 32' 42.621" N 26 72° 44' 50.051" E 33° 35' 10.238" N 85 72° 44' 20.025" E 33° 32' 38.709" N 27 72° 44' 47.223" E 33° 35' 10.368" N 86 72° 44' 26.258" E 33° 32' 30.332" N

28 72° 44' 43.613" E 33° 35' 10.516" N 87 72° 44' 30.989" E 33° 32' 28.640" N 29 72° 44' 43.096" E 33° 35' 6.214" N 88 72° 44' 30.478" E 33° 32' 26.039" N 30 72° 44' 40.707" E 33° 35' 3.836" N 89 72° 44' 25.986" E 33° 32' 23.088" N 31 72° 44' 34.511" E 33° 34' 58.234" N 90 72° 44' 55.253" E 33° 31' 59.951" N 32 72° 44' 30.504" E 33° 34' 58.842" N 91 72° 45' 19.695" E 33° 32' 8.297" N 33 72° 44' 24.741" E 33° 34' 56.928" N 92 72° 45' 24.577" E 33° 32' 3.599" N 34 72° 44' 20.341" E 33° 34' 59.015" N 93 72° 45' 35.656" E 33° 32' 4.515" N 35 72° 44' 13.245" E 33° 34' 58.155" N 94 72° 45' 44.413" E 33° 32' 3.092" N 36 72° 44' 9.275" E 33° 34' 55.862" N 95 72° 45' 48.834" E 33° 32' 4.106" N 37 72° 44' 3.641" E 33° 34' 55.042" N 96 72° 45' 54.646" E 33° 31' 54.197" N 38 72° 43' 59.953" E 33° 34' 56.204" N 97 72° 45' 54.750" E 33° 31' 39.705" N 39 72° 43' 58.567" E 33° 34' 53.265" N 98 72° 45' 58.467" E 33° 31' 36.989" N 40 72° 43' 49.502" E 33° 34' 52.864" N 99 72° 46' 9.621" E 33° 31' 31.861" N 41 72° 43' 49.775" E 33° 34' 50.443" N 100 72° 46' 24.557" E 33° 31' 21.965" N 42 72° 43' 45.891" E 33° 34' 49.754" N 101 72° 46' 54.119" E 33° 31' 22.479" N 43 72° 43' 43.962" E 33° 34' 47.586" N 102 72° 47' 4.501" E 33° 31' 28.298" N 44 72° 43' 40.161" E 33° 34' 47.462" N 103 72° 47' 11.249" E 33° 31' 30.234" N 45 72° 43' 38.201" E 33° 34' 49.743" N 104 72° 47' 46.349" E 33° 32' 44.867" N 46 72° 43' 37.554" E 33° 34' 46.689" N 105 72° 47' 27.863" E 33° 33' 2.209" N 47 72° 43' 35.541" E 33° 34' 44.857" N 106 72° 47' 31.001" E 33° 33' 23.985" N 48 72° 43' 31.124" E 33° 34' 43.064" N 107 72° 47' 46.412" E 33° 33' 21.603" N 49 72° 43' 31.745" E 33° 34' 45.052" N 108 72° 48' 59.500" E 33° 33' 19.178" N 50 72° 43' 32.668" E 33° 34' 46.621" N 109 72° 49' 19.109" E 33° 33' 27.641" N 51 72° 43' 33.187" E 33° 34' 52.059" N 110 72° 49' 22.412" E 33° 33' 41.065" N 52 72° 43' 31.518" E 33° 34' 50.406" N 111 72° 49' 22.620" E 33° 33' 53.797" N 53 72° 43' 27.082" E 33° 34' 49.688" N 112 72° 49' 17.234" E 33° 33' 59.183" N 54 72° 43' 24.830" E 33° 34' 48.957" N 113 72° 49' 6.434" E 33° 34' 0.983" N 55 72° 43' 22.107" E 33° 34' 47.656" N 114 72° 49' 15.434" E 33° 34' 39.143" N 56 72° 43' 23.300" E 33° 34' 43.942" N 115 72° 49' 16.154" E 33° 34' 51.023" N

57 72° 43' 23.011" E 33° 34' 41.083" N 116 72° 49' 12.914" E 33° 35' 23.783" N 58 72° 43' 24.020" E 33° 34' 37.230" N 117 72° 49' 18.674" E 33° 35' 34.943" N 59 72° 43' 16.772" E 33° 34' 35.285" N]

G. Potohar Site near Hassan Abdal situated at junction of M-1 (Islamabad- Peshawar Motorway) and M-15 corridor (2824.60 Kanals approximately i.e. 353.08 acres)

(i) Boundary References:

Datum and Spheroid World Geodetic System 1984 (WGS 84) Coordinate System Universal Transverse Mercator 43N

Boundary Reference Point Longitude Latitude North

N1/W7 72° 37' 7.949" E 33° 51' 36.321" N N2 72° 37' 22.497" E 33° 51' 50.048" N N3/E1 72° 37' 36.89" E 33° 51' 35.25" N East

N3/E1 72° 37' 36.89" E 33° 51' 35.25" N E2 72° 37' 51.286" E 33° 51' 20.452" N E3/S1 72° 37' 24.236" E 33° 51' 1.277" N South

E3/S1 72° 37' 24.236" E 33° 51' 1.277" N S2 72° 37' 11.650" E 33° 50' 58.321" N S3/W1 72° 36' 45.714" E 33° 51' 8.272" N West

S3/W1 72° 36' 45.714" E 33° 51' 8.272" N W2 72° 36' 45.883" E 33° 51' 11.648" N W3 72° 36' 42.694" E 33° 51' 15.806" N W4 72° 36' 47.726" E 33° 51' 16.483" N W5 72° 36' 52.323" E 33° 51' 21.105" N W6 72° 36' 52.425" E 33° 51' 27.386" N N1/W7 72° 37' 7.949" E 33° 51' 36.321" N

(ii) Boundary Description:

NORTH:

The northern boundary of jurisdiction start from the reference point N1/W7 (72° 37' 7.949"E, 33° 51' 36.321"N) near Aab-e-Sifa Road and moves to the north most to the reference point N2 (72° 37' 22.497"E, 33° 51' 50.048"N) near Aab-e-Shifa Chasma. It further moves in south-eastern direction upto the end to the reference point N3/E1(72° 37' 36.89"E, 33° 51' 35.25"N) near Allah Tawakal Book Depot. EAST:

The eastern boundary start from the reference point N3/E1 (72° 37' 36.89"E, 33° 51' 35.25"N) and moves further in south-eastern direction to the east most reference point E2 (72° 37' 51.286"E, 33° 51' 20.452"N) located near M-15 corridor and moves parallel to M-15 up to the end to the reference point E3/S1 (72° 37' 24.236"E, 33° 51' 1.277"N). SOUTH:

The southern boundary start from the reference point E3/S1 (72° 37' 24.236"E, 33° 51' 1.277"N) moving parallel to the exit road of M-1 (towards M-15) and reach to the reference point S2 (72° 37' 11.650"E, 33° 50' 58.321"N) and further extends to the end to the reference point S3/W1 (72° 36' 45.714"E, 33° 51' 8.272"N) moving parallel to M-1. WEST:

The western boundary start from the reference point S3/W1 (72° 36' 45.714"E, 33° 51' 8.272"N) outlining the western edge of the site and reflecting natural terrain and access routes, and passes through the reference points W2 (72° 36' 45.883"E, 33° 51' 11.648"N), W3 (72° 36' 42.694"E, 33° 51' 15.806"N), W4 (72° 36' 47.726"E, 33° 51' 16.483"N), W5 (72° 36' 52.323"E, 33° 51' 21.105"N), towards the reference point W6 (72° 36' 52.425"E, 33° 51' 27.386"N), from where the boundary closes the loop by heading northeast returning to the reference point N1/W7 (72° 37' 7.949"E, 33° 51' 36.321"N).

(iii) Boundary Map:

(iv) Boundary Coordinates:

ID Longitude Latitude ID Longitude Latitude 1 72° 37' 50.076" E 33° 51' 19.649" N 29 72° 36' 57.306" E 33° 51' 13.388" N 2 72° 37' 44.618" E 33° 51' 16.025" N 30 72° 36' 56.584" E 33° 51' 15.900" N 3 72° 37' 43.869" E 33° 51' 15.529" N 31 72° 36' 56.199" E 33° 51' 17.238" N 4 72° 37' 41.774" E 33° 51' 14.143" N 32 72° 36' 56.093" E 33° 51' 17.543" N 5 72° 37' 31.771" E 33° 51' 6.804" N 33 72° 36' 54.733" E 33° 51' 18.366" N 6 72° 37' 24.236" E 33° 51' 1.277" N 34 72° 36' 54.194" E 33° 51' 18.692" N 7 72° 37' 16.537" E 33° 50' 58.810" N 35 72° 36' 53.488" E 33° 51' 20.302" N 8 72° 37' 2.818" E 33° 51' 2.997" N 36 72° 36' 52.502" E 33° 51' 21.858" N 9 72° 37' 2.798" E 33° 51' 3.007" N 37 72° 36' 52.482" E 33° 51' 23.053" N 10 72° 37' 2.752" E 33° 51' 3.025" N 38 72° 36' 52.322" E 33° 51' 23.454" N 11 72° 36' 45.877" E 33° 51' 8.253" N 39 72° 36' 53.033" E 33° 51' 23.543" N 12 72° 36' 45.867" E 33° 51' 8.256" N 40 72° 36' 52.823" E 33° 51' 24.504" N 13 72° 36' 45.808" E 33° 51' 8.268" N 41 72° 36' 52.562" E 33° 51' 26.105" N 14 72° 36' 45.746" E 33° 51' 8.271" N 42 72° 36' 52.466" E 33° 51' 26.693" N 15 72° 36' 45.720" E 33° 51' 8.269" N 43 72° 36' 55.434" E 33° 51' 29.118" N 16 72° 36' 45.441" E 33° 51' 10.148" N 44 72° 37' 7.949" E 33° 51' 36.321" N 17 72° 36' 45.670" E 33° 51' 11.368"N 45 72° 37' 9.515" E 33° 51' 37.338" N 18 72° 36' 44.584" E 33° 51' 12.855" N 46 72° 37' 11.068" E 33° 51' 38.375" N 19 72° 36' 44.487" E 33° 51' 13.007" N 47 72° 37' 12.608" E 33° 51' 39.432" N 20 72° 36' 47.009" E 33° 51' 16.141" N 48 72° 37' 14.134" E 33° 51' 40.508" N 21 72° 36' 48.796" E 33° 51' 15.261" N 49 72° 37' 17.145" E 33° 51' 42.718" N 22 72° 36' 49.522" E 33° 51' 14.432" N 50 72° 37' 18.628" E 33° 51' 43.851" N 23 72° 36' 52.308" E 33° 51' 14.539" N 51 72° 37' 19.241" E 33° 51' 44.698" N

24 72° 36' 53.261" E 33° 51' 14.288" N 52 72° 37' 19.834" E 33° 51' 45.558" N 25 72° 36' 53.135" E 33° 51' 12.720" N 53 72° 37' 20.407" E 33° 51' 46.431" N 26 72° 36' 54.057" E 33° 51' 12.275" N 54 72° 37' 20.960" E 33° 51' 47.317" N 27 72° 36' 55.344" E 33° 51' 12.038" N 55 72° 37' 21.493" E 33° 51' 48.216" N 28 72° 36' 56.284" E 33° 51' 12.198" N 56 72° 37' 22.005" E 33° 51' 49.126" N]

48[SECOND SCHEDULE] (See section 56)

Part- A

1. Discharging any dangerous chemical, inflammable, hazardous or offensive article in any drain, or sewer, public water course or public land vested in, managed, or controlled by Authority or an Agency of the Authority in such manner as causes or is likely to cause danger to persons passing by or living or working in neighborhood, or risk or injury to property or causing harm to the environment.

2. Failure of commercial concern and occupier of a property to provide adequate and safe disposal of affluent or prevention of their mixing up with the water supply or sewerage system. Part-B

1. Willfully obstructing any officer or servant of Authority or any person authorized to exercise power conferred under this Act.

2. Failure to deliver back possession of property to the Authority on expiration and cancellation of lease or allotment or exemption of plot.

3. Doing an act without approval or permission when the doing of such act requires an approval or permission under any of the provisions of this Act, the rules or regulations.

4. Violation of the Master Plan, building plan or sanctioned site or development scheme as determined by the Authority or any officer authorized on its behalf.

5. Erection or re-erection of building over set back area or parking area or building line area required to be left open under the rules or bylaws for using such space for any purpose which is not approved.

6. Changing or converting into any other use any portion of a commercial or residential building or area specified or earmarked for public parking or amenities.

48Renamed by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.28.

7. Establishing any parking stand on any property or on any open space and public park or land vested in or managed, maintained or controlled by the Authority or an Agency.

8. Establishing temporary shops or running any restaurant or vending stalls for eatables, wooden Khokas or any sort of commercial activity on any road, street, footpath, public place, over a drain, or any other property vesting in the Authority.

9. Obstructing or tampering with any road, street, drain or sewer pine or pavement or tampering with any main pipe, meter or any apparatus or appliance for the supply of water or sewerage system or laying out a drain or altering any drain in a street or road.

10. Connecting any house drain with a drain in a public street without approval of the Authority.

11. Drawing off, diverting or taking any water except with the permission required under this Act, rules or regulations.

12. Willfully causing damage, or allowing damage to be caused to any property which vests in the Authority, or which is intended to be acquired by the Authority, or unlawfully converting it to his own or any other person's use.

13. Refusal or willfully neglecting to provide any officer or servant of the Authority with the means necessary for entering into any premises for the purpose of collecting any information or making an examination or enquiry in relation to any water works.

14. Failure or neglect of the sponsor to abide by or fulfill the commitment made to a person regarding allotment of a plot, housing unit or price of the same in any scheme.

Print contents from the source
CONTENTS 
 
1. Short title, extent and commencement 
2. Definitions 
3. [Omitted] 
4. Establishment of the Authority 
5. The Board 
6. Disqualifications of members 
7. Powers and Functions of the Authority 
8. Meetings 
9. Chairman of the Board 
10. Chief Executive Officer 
11. Delegation 
12. Appointment of employees 
13. Termination from service 
14. Liability for loss 
15. Committees 
16. Preparation of schemes and projects etc 
17. Establishment of housing schemes, projects etc 
18. Land use 
19.  Control of Master Plan  
20. Power to give directions 
21. Power to execute schemes 
22. [Omitted] 
23. Transfer of functions 
24. Controlled area 
25. Powers to remove sources of pollution 
26.  Beautification and horticulture 
27. Borrowing money 
28. Power to levy betterment fee  
29. Assessment of betterment fee 
30. Liability to acquisition 
31. Acquisition of land 
32.   Use of public and private land 
33. Purchase, lease or exchange of property 
34.  Joint Ventures and outsourcing  
35. Fund 
36. Rates and fees 
37. Fees on tube-wells 
38. Recovery of dues 
39. Conversion of property to a different use 
40. Ejectment of unauthorized occupants 
41. Removal of buildings 
42. Accounts 
43. Budget 
44.  Audit 
45.  Annual report 
46. Members, officers and employees to be public servants 
47. Immunity 
48. Jurisdiction of courts barred 
49. Overriding effect 
50. Amendment of Schedule 
51. Removal of difficulties  
52. Power to make rules 
53. Power to frame regulations 
54. Municipal and local government functions 
55. Penalty 
56. Offences and cognizance 
57. Repeal
Compare the original stored transcription

Exact source transcription retained, including print layout and extraction artifacts. Text SHA-256: 25c5c044a43bdc8500a94427b81f2476d3acc64cb7798cfc3d540c029dd005a1.

THE PUNJAB CENTRAL BUSINESS DISTRICT 
DEVELOPMENT AUTHORITY ACT 2021  
(VI of 2021) 
CONTENTS 
 
1. Short title, extent and commencement 
2. Definitions 
3. [Omitted] 
4. Establishment of the Authority 
5. The Board 
6. Disqualifications of members 
7. Powers and Functions of the Authority 
8. Meetings 
9. Chairman of the Board 
10. Chief Executive Officer 
11. Delegation 
12. Appointment of employees 
13. Termination from service 
14. Liability for loss 
15. Committees 
16. Preparation of schemes and projects etc 
17. Establishment of housing schemes, projects etc 
18. Land use 
19.  Control of Master Plan  
20. Power to give directions 
21. Power to execute schemes 
22. [Omitted] 
23. Transfer of functions 
24. Controlled area 
25. Powers to remove sources of pollution 
26.  Beautification and horticulture 
27. Borrowing money 
28. Power to levy betterment fee  
29. Assessment of betterment fee 
30. Liability to acquisition 
31. Acquisition of land 
32.   Use of public and private land 
33. Purchase, lease or exchange of property 
34.  Joint Ventures and outsourcing  
35. Fund 
36. Rates and fees 
37. Fees on tube-wells 
38. Recovery of dues 
39. Conversion of property to a different use 
40. Ejectment of unauthorized occupants 
41. Removal of buildings 
42. Accounts 
43. Budget 
44.  Audit 
45.  Annual report 
46. Members, officers and employees to be public servants 
47. Immunity 
48. Jurisdiction of courts barred 
49. Overriding effect 
50. Amendment of Schedule 
51. Removal of difficulties  
52. Power to make rules 
53. Power to frame regulations 
54. Municipal and local government functions 
55. Penalty 
56. Offences and cognizance 
57. Repeal 
 
FIRST SCHEDULE 
[See section 2(b)] 
 
SECOND SCHEDULE 
(See section 56) 
 
  
TEXT 
1
THE PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT 
AUTHORITY ACT 2021 
(VI of 2021) 
    [17 May 2021] 
 
An 
Act 
to establish 2[Punjab] Central Business District Development Authority. 
It is necessary to make provisions for establishment of 3[Punjab] Central 
Business District Development Authority for development, promotion and 
regulation of the state -of-the-art vertical construction in the area both for 
residential and commercial purpos es while maintaining highest environmental 
standards, quality of life and modern facilities so as to develop a healthy and 
prosperous business community in the Area 4[of the Authority]. 
Be it enacted by Provincial Assembly of the Punjab as follows:  
1. Short title, extent and commencement .– (1) This Act may be cited as 
the 5[Punjab] Central Business District Development Authority Act 2021. 
6[(2) This Act extends to Walton Airport Area Lahore including its 
surrounding areas and such other areas , cities, urban centres and towns as the 
Government may, by notification in the official Gazette, specify.] 
(3) It shall come into force at once. 
2. Definitions.– In this Act: 
(a) “Agency” means an Agency established by the Authority to perform 
one or more of its functions under this Act; 
7[(b) “Area” means the area of the Authority as specified in the FIRST 
SCHEDULE]; 
(c) “Authority” means 8[Punjab] Central Business District Development 
Authority constituted under section 4 of this Act; 
                                                      
1This Act was passed by Provincial Assembly of the Punjab on 17 May 2021; assented to by the Governor of the Punjab 
on 17 May 2021; and, was published in the Punjab Gazette (Extraordinary), dated: 17 May 2021, pp.9163-9176. 
2Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
3Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
4Inserted by the Lahore Central Business District D evelopment Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.2. 
5Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
6Substituted by the Lahore Central Business Distric t Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.4. 
7Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVII I of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5. 
8Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
(d) “Board” means th e Board of the Authority established under 
section 5 of this Act;  
(e) “CEO” means Chief Executive Officer of the Authority appointed 
under section 10 of this Act; 
(f) “Chairman” means the Chairman of the Board; 
(g) “Collector” means Land Acquisition Collector under the Land 
Acquisition Act, 1894 (I of 1894); 
(h) “compensation” means the compensation given under this Act; 
(i) “concession” means the grant by the Authority of any of its rights, 
privileges or functions to a person in consideration of the 
investment made or arranged by such person at the instance of the 
Authority on any development project; 
(j) “conversion” means any change in use of land or property from the 
one originally provided in an approved scheme or the Master Plan; 
(k) “Director General” means the principal executive of an Agency; 
(l) “District Collector” means Collector of the District under the Punjab 
Land Revenue Act, 1967 (XVII of 1967); 
(m) “fee” means an amount levied by the Authority on the land, area, 
scheme or property on a ccount of any privilege, benefit, services, 
transfer of rights and interests, issuance of a license or permission 
or any cost and includes charges for provision of water supply, 
construction, maintenance and network of roads, drainage, 
sewerage and other services; 
(n) “finance” shall have the same meanings as assigned thereto in the 
Financial Institution (Recovery of Finances) Ordinance 2001; 
(o) “financial institutions” shall have the same meanings as assigned 
thereto in the Financial (Recovery of Finances) Ordinance 2001; 
(p) “Fund” means the 9[Punjab] Central Business District Development 
Authority Fund created under this Act; 
(q) “Government” means Government of the Punjab; 
(r) “Government agency” includes– 
(i) a Department, Bureau, section, commission, board, office, 
or unit of the Government; 
(ii) a local government; and 
(iii) a developmental or any other public authority, company or 
corporation owned or controlled by the Government or a 
local government;  
(s) “housing scheme” means a scheme which provi des for multi -story 
residential sites, houses or apartments including ancillary land in 
the Area such as: 
(i) high rise building and other facilities for health, education, 
commercial, recreation, sports, culture, transportation, 
communication and shopping; 
                                                      
9Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
(ii) environmental improvement; and 
(iii) utility services such as water supply, drainage, sewerage, 
sanitation, electricity, fuel and other related services; 
(t) “joint venture” means entering into an agreement as partner; 
(u) “land” includes earth, water and air, above, below or on the surface 
and any improvements in the structure customarily regarded as 
land and benefits arising out of land and things attached to earth or 
permanently fastened to earth; 
10[(v) “local government” means a local government as defined in the 
relevant law on local governments for the time being in force;] 
(w) “Master Plan” means the independent master plan of the Area 
notified and prepared in the traditional method for presenting a set 
of land usage, allocation and control measures in the form of a 
map or in graphical form and is supported by written statement of 
goals and objectives, strategy, financial implications and policies 
for planning and development for an area and includes a structure 
plan, an outline development plan, a spatial plan, peri -urban 
structure plan; 
11[(x) “member” means a member of the Board and includes an ex officio 
member or his nominee;] 
(y) “person” includes an individual, company, firm, institution, 
Government agency, co -operative society or association of 
individuals whether incorporated or not; 
(z) “person interested” includes a pers on claiming an interest in the 
compensation to be made on account of the acquisition of land 
under the Act; 
(aa) “prescribed” means prescribed by the rules or the regulations made 
or framed under this Act; 
(bb) “regulations” means the regulations framed under this Act; 
(cc) “rules” means the rules made under this Act; 
(dd) “Schedule” means 12[a] schedule appended to this Act; 
(ee) “scheme” means a project approved for urban development, 
redevelopment or renewal and includes larger area plan, areas 
specified and notified for specific use, traffic control plans, 
classification and reclassification plans, housing scheme or zoning 
scheme in the Area; or infrastructure and services including 
transportation systems and road networks, healthcare facilities, 
recreational facilities, parks and theme parks, educational facilities, 
cultural facilities, communication and civic facilities, water supply 
and drainage systems, sewerage and sanitation, energy 
generation, procurement, transmissions and distribution systems 
                                                      
10Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5. 
11Substituted by the Lahore Central Business D istrict Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5. 
12Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022  (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.5. 
including for electric powers, through any energy source, and gas 
(LNG, LPG, etc) or industrial estates and all systems and facilit ies 
or works ancillary thereto, planned, made, undertaken and or 
supervised and or approved by the Authority under this Act; 
(ff) “service area” means an area to be notified as such by the 
Authority and in which an Agency provides services; 
(gg) “sponsor” means the sponsor or developer of a commercial or 
housing scheme and, in case of any liability or offence includes the 
chief executive, director or any other individual in charge of the 
scheme on behalf of sponsor entity; and 
(hh) “toll” means a charge lev ied and collected for the use of a road, 
bridge, flyover, underpass or similar other facility. 
3. 13[*****] 
4. Establishment of the Authority .– (1) As soon as, after promulgation of 
the Lahore Central Business District Development Authority  Ordinance 2021 (IV 
of 2021), the Government shall, by notification in the official Gazette, establish 
an Authority to be called as the 14[Punjab] Central Business District Development 
Authority for carrying out the purposes of this Act. 
(2)  The Authority shall be a body corporate, with perpetual succession 
and a common seal, with powers, subject to the provisions of this Act, to acquire 
and hold property, both movable and immovable, carry on development in the 
Area, and may, by the said name, sue and be sued. 
(3)  The Government shall review the performance of the Authority and 
may, from time to time, give general policy directions to implement such 
directions. 
15[5. The Board.– (1) There shall be a Board of the Authority consisting of the 
following: 
(a) Chairman; 
(b) three ex officio members not below the rank of Secretaries 
to the Government to be nominated by the Government; 
(c) two non -official members to be nominated by the 
Government for a period of three years; 
(d) two technical expert members to be appointed by the 
Government for a period of three years with following 
criteria: 
(i) one expert in fields of engineering or business with at 
least fifteen years post-qualification experience in the 
relevant field; and 
                                                      
13Omitted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.6. 
14Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
15Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.7. 
(ii) one expert in the fields of Urban Planning, 
Architecture or smart cities with minimum of fifteen 
years post qualification experience in the relevant 
field; and 
 (e) the CEO as member/secretary. 
(2) The Board shall exercise all powers, perform all functions  and do 
all acts which may be exercised, performed or done by the Authority. 
(3) In case of a casual vacancy, a member other than the Chairman 
shall be nominated by the Government for the remaining term of the outgoing 
member. 
(4) Subject to subsection (4)  of section 8, no act or proceeding of the 
Board shall be invalid merely by reason of any vacancy or defect in the 
constitution of the Board.] 
6. Disqualifications of members.– (1) No person shall be, or shall continue 
to be a member who: 
(a) is or, at any time, has been convicted of an offence involving moral 
turpitude; or 
(b) is or, at any time, has been adjudicated insolvent; or 
(c)  is found to be a lunatic or of unsound mind; or 
(d) is a minor; or 
(e) has a financial interest in any scheme or a conflic ting interest, 
directly or indirectly, between his interests as a member and his 
private interests, and has failed to disclose such interest in writing 
to the Authority. 
(2) A member, other than an ex -officio member, may resign from his 
office at any time under his hand addressed to the Government and such 
resignation shall be effective from the date of acceptance by the Government. 
(3)  The Government may remove the Chairman or a member, other 
than an ex -officio member, subject to notice and opportunity of  hearing, during 
the term of office if such member is: 
(a) disqualified to be a member; or 
(b)  absent from three consecutive meetings of the Board without prior 
permission of the Chairman; or 
(c)   found guilty of misconduct. 
7. Powers and Functions of th e Authority.– (1) The Authority, may in the 
Area: 
(a) initiate and maintain a continuous process of master planning, 
urban planning, spatial planning; 
(b) update and amend the Master Plan and take all steps and 
measures necessary for the implementation and enforcement of 
the Master Plan; 
(c) prepare and periodically revise land use and building regulations to 
implement the Master Plan; 
(d) plan, amend or change the land use as it deems necessary; 
(e) outsource one or more of its functions for smooth functioning and 
implementation of Master Plan, building control and infrastructure 
development; 
(f) plan, promote, organize and implement programmes for vertical 
construction, high rise buildings, development, operations, repairs, 
rehabilitation, security and maintenance of all infrastructure; 
(g) develop, operate, maintain and manage water supply, sewerage, 
drainage, wastewater treatment, improvement of groundwater level 
and fix any tariff as it may deem necessary and enter into any 
agreement with any other agency for such purposes; 
(h) prepare, plan, design and implement comprehensive transportation 
plan; 
(i) plan, design and implement traffic engineering and traffic 
management programs;  
(j) prepare, plan and implement solid waste management plan; 
(k) maintain green areas and aquaculture; 
(l) prepare asset management schemes regarding the properties; 
(m) prepare, implement and enforce schemes for environmental 
improvements, housing, urban renewal including slum 
improvement and redevelopment, health and educational facilities 
and preservation of objects or p laces of historical, archaeological, 
scientific, cultural and recreational importance; 
(n) prepare annual development programmes and ensure compliance 
of such programmes; 
(o) prepare the annual budget of the Authority; 
(p) take any steps or adopt any measures for the face lifting, 
beautification, greenery and horticulture; 
(q) acquire, dispose of property both movable and immovable or any 
interest in the property; 
(r) sell, lease, exchange 16[, auction] or otherwise dispose of or grant 
license or concessions in respect of any property vested in it; 
(s) raise funds through borrowing, investments, leasing of assets or 
any other means with the approval of the Government; 
(t) enter into and perform such contracts with local and international 
organizations including but not limited to join v enture agreements, 
as may be necessary for carrying out the purposes of the Act; 
(u) award contracts for projects or schemes to be undertaken through 
public financing or through public private partnership; 
(v) enter into partnership with national and international  development 
agencies, organizations or companies or through joint ventures; 
(w) undertake any works and incur any expenditure within service 
area; 
(x) procure machinery, instruments or any other material; 
                                                      
16Inserted by the Lahore Central Business Di strict Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.8. 
(y) levy, collect or cause to be collected tolls on the use of  the roads, 
bridges, flyovers, underpasses, any infrastructure or such other 
facilities and grant concession in respect thereof;  
(z) establish different directorates, sectors and wings, and delegate 
such powers to the directorates, sectors and wings as are 
necessary for the efficient and effective performance of its 
functions under the Act; 
(aa) disseminate and create awareness about the Authority; 
(bb) collaborate with the Government, the local government or any 
other public or private sector agency for improvement of services 
and environment; 
(cc) organize road shows or seminars to attract national and 
international investors, consultants and contractors for 
infrastructure, road development works and master planning; 
(dd) ensure enforcement of this Act in collaboration with the 
Government and the local governments; 
(ee) seek advice and assistance for the preparation of any scheme, or 
for the execution of any scheme from the Government or any 
person or agency; 
(ff) support training and workshops of its human resource at  local and 
international level for capacity building;  and 
(gg) perform such other functions as the Government may assign to the 
Authority to achieve the objectives of this Act; 
17[(hh) prepare, launch and execute real estate investment trusts; 
(ii) determine the terms and conditions of the Chairman; 
(jj) develop models and mode of compensation for acquisition or 
purchase of land including through bonds, debentures, annuities, 
alternate land, developed sites or a combination of two or more of 
such forms; and 
(kk) issue guarantees and indemnities for the purposes of this Act.] 
(2) The Authority shall have all the powers of a local government as 
defined in Punjab Local Government Act 2019 (XIII of 2019), and the municipal 
authority independently for the purpose o f carrying out any function under this 
Act in the Area. 
8. Meetings.– 18[(1) Subject to the regulations, the Board shall meet at such 
place and at such time as it may determine from time to time.] 
  (2) The meetings of the Board shall be presided over by the Chairman. 
19[(3) In the absence of the Chairman, members present at a meeting 
shall elect a member from amongst them to preside over a meeting.] 
                                                      
17Added by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published 
in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.8. 
18Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9. 
19Substituted by the Lahore Central Business Distric t Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9. 
20[(4)  Five members of the total members of the Board, including the 
Chairman, present in person or through video conference or tele -conference 
shall constitute the quorum for a meeting of the Board.] 
(5)   Subject to the quorum, the decisions of the Board shall be taken by 
majority of the members present and voting and in the event of equality of votes 
the Chairman or his nominee shall have casting vote: 
provided that a coopted member shall not have any right to vote. 
(6)  The Board shall meet at least once in every calendar quarter and a 
meeting of the Board shall be held on such date and at such time and place  as 
the Chairman may determine. 
21[(7) The CEO shall act as Secretary of the Board. 
(8)  The Secretary of the Board shall maintain or cause to be 
maintained the record of each meeting of the Board including the minutes of the 
meetings. 
(9) The Chairman may co-opt any person other than a member to 
attend a meeting of the Board for the purpose of advising or assisting the Board 
on any agenda item taken up for consideration at such meeting but a co -opted 
member shall not have right to vote.] 
9. Chairman of the Board.–  The Chairman of the Board shall be appointed 
by the Government on such terms and conditions as may be determined by the 
22[Board]. 
10. Chief Executive Officer.– (1) The Government shall appoint the CEO to 
serve as a member of the Board, who shall, subject to the provisions of this Act, 
be responsible for the management, administration and operations of the 
Authority.  
(2) The CEO shall be a person of sound integrity and competence with 
at least 15 years of relevant experience. 
(3) The CEO shall be answerable to the Board for all administrative, 
financial and technical matters of the Authority.  
23[(4) The CEO shall be appointed for an extendable term of three years  
on such terms and conditions as may be determined by the Board: 
provided that the Board shall review the performance of the CEO every 
year, and grant him such increments and bonuses as may be approved in the 
annual budget of the Authority.   
provided furt her that the CEO shall only be removed from service after 
giving him a notice and right of hearing before the Government.  
(5) The CEO may, at any time before the expiry of his term and upon 
three months ’notice, resign his office. 
                                                      
20Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVII I of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9. 
21Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.9. 
22Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.10. 
23Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.11. 
(6) Subject to this Act and general supervision and control of the 
Board, the CEO may exercise all powers and perform all functions of the 
Authority and the Board.] 
11. Delegation.– (1) The Board may delegate its powers under this Act 
subject to such conditions as it may deem fit. 
24[(2) The Board or the CEO may establish, by special order, one or 
more Agencies.] 
(3) The Director Generals of Agencies shall: 
(a) be appointed by the CEO in consultation with the Chairman on 
such terms and conditions as may be determined by the CEO; 
(b)  hold office for a period of three years and shall be responsible for 
its administration and having such powers as may be prescribed; 
and 
(c)  remain in office for three months expiry of his term under clause (b) 
or until a successor in that office is appointed, whichever is earlier. 
(4)  Nothing in this section shall preclude the CEO from extending the 
term of office of the Director General of an Agency for such period as he may 
determine. 
(5)  Notwithstanding anything contained in this Act, the Direct or 
General of an Agency may, at any time before the expiry of his term and upon 
three months‟ notice, resign this office or, upon similar notice, be removed by the 
Government without assigning any reason. 
25[12. Appointment of employees .– (1) The Authority may appoint such 
employees including advisors, experts and consultants as it considers necessary 
for the efficient performance of its functions on such terms and conditions as 
may be prescribed by the regulations:  
provided that the Au thority shall review the performance of its employees 
every year, and may grant such increments and bonuses to them as may be 
approved in the annual budget of the Authority.]  
13. Termination from service .– Notwithstanding anything contained in the 
terms and conditions of service, the Authority may, at any time, remove any 
employee from service of the Authority or an Agency after giving him one month 
notice and affording him an opportunity of being heard. 
14. Liability for loss .– Any person employed by or serv ing under the 
Authority or an Agency or an agency acting on behalf of the Authority or an 
agency or acting under a contract with the Authority or an agency which is 
responsible for the loss, waste, misappropriation or misapplication of any money 
or propert y belonging to the Authority or an Agency, which is a direct 
consequence of his negligence or misconduct in the discharge of his duties, shall 
be liable to pay the loss suffered by the Authority or Agency as may be 
                                                      
24Substituted by the Lahore Central Business  District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.12. 
25Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2 022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.13. 
determined by the Authority after giving such person a reasonable opportunity of 
being heard. 
15. Committees.– The Board may constitute such number of financial, 
technical and advisory committees or other Committees as it may deem 
necessary for carrying out the purposes of this Act, and such comm ittees shall 
exercise such powers and perform such functions as may be delegated or 
assigned to them by the Board. 
26[16. Preparation of schemes and projects etc.– (1) subject to the provisions 
of this Act, the Authority shall prepare projects for the area or any part thereof. 
(2) Any planning or development scheme in the area of the Authority 
may be carried out only with the concurrence of the Authority.] 
17. Establishment of housing schemes, projects etc. – (1) The Authority 
may prepare, establish and develop housing and any other schemes, buildings, 
infrastructure, services, commercial, semi -commercial projects or sites in the 
Area and for the purpose it may enter into an agreement including Joint Venture 
Agreement with any 27[private person, government, governmental agency, entity 
or corporation on revenue sharing basis]. 
(2)  A scheme under subsection (1) shall be approved in the manner 
prescribed for the preparation of a scheme under this Act. 
18. Land use .– (1) The Authority may, at any time, modify a scheme 
prepared under this Act by way of change of land use through classification, 
reclassification, settlements or resettlements or redevelopment in the Area in 
such manner as may be prescribed by the regulations. 
(2)  The Authority shall, in such manner as may be prescribed by the 
regulation, exercise land use control and perform multi -storied commercial and 
housing functions. 
(3)  In case any person contravenes any of the provisions of this 
section, he shall be punished with imprisonment for a term which may extend to 
three years or with fine which may extend to five hundred thousand rupees or 
with both. 
19.  Control of Master Plan. – 28[(1) The Authority may make, maintain, 
amend, manage, enforce and keep in its custody a Master Plan or Master Plans 
if devised for the Area in different cities, towns and urban centres.] 
(2)  The Authority shall, in the prescribed manner, exercise land use 
control and perform housing functions in the Area without having any 
interference from any other authority or local government or Government 
Agency. 
(3)  Notwithstanding anything contained in any other law, a person 
shall be bound to adhere to the Master P lan, rules and regulations for land use 
control and housing functions as given under subsections (1) and (2). 
                                                      
26Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.14. 
27Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.15. 
28Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.16. 
(4)    If any person contravenes any of the provisions of this section, the 
Authority may direct that till the time the contravention continues– 
(a)  transfer of any immovable property of such person shall be 
prohibited; 
(b)  the District Collector shall impose a ban on the issuance of Fard 
Malkiat, registration of any document or attestation of mutation in 
favour of the said person; and 
(c) a local government, an Agency or  a Government agency shall stop 
or discontinue the provision of municipal services to such person. 
(5) Notwithstanding, anything contained in any other law for the time 
being in force, the Master Plan shall be considered as an ind ependent Master 
Plan and shall have no nexus whatsoever with the integrated master plans of 
any other Authority, agency or local government. 
20. Power to give directions .– (1) The Authority may require a Government 
agency, within whose jurisdiction any particular locality or aspect of development 
covered by a scheme lies– 
(a) to execute a scheme in consultation with the Authority; 
(b) to take over and maintain any of the works and services in that 
area; 
(c) to provide any amenity in relation to the land which in the opinion of 
the Authority ought to be provided; and 
(d) to enforce regulations on behalf of the Authority. 
(2)  The expenditure incurred on the execution of any scheme or on the 
taking over or maintenance of any work, or the enforcement of regulat ion, under 
this section, shall be borne as may be agreed to between the Authority and the 
Government agency and in the event of any disagreement, as may be 
determined by the Government. 
21. Power to execute schemes. – (1) Where the Authority is satisfied th at 
any direction given by it under section 20 with regard to any scheme, has not 
been carried out by the Government agency, the Authority may, itself, undertake 
any work for the execution of that scheme and the cost thereof shall be borne as 
may be agreed between the Authority and the Government agency, and, in the 
event of disagreement, as may be determined by the CEO. 
(2) Where any work is undertaken by the Authority under subsection 
(1), it shall be deemed to have, for the purposes of execution of such w ork, all 
the powers which may be exercised under any law for the time being in force, by 
the Government agency concerned. 
22. 29[*****] 
23. Transfer of functions .– Where the Authority ceases to perform a 
function and another Government agency or organizatio n assumes that function, 
the Government by notification in the official Gazette may direct: 
                                                      
29Omitted by the Lahore Central B usiness District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.17. 
(a) that the employees of the Authority connected with that function 
shall become servants of the Government agency or organization 
on such terms and conditions as the Government agency or 
organization may determine, subject to the condition that such 
terms and conditions are not less favorable than those admissible 
to such employees as employees of the Authority; and 
(b) that such part of the Fund of the Authority a s the Government may 
determine, shall stand transferred to such Government agency or 
organization. 
24. Controlled area .– (1) The Authority may, by notification in the official 
Gazette, declare any locality within the Area to be a controlled area for purpos es 
of this Act and may issue in respect of such controlled area such directions as it 
considers fit and appropriate and do all such things as may be necessary for the 
prevention of haphazard growth, encroachments and unauthorized constructions 
in such area. 
(2) The Authority may, by notification in the official Gazette, notify any 
controlled area to be no longer such area. 
(3)  The Authority may, by notification in the official Gazette, entrust 
any of its functions in any locality within the Area, to any du ly appointed agent or 
any Government agency. 
(4) For purposes of subsection (3), the Authority may enter into an 
agreement with a person or any entity on such terms and conditions as may be 
mutually agreed including joint venture agreement 30[*****]. 
25. Powers to remove sources of pollution .– (1) The Authority shall have 
powers to take steps for improvement of the environment of the Area, and to 
check, replace, eliminate, remove, demolish, conserve, resettle or relocate the 
sources of environmental pollution such as milch cattle, horses or other animals, 
tongas, vehicular exhaust, industrial waste, solid waste, congestion, blight and 
slums and other such pollutants. 
(2)  The person affected by any action of the Authority under 
subsection (1) shall be paid su ch compensation as may be determined under 
this Act. 
26.  Beautification and horticulture. – (1) The Authority shall also undertake 
beautification including but not limited to greenery, tree plantation, horticulture 
services, green belts, parks of the area or part thereof, in any manner as it 
deems fit. 
(2) Notwithstanding anything contained in the Parks and Horticulture 
Authority Act 2012 (XLVII of 2012) or rules made thereunder, this Act shall 
govern the matters of any undertaking, work or scheme relating to the 
beautification or horticulture in the Area. 
27. Borrowing money .– (1) The Authority shall be deemed to be a „Local 
Authority‟ for the purpose of borrowing money and any scheme or project 
prepared or undertaken by the Authority shall be deemed to be “work” as defined 
in section 2 of the Local Authorities Loans Ordinance, 1914 (IX of 1914). 
                                                      
30Omitted by the Lahore Central Business District Development Authority (Amendment) Ac t 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.18. 
(2) The Authority may, in consultation with its financial advisors, 
borrow money from the financial institutions or raise funds or finances by issuing 
bonds or debe ntures for carrying out the purposes of this Act, at such rate of 
interest as may be approved by the Authority. 
(3) The Authority shall have powers to arrange foreign direct 
investments on any of its schemes, projects or undertakings. 
28. Power to levy bet terment fee .– Where, as a consequence of any 
scheme having been executed by the Authority, the value of any property in that 
locality, in the opinion of the Authority, has increased or is likely to be increased, 
the Authority may levy fee upon the owner of  the property or any person having 
an interest therein such betterment fee in respect of the increase in value of the 
property resulting from the execution of the scheme as may be assessed by the 
Authority in such manner as may be prescribed by the regulations.  
29. Assessment of betterment fee .– (1) When it appears to the Authority 
that any particular development scheme is sufficiently advanced to enable the 
amount of the betterment fee to be determined, the Authority may, by an order 
made in this behalf, declare that for the purpose of determining the betterment 
fee, the execution of the scheme shall be deemed to have been completed and 
shall thereupon give notice in writing to the owner of the property, or any person 
having an interest therein that the Au thority proposes to assess the amount of 
the betterment fee in respect of the property. 
(2)  The betterment fee under subsection (1) shall be assessed and be 
payable, in such manner as may be prescribed. 
30. Liability to acquisition .– (1) Notwithstanding a nything contained in the 
Land Acquisition Act, 1894 (I of 1894), or in any other law for the time being in 
force, any land within the Area shall be liable to acquisition at any time in 
accordance with the provisions of this Act. 
(2)  The Authority may acqu ire or purchase in a transparent manner any 
immovable property or land for any public purpose including development of 
housing, commercial purposes or any other scheme, urban renewal, 
redevelopment, environmental improvement or removal of source of polluti on or 
traffic congestion. 
31[31. Acquisition of land .– Subject to the provisions of this Act and the 
regulations, the Authority may acquire an immovable property in the following 
modes: 
(a) under the Land Acquisition Act, 1894 (I of 1894) and such 
acquisitions shall be deemed to be for public purpose;  
(b) through a contract of purchase, lease, exchange and through the 
Authority land procurement models as may be approved by the 
Board; and 
(c) by w ay of transfer, lease or grant from the Government or the 
Federal Government.] 
32[32. Use of public and private land .– Notwithstanding the provisions of any 
other law and subject to this Act, the Authority may, with consent of respective 
                                                      
31Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.19. 
Government or any person and on such mutually agreed terms and conditions, 
use any state or private land belonging to the Federal, Provincial Government or 
any private person for the purpose of any scheme, project or phase of master 
plan on profit or revenue sharing basis within the Area.] 
33. Purchase, lease or exchange of property .– The Authority may, by 
negotiations 33[*****], purchase, lease or exchange any land or building or any 
other property by entering into any agreement with the owner of the property or a 
person competent to sell, lease out or exchange such property or enter into joint 
venture for the development of any site, project, building and scheme. 
34[34. Joint ventures and outsourcing .– (1) Notwithstanding the provisions 
contained in the Punjab Public Private Partnership Act 2019 (XXX of 2019) and 
the Punjab Procurement Regulatory Authority Act, 2009 (VIII of 2009), and 
subject to such terms and conditions as may be prescribed by the regulations 
and until so prescribed as may be approved by the Board, for perfo rmance of its 
functions under this Act, the Authority may: 
(a) enter into any joint venture agreement with any Government agency or 
organization, any local or foreign company to manage, sale, develop, 
maintain, build and transfer any land, plot, estate or property in the area 
including that vested in or owned by the Authority; and 
(b) outsource any of its activities including development works through any 
mode including public private partnership.  
 (2) The Joint Venture Agreements or public private partner ship 
Agreements under subsection (1) may be executed by the CEO or any other 
employee of the Authority as may be authorized by the Board. 
(3) Notwithstanding anything contained in the Punjab Procurement 
Regulatory Authority Act, 2009 (VIII of 2009), any ru les and regulations made 
thereunder, the Authority may, by the regulations, prescribe methods and 
procedures for undertaking public procurements under this Act and such 
prescribed methods shall exclusively govern procurements by the Authority.]  
35. Fund.– (1) There shall be created a fund to be known as „the 35[Punjab] 
Central Business District Development Authority Fund‟ which shall vest in the 
Authority and shall be utilized by the Authority in connection with its functions 
under this Act including the pa yment of salaries, pensions and other 
remunerations to the members, officers, servants, experts and consultants of the 
Authority. 
 (2)  The Fund shall consist of: 
(a) grants and loans made by the Government; 
                                                                                                                                                             
32Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.20. 
33Omitted by the Lahore Central Business District D evelopment Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.21. 
34Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.22. 
35Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
(b) all moneys received from Federal Government or the Government 
in a form of loans or any inter -national agency by way of grants, 
donations loans, advances or revenues from joint venture, 
outsourcing agreements or otherwise; 
(c) all fees, rates and charges received by the Authority under this Act; 
(d) all moneys rec eived by the Authority from the disposal of lands, 
buildings and other properties, movable and immovable; 
(e) proceeds from the self -financing schemes of urban development 
and environmental sanitation; and 
(f) all other sums receivable by the Authority. 
     (3) The sums under subsection (2) in respect of services related to 
water supply, sewerage and drainage shall be credited separately to the head 
„water supply and sanitation‟ and all other sums to the head 36[Punjab] Central 
Business District Development”; and the sums credited to the head „water supply 
and sanitation‟ shall be exclusively utilized for the purposes of water supply, 
sewerage and drainage. 
      (4) In case of deficit revenue of the Authority, the Government may 
provide loans, repayable in a prescr ibed manner, from its own revenues or from 
any other source, such sum as may be necessary for the efficient performance 
of the functions of the Authority under this Act. 
      (5) The Authority may keep in current account of any scheduled bank 
or banks suc h sum as may be 37[determined by it]  by the regulation and any 
amount in excess of the said amount may be invested in investments schemes 
of nation or international institutions or may also be invested into Government 
securities, Government sponsored saving schemes or in such manner as may 
be determined by the Authority. 
36. Rates and fees.– (1) The Authority may raise adequate funds to meet the 
cost of planning, expansion, execution, development, redevelopment, 
maintenance, zoning, classification, reclassification, augmentation, supervision,  
regulation and conversion of any property or any present and future scheme or 
any part of the scheme, by imposing rates, fees, surcharge, other charges and 
fines in the prescribed manner within the Area. 
 (2) The Authority may, in the prescribed manner, i mpose fee on 
change of land use owing to classification and reclassification. 
(3) The rates, fees and other charges for water supply, sewerage and 
drainage schemes shall be such as to provide sufficient revenues: 
(a) to cover the operating expenses including taxes, if any, and interest 
to provide adequate maintenance and depreciation; 
(b) to meet repayments on long term indebtedness to the extent that 
such repayments exceed the provision of depreciation; and 
(c) to finance the normal year to year extension of any of such 
schemes and to provide a reasonable portion of the cost of future 
major expansion of such schemes. 
                                                      
36Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. 
37Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.23. 
37. Fees on tube -wells.– (1) The Authority shall have the exclusive right to 
use ground water resources within the Area. 
  (2) No person shall install a tube -well in the Area without the 
permission of the Authority. 
(3)  The Authority may, in the prescribed manner, levy rate on any 
person who has installed or intends to install tube-well within the Area. 
(4)  Any person violating the provisions of subsection (2) shall be liable 
to punishment under this Act along with closure or sealing of the tube -well by the 
Authority. 
38. Recovery of dues .– Any sum due to the Authority from, or any sum 
wrongly paid by the Authority to, any person under this Act, shall be recoverable 
as arrears of land revenue. 
39. Conversion of property to a different use .– If a person converts a 
property to a different use or purpose than the one provided under a scheme, 
Master Plan or  classification map without the previous approval in writing of the 
Authority, he shall be liable to punishment of fine which may extend to ten 
thousand rupees per day from the date of its conversion till the default continues 
or with imprisonment for a term which may extend to one year or with both. 
40. Ejectment of unauthorized occupants.– (1) Subject to an opportunity of 
hearing, the CEO or any person authorized by the CEO may  summarily eject 
any person in unauthorized occupation of any land or property  vested in the 
Authority and may for such ejectment use such force as may be necessary. 
      (2)  Subject to an opportunity of hearing, the CEO or any person 
authorized by him may, on his own motion or on the application of the owner, 
summarily eject any person in unauthorized occupation of any land or plot in a 
housing scheme developed and controlled by the Authority and may, for such 
ejectment, use such force as may be necessary. 
       (3)  Nothing contained in subsections (1) and (2) shall prohibit the  CEO 
or any person authorized by him to proceed against such person on commission 
of an offence as provided in this Act. 
41. Removal of buildings .– (1) If any building, structure, work or land is 
erected, constructed or used in contravention of the provisi ons of this Act or of 
any rule, regulation or order made thereunder, the CEO or any person 
authorized by him or the Authority in this behalf, may, by an order in writing, 
require the owner, occupier, user or person in control of such building, structure, 
work or land to remove, demolish or alter the building, structure or work or to use 
it in such manner so as to bring such erection, construction or use in accordance 
with the provisions of this Act. 
     (2) If an order under subsection (1) in respect of an y building, 
structure, work or land is not complied with within such time as may be specified 
therein, the CEO or any person authorized by him, may, after giving the person 
affected by the order an opportunity of being heard, remove, demolish or alter 
the building, structure or work, or stop the use of the land by sealing the 
premises or land and, in so doing, may use such force as may be necessary and 
may also recover the cost therefor, from the person responsible for the erection, 
construction or use of the building, structure, work or land in contravention of the 
provisions as aforesaid. 
42. Accounts.– The Authority shall maintain proper accounts and other 
relevant records and prepare annual statement of accounts in such form as may 
be 38[determined]. 
39[43. Budget.– The CEO shall prepare a budget in respect of the financial year 
next ensuing showing the estimated receipts and expenditure of the Authority 
and each of its Agencies and shall submit the same to the Board for approval: 
provided that the Authority shall maintain its own schedule of rates and 
costs for its projects and schemes to be approved by the Board, and until such 
schedule is approved, the rates determined through engineering estimates by 
approved engineering consultants shall be used by the Authority.] 
44.  Audit.– The accounts of the Authority shall be maintained and audited in 
such manner as may be prescribed. 
45.  Annual report.– (1) The Authority shall prepare for every year a report of 
its activities during that year an d submit the report to the Government in such 
form and on or before such date, as may be prescribed. 
 (2) The Government shall lay the annual report of the Authority in the 
Provincial Assembly of the Punjab. 
46. Members, officers and employees to be public  servants.– The 
members,  CEO, officers, servants, experts and consultants of the Authority or 
the Director General shall, when acting or purporting to act under this Act in 
pursuance of any of the provisions of this Act, be deemed to be public servants 
within the meaning of section 21 of the Pakistan Penal Code, 1860 (XLV of 
1860). 
47. Immunity.– No suit, prosecution or any other legal proceedings shall lie 
against the Authority, CEO, any member, officer, servant, expert or consultant of 
the Authority or the  Director General, in respect of anything done or intended to 
be done in good faith under this Act. 
48. Jurisdiction of courts barred .– Save as otherwise provided by this Act, 
no court or authority shall have jurisdiction to question the legality of any thing 
done or any action taken under this Act, by or at the instance of the Authority. 
49. Overriding effect.– In the event of any conflict or inconsistency between 
the provisions of this Act and the provisions of any other law, the provisions of 
this Act shall prevail to the extent of such inconsistency or conflict. 
50. Amendment of Schedule .– The Government may, by notification in the 
official Gazette, amend the 40[Schedules]. 
51. Removal of difficulties .–If any difficulty arises in giving effect to any 
provision of this Act, the Government, at any time, may make such orders or give 
such directions as are necessary to remove such difficulty.  
                                                      
38Substituted by the Lahore Central Business D istrict Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.24. 
39Substituted by the Lahore Central Business District Development Authority (Amendment) Act 202 2 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.25. 
40Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.26. 
52. Power to make rules.–The Government may by notification in the official 
Gazette, make rules for carrying out the purpose of this Act. 
53. Power to frame regulations .–Subject to the provisions of this Act, the 
Board may make regulations as may be necessary, to carry out the purposes of 
this Act. 
54. Municipal and local government functions .– (1) Notwithstanding 
anything contained in any other law for the time being in force , the Government 
may, by notification in the official Gazette, specify that the Authority may 
exercise and perform such powers and functions for the Area as municipal 
administration or local govern ment may exercise and perform in relation to 
municipal function under the law for time being in force. 
(2) Notwithstanding anything contained in the Punjab Local 
Government Act, 2019 (XIII of 2019), any rules and regulations made thereunder 
or any other la w for time being in force, the Authority may by regulations, 
prescribe methods and procedures for undertaking municipal and local 
government functions under this Act, and such regulations shall exclusively 
govern the local government function by the Authority. 
55. Penalty.– (1) If a person contravenes any provision of this Act, or any 
rules or regulations made under this Act, he shall, if no other penalty is provided 
for such contravention, be punishable with imprisonment for a term which may 
extend to one year or with fine which may extend to two hundred thousand 
rupees or with both. 
 (2) The Magistrate competent to try an offence under subsection (1) 
may try the offence in a summary manner in accordance with the provisions of 
sections 260 to 265 of the Code of Criminal Procedure, 1898 (V of 1898). 
56. Offences and cognizance.– (1) If a person commits an offence specified 
in: 
(a)   Part-A of the 41[SECOND SCHEDULE], such person shall be liable 
to imprisonment for a term which may extend to seven years or fine 
which may extend to seven hundred thousand rupees or with both 
and where an accused was directed by the Authority for immediate 
discontinuance of the offence, the Court may impose a further fine 
which may extend to fifty thousand rupees for every day for the 
period the accused has persisted in the offence from the date of its 
commission; and 
(b) Part-B of the 42[SECOND SCHEDULE] , he shall be liable to 
imprisonment for a term which may extend to three years or fine 
which may extend to five hundred thousand r upees or with both 
and where an accused was directed by the Authority for immediate 
discontinuance of the offence, the Court may impose a further fine 
which may extend to ten thousand rupees per day for the period 
the offence continues. 
                                                      
41Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.27. 
42Substituted by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), 
published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.27. 
 (2) An offence punishable under subsection (1) shall be cognizable on 
a complaint in writing of an officer authorized by the Authority. 
57. Repeal.– The Lahore Central Business District Development Authority  
Ordinance 2021 (IV of 2021) is hereby repealed. 
  
43FIRST SCHEDULE 
[See section 2(b)] 
Area of the Authority 
1. Lahore: 
 
A. Walton Airport and Bab-e-Pakistan (3128 kanals approximately) 
having the following details: 
 
(i) Boundary references: 
 
Datum and 
Spheroid World Geodetic System 1984 (WGS 84) 
Coordinate 
System 
Geographic Coordinate System/ Latitude and Longitude (GCS 
Lat Long WGS84) 
 
Boundary Reference Point 
ID Longitude Latitude 
East 
E1/N10 74° 21' 18.540” E 31° 29' 21.175” N 
E2 74° 21' 9.227” E 31° 29' 4.064” N 
E2/S1 74° 21' 40.095” E 31° 28' 53.763” N 
North 
N1/W12 74° 19' 55.720” E 31° 30' 23.665” N 
N2 74° 20' 8.509” E 31° 30' 25.507” N 
N3 74° 20' 9.325” E 31° 30' 24.095” N 
N4 74° 20' 21.776” E 31° 30' 32.365” N 
N5 74° 20' 23.261” E 31° 30' 31.476” N 
N6 74° 20' 11.824” E 31° 30' 21.564” N 
N7 74° 20' 35.843” E 31° 29' 58.208” N 
N8 74° 20' 34.110” E 31° 29' 56.822” N 
N9 74° 21' 11.941” E 31° 29' 22.683” N 
West 
W1/S3 74° 21' 0.422” E 31° 28' 51.433” N 
W2 74° 21' 10.057” E 31° 29' 9.837” N 
W3 74° 21' 3.170” E 31° 29' 21.601” N 
W4 74° 20' 55.843” E 31° 29' 16.368” N 
W5 74° 20' 49.028” E 31° 29' 30.205” N 
W6 74° 20' 52.268” E 31° 29' 31.439” N 
W7 74° 20' 10.430” E 31° 30' 13.288” N 
W8 74° 20' 4.309” E 31° 30' 8.270” N 
W9 74° 20' 2.651” E 31° 30' 11.543” N 
W10 74° 19' 56.738” E 31° 30' 9.908” N 
                                                      
43Added by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published 
in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.28. 
Boundary Reference Point 
ID Longitude Latitude 
W11 74° 19' 53.694” E 31° 30' 17.049” N 
South S2 74° 21' 27.605” E 31° 28' 40.524” N 
 
(ii) Boundary description: 
 
NORTH: 
The Northern Boundary of jurisdiction starts from the reference point 
N1/W12 moving along the northern boundary of Saint Mary Park (National 
Bank Park) (Including side road) towards East, up to reference point N2 
falling exactly on Hali Road till N3 and it  moves towards northeast up to the 
reference point N4 exactly on Main Boulevard Road towards Liberty 
Square and then up to the reference point N4 it moves towards N5 near 
United Christian Hospital. From reference point, N5 moves towards the 
southwest on Ma in Boulevard Road towards Kalma Square up to the 
reference point N6 and move towards the south along Falcon Complex 
Road till N7, excluding the boundary of Falcon Complex, move up to 
reference point N8. From N8 it moves towards southeast along the Falcon 
Complex Boundary excluding model Colony Up to the reference point N9 
and towards the reference point E1/N10 on Railway Line. 
EAST: 
From the reference point E1/N10 moving towards west south along the 
railway line excluding Railway Officers Colony Boundary, to the reference 
point E2. From the reference Point E2, it moves towards the southeast 
direction along Bab e Pakistan boundary till Walton Road at reference point 
E3/S1 excluding the Civil Service Academy Area and including Bab -e-
Pakistan area. 
SOUTH: 
From the reference point E3/S1 moving along Walton Road till the 
reference point S2 and then move towards the northwest along the Bab -e-
Pakistan Road up to the reference point W1/S3 crossing Hall Road and 
Railway Track. 
WEST: 
From the reference point W1/S3 in the North-East direction including areas 
of the WCB, move towards the reference point W2. From the reference 
point W2, it moves towards Northwest direction up to the reference Point 
W3 excluding the Walton Airport Military Area. From W3 move towards so 
southwest direction up to the reference point W4 connecting to Yasir 
Shaheed Road. From W4 it moves towards the northwest along Yasir 
Shaheed Road excluding the Pakistan Navy College and then moves 
towards North East along Walton Boundary till reference Point  W5. From 
W5 it moves towards W6 in the northeast  direction along the Naval 
Complex boundary. From W6 in the northwest direction along the boundary 
of Askari-V Flats, From reference point W6 it continues moving along the 
Walton boundary till W7, and then it moves towards west till reference point 
W8 (SW corner of the park), W9 North corner of the park on Aqa Khail 
road. Along the nursery road, it moves towards the west up to reference 
point W10 on Ferozepur Road. From reference point W10, it moves towards 
North till Kalma Square including the Kalma Chowk Garden and Main 
Boulevard G ulberg Road to W11 and then connects with the Saint 
Mary‟s Park Road till the reference point N1W12. 
 
 
 
  
(iii) Boundary Map: 
 
 
(iv) Boundary Coordinates: 
 
ID Longitude Latitude ID Longitude Latitude 
1 31° 28' 40.524" N 74° 21' 27.605" E 39 31° 30' 25.269" N 74° 20' 6.362" E 
2 31° 28' 47.233" N 74° 21' 9.691" E 40 31° 30' 24.684" N 74° 20' 6.759" E 
3 31° 28' 51.325" N 74° 21' 0.308" E 41 31° 30' 25.507" N 74° 20' 8.509" E 
4 31° 29' 9.837" N 74° 21' 10.057" E 42 31° 30' 24.095" N 74° 20' 9.325" E 
 
B. Wahdat Colony (1,771 kanals approximately) having the following 
details: 
 
(i) Boundary references: 
 
Datum and 
Spheroid World Geodetic System 1984 (WGS 84) 
Coordinate 
System 
Geographic Coordinate System/ Latitude and Longitude 
(GCS Lat Long WGS84) 
 
 
5 31° 29' 9.745" N 74° 21' 7.783" E 43 31° 30' 32.365" N 74° 20' 21.776" E 
6 31° 29' 13.900" N 74° 21' 7.097" E 44 31° 30' 31.476" N 74° 20' 23.261" E 
7 31° 29' 14.454" N 74° 21' 7.386" E 45 31° 30' 23.462" N 74° 20' 11.651" E 
8 31° 29' 17.317" N 74° 21' 6.375" E 46 31° 30' 21.564" N 74° 20' 11.824" E 
9 31° 29' 21.601" N 74° 21' 3.170" E 47 31° 30' 12.089" N 74° 20' 20.953" E 
10 31° 29' 19.908" N 74° 20' 59.849" E 48 31° 29' 58.208" N 74° 20' 35.843" E 
11 31° 29' 19.046" N 74° 21' 0.246" E 49 31° 29' 56.822" N 74° 20' 34.110" E 
12 31° 29' 16.368" N 74° 20' 55.843" E 50 31° 29' 42.086" N 74° 20' 50.440" E 
13 31° 29' 16.799" N 74° 20' 55.266" E 51 31° 29' 22.683" N 74° 21' 11.941" E 
14 31° 29' 17.538" N 74° 20' 55.266" E 52 31° 29' 23.145" N 74° 21' 13.530" E 
15 31° 29' 29.161" N 74° 20' 49.417" E 53 31° 29' 21.175" N 74° 21' 18.540" E 
16 31° 29' 30.238" N 74° 20' 49.092" E 54 31° 29' 16.665" N 74° 21' 16.229" E 
17 31° 29' 31.439" N 74° 20' 52.268" E 55 31° 29' 14.815" N 74° 21' 15.877" E 
18 31° 29' 36.863" N 74° 20' 47.703" E 56 31° 29' 13.623" N 74° 21' 15.548" E 
19 31° 29' 37.232" N 74° 20' 47.956" E 57 31° 29' 12.232" N 74° 21' 15.038" E 
20 31° 29' 47.133" N 74° 20' 36.618" E 58 31° 29' 10.334" N 74° 21' 13.937" E 
21 31° 29' 45.871" N 74° 20' 34.632" E 59 31° 29' 9.233" N 74° 21' 13.299" E 
22 31° 29' 52.701" N 74° 20' 27.256" E 60 31° 29' 8.435" N 74° 21' 12.836" E 
23 31° 29' 53.501" N 74° 20' 28.302" E 61 31° 29' 7.732" N 74° 21' 11.987" E 
24 31° 29' 56.948" N 74° 20' 24.728" E 62 31° 29' 6.728" N 74° 21' 10.774" E 
25 31° 29' 57.841" N 74° 20' 25.811" E 63 31° 29' 6.403" N 74° 21' 10.382" E 
26 31° 29' 59.719" N 74° 20' 23.753" E 64 31° 29' 5.764" N 74° 21' 10.066" E 
27 31° 30' 0.242" N 74° 20' 24.078" E 65 31° 29' 4.064" N 74° 21' 9.227" E 
28 31° 30' 2.386" N 74° 20' 22.325" E 66 31° 29' 3.818" N 74° 21' 9.840" E 
29 31° 30' 4.871" N 74° 20' 19.294" E 67 31° 29' 4.095" N 74° 21' 10.057" E 
30 31° 30' 5.566" N 74° 20' 18.316" E 68 31° 29' 3.137" N 74° 21' 12.551" E 
31 31° 30' 13.288" N 74° 20' 10.430" E 69 31° 29' 1.571" N 74° 21' 16.626" E 
32 31° 30' 9.908" N 74° 19' 56.738" E 70 31° 29' 1.940" N 74° 21' 17.492" E 
33 31° 30' 16.980" N 74° 19' 53.712" E 71 31° 29' 2.710" N 74° 21' 17.998" E 
34 31° 30' 17.910" N 74° 19' 56.909" E 72 31° 28' 58.735" N 74° 21' 27.814" E 
35 31° 30' 23.665" N 74° 19' 55.720" E 73 31° 28' 53.763" N 74° 21' 40.095" E 
36 31° 30' 23.840" N 74° 19' 57.348" E 74 31° 28' 47.143" N 74° 21' 33.850" E 
37 31° 30' 24.282" N 74° 19' 57.264" E 75 31° 28' 40.591" N 74° 21' 5.183" E 
38 31° 30' 24.930" N 74° 20' 4.196" E 76 31° 28' 44.203" N 74° 20' 56.349" E 
Boundary Reference Point ID Longitude Latitude 
NORTH 
N1 31°31'14.10"N 74°18'49.49"E 
N2 31°31'6.11"N 74°18'14.50"E 
N3 31°31'4.14"N 74°18'14.38"E 
N4 31°31'2.53"N 74°18'11.05"E 
N5 31°31'5.33"N 74°18'9.92"E 
EAST E1 31°31'1.41"N 74°18'57.47"E 
SOUTH S1 31°30'41.61"N 74°18'15.50"E 
WEST W1 31°31'4.51"N 74°17'59.84"E 
 
(ii) Boundary description: 
EAST:  
The Eastern boundary starts from Naqsha Stop along Wahdat Road at 
reference point E1.   
NORTH: 
From reference point E1 it moves in north direction adjacent to Wahdat 
link road till T Junction at reference point N1 meeting at Shuja Road. From 
reference point N1 the boundary moves west along Shuja road through 
the points N2, N3, N4 and N5 respectively.  
WEST: 
From reference point N5, it moves to west connecting at reference point 
W1 at Link Wahdat road opposite to Pak Block, Allama Iqbal Town. 
SOUTH: 
From reference point W1, it moves along Link Wahdat Road to connect at 
point S1 at Wahdat Road.  
(iii) Boundary Map: 
 
 
 
(iv) Boundary Coordinates: 

 
ID Longitude Latitude 
N1 31°31'14.10"N 74°18'49.49"E 
N2 31°31'6.11"N 74°18'14.50"E 
N3 31°31'4.14"N 74°18'14.38"E 
N4 31°31'2.53"N 74°18'11.05"E 
N5 31°31'5.33"N 74°18'9.92"E 
E1 31°31'1.41"N 74°18'57.47"E 
S1 31°30'41.61"N 74°18'15.50"E 
W1 31°31'4.51"N 74°17'59.84"E 
 
44[C. RESCUE 1122 Site LOS, Ferozepur Road  (68 kanals 
approximately) having the following details: 
(i)      Boundary references: 
Datum and 
Spheroid 
World Geodetic System 1984 (WGS 84) 
Coordinate 
System 
Geographic Coordinates System/Latitude and Longitude (GCS Lat 
Long WGS84) 
 
Boundary Reference Point 
ID Longitude Latitude 
East 
E1 74° 19' 2.009" E 31° 32' 32.119" N 
E2 / S3 74° 19' 5.029" E 31° 32' 28.088" N 
North 
N1 74° 18' 57.508" E 31° 32' 32.014" N 
N2 74° 18' 57.594" E 31° 32' 31.766" N 
N3 74° 19' 0.673" E 31° 32' 32.423" N 
N4 74° 19' 0.830" E 31° 32' 31.868" N 
West 
W1 74° 18' 54.113" E 31° 32' 31.239" N 
W2 74° 18' 53.876" E 31° 32' 30.096" N 
South 
S1 74° 19' 3.930" E 31° 32' 26.335" N 
S2 74° 19' 3.464" E 31° 32' 27.735" N 
(ii) Boundary description: 
EAST:  
                                                      
44Inserted by the Notification No. SO(UD)16-5/2023, dated: 15-09-2023 vide notification no.162 of 2023, published in the 
Punjab Gazette (Extraordinary), dated: 06 October 2023, pp, 963-967. 
 
 
 
From the reference point E1, it moves towards the south east direction 
along the Los Stop till Ferozepur Road at reference point E2/S3.  
NORTH: 
From the reference point E1 , it moves in the north direction adjacent 
to T Junction till Ferozepur link road at reference point N1. From 
reference point  N1, the boundary  moves west along link Ferozepur 
road through the points N2, N3, and N4 respectively. 
WEST: 
From the reference point N1, it moves to west connecting at reference 
point W1 at Link Ferozepur road opposite Jinnah Town. From 
reference point W1 , the boundary mo ves west along the strom water 
channel (Nullah) through the point W2. 
SOUTH: 
From the reference point W2, it moves  along strom water channel 
(Nullah) to connect at point S1 at Ferozepur Road. From the reference 
point S1, the boundary moves along Ferozepur Road till the reference 
point S2 opposite PMA trade center and then move towards the east 
south along the Ferozepur Road up to the reference point E2/S3. 
(iii) Boundary Map:  
 
     

(iv) Boundary Coordinates: 
 
ID Longitude Latitude 
1 74° 18' 53.888" E 31° 32' 30.531" N 
2 74° 18' 53.894" E 31° 32' 30.132" N 
3 74° 18' 53.980" E 31° 32' 30.823" N 
4 74° 18' 53.987" E 31° 32' 30.823" N 
5 74° 18' 54.113" E 31° 32' 31.232" N 
6 74° 18' 57.885" E 31° 32' 31.848" N 
7 74° 19' 0.684" E 31° 32' 32.337" N 
8 74° 19' 0.749" E 31° 32' 32.343" N 
9 74° 19' 0.798" E 31° 32' 31.978" N 
10 74° 19' 0.811" E 31°32' 31.982" N 
11 74° 19' 1.999" E 31° 32' 32.114" N 
12 74° 19' 2.162" E 31° 32' 31.916" N 
13 74° 19' 2.404" E 31° 32' 31.621" N 
14 74° 19' 2.509" E 31° 32' 31.517" N 
15 74° 19' 3.455" E 31° 32' 30.688" N 
16 74° 19' 3.581" E 31° 32' 30.548" N 
17 74° 19' 3.944" E 31° 32' 26.372" N 
18 74° 18' 59.179" E 31° 32' 28.353" N 
19 74° 18' 59.007" E 31° 32' 28.391" N 
20 74° 19' 3.730" E 31° 32' 26.988" N 
21 74° 19' 4.474" E 31° 32' 29.036" N 
22 74° 19' 4.071" E 31° 32' 29.776" N 
23 74° 19' 3.690" E 31° 32' 30.400" N 
24 74° 19' 2.800" E 31° 32' 31.298" N] 
 
45[D. LAHORE KNOWLEDGE PARK (NAWAZ SHARIF I.T CITY) , Bedian 
Road (6,320 kanals approximately i.e. 790 acres) having the following 
details: 
(i) Boundary References:  
Datum and 
Spheroid 
World Geodetic System 1984 (WGS 84) 
Coordinate 
System 
Universal Transverse Mercator 43N  
 
Boundary Reference Point ID Longitude Latitude 
 NORTH 
N1/W27 74° 27' 40.488" E 31° 27' 29.908" N 
N2 74° 27' 53.039" E 31° 27' 25.439" N 
N3 74° 27' 59.901" E 31° 27' 22.956" N 
N4 74° 28' 0.314" E 31° 27' 24.942" N 
N5 74° 27' 59.773" E 31° 27' 34.441" N 
N6 74° 27' 59.397" E 31° 27' 41.257" N 
N7 74° 28' 9.831" E 31° 27' 39.363" N 
N8 74° 28' 14.174" E 31° 27' 38.325" N 
N9 74° 28' 17.431" E 31° 27' 38.243" N 
N10 74° 28' 20.940" E 31° 27' 37.596" N 
N11 74° 28' 24.957" E 31° 27' 35.641" N 
N12 74° 28' 28.774" E 31° 27' 34.106" N 
N13 74° 28' 34.925" E 31° 27' 30.910" N 
N14 74° 28' 39.064" E 31° 27' 28.416" N 
N15 74° 28' 40.932" E 31° 27' 25.702" N 
N16 74° 28' 43.956" E 31° 27' 21.924" N 
N17 74° 28' 45.567" E 31° 27' 20.898" N 
N18 74° 28' 51.772" E 31° 27' 18.594" N 
N19 74° 28' 53.707" E 31° 27' 17.160" N 
N20 74° 28' 58.182" E 31° 27' 12.660" N 
N21 74° 29' 2.388" E 31° 27' 8.632" N 
EAST 
N22/E1 74° 29' 3.152" E 31° 27' 7.626" N 
E2 74° 29' 3.368" E 31° 27' 6.846" N 
E3 74° 29' 2.570" E 31° 27' 1.120" N 
E4 74° 29' 1.267" E 31° 26' 53.771" N 
E5 74° 29' 0.554" E 31° 26' 51.041" N 
E6 74° 29' 0.428" E 31° 26' 50.748" N 
E7 74° 28' 59.788" E 31° 26' 43.638" N 
E8 74° 28' 59.191" E 31° 26' 42.201" N 
E9 74° 28' 58.639" E 31° 26' 38.496" N 
E10 74° 28' 58.296" E 31° 26' 37.988" N 
E11 74° 28' 57.314" E 31° 26' 34.624" N 
E12 74° 28' 54.689" E 31° 26' 29.653" N 
SOUTH 
E13/S1 74° 28' 52.942" E 31° 26' 25.181" N 
S2 74° 28' 52.608" E 31° 26' 25.243" N 
S3 74° 28' 51.408" E 31° 26' 27.299" N 
S4 74° 28' 49.783" E 31° 26' 27.115" N 
                                                      
45Inserted by the Notification No. SO(H-II)3-3/2021( (P-I) dated: 11-11-2024  vide notification no.167 of 2024, published in 
the Punjab Gazette (Extraordinary), dated: 21 November 2024, pp, 1431-1439. 
 
S5 74° 28' 44.950" E 31° 26' 33.146" N 
S6 74° 28' 40.794" E 31° 26' 34.991" N 
S7 74° 28' 33.647" E 31° 26' 37.188" N 
S8 74° 28' 32.314" E 31° 26' 37.796" N 
S9 74° 28' 28.029" E 31° 26' 42.743" N 
S10 74° 28' 23.546" E 31° 26' 46.467" N 
S11 74° 28' 22.109" E 31° 26' 46.684" N 
S12 74° 28' 16.352" E 31° 26' 46.999" N 
S13 74° 28' 15.078" E 31° 26' 47.310" N 
S14 74° 28' 14.860" E 31° 26' 47.080" N 
S15 74° 28' 13.003" E 31° 26' 48.293" N 
S16 74° 28' 13.236" E 31° 26' 48.524" N 
S17 74° 28' 12.976" E 31° 26' 48.698" N 
S18 74° 28' 10.914" E 31° 26' 47.599" N 
S19 74° 28' 9.193" E 31° 26' 47.811" N 
S20 74° 28' 8.802" E 31° 26' 47.751" N 
WEST 
S21/W1 74° 28' 7.177" E 31° 26' 49.187" N 
W2 74° 28' 10.011" E 31° 26' 52.028" N 
W3 74° 28' 6.335" E 31° 26' 56.532" N 
W4 74° 27' 56.762" E 31° 26' 51.914" N 
W5 74° 27' 50.515" E 31° 27' 0.771" N 
W6 74° 27' 42.652" E 31° 27' 11.487" N 
W7 74° 27' 41.178" E 31° 27' 13.888" N 
W8 74° 27' 40.708" E 31° 27' 15.614" N 
W9 74° 27' 40.542" E 31° 27' 17.341" N 
W10 74° 27' 40.884" E 31° 27' 20.850" N 
W11 74° 27' 40.753" E 31° 27' 23.843" N 
W12 74° 27' 40.079" E 31° 27' 26.075" N 
W13 74° 27' 39.609" E 31° 27' 27.915" N 
W14 74° 27' 45.247" E 31° 27' 24.221" N 
W15 74° 27' 57.140" E 31° 27' 20.259" N 
W16 74° 27' 58.199" E 31° 27' 19.613" N 
W17 74° 27' 57.780" E 31° 27' 10.330" N 
W18 74° 27' 57.840" E 31° 27' 0.899" N 
W19 74° 27' 53.938" E 31° 27' 0.371" N 
W20 74° 27' 45.523" E 31° 27' 11.565" N 
W21 74° 27' 43.750" E 31° 27' 14.042" N 
W22 74° 27' 43.213" E 31° 27' 15.693" N 
W23 74° 27' 42.979" E 31° 27' 18.738" N 
W24 74° 27' 43.221" E 31° 27' 21.797" N 
W25 74° 27' 45.134" E 31° 27' 21.163" N 
W26 74° 27' 45.439" E 31° 27' 22.054" N 
N1/W27 74° 27' 40.488" E 31° 27' 29.908" N 
Note: Area and boundary references are as per site survey of the 
land taking reference mainly from offset of existing wall and excluding 
PKLI area but including front road of PKLI.  
(ii) Boundary Description:  
NORTH:  
The northern boundary of jurisdiction start from the reference point 
N1/W27 (74° 27' 40.488" E,31° 27' 29.908” N)  which is placed near 
the entrance gate of PKLI connected to the Avenue 5 and it moves 
towards the Eastern side along Avenue 12 which passes th rough the 
reference point N2 (74° 27' 53.039" E,31° 27' 25.439” N), N3 (74° 27' 
59.901" E,31° 27' 22.956” N) & N4 (74° 28' 0.314" E,31° 27' 24.942” 
N) towards T-Junction between the Avenue 8 and the Avenue 9 having 
the reference point N5 (74° 27' 59.773" E ,31° 27' 34.441” N), N6 
(74° 27' 59.397" E,31° 27' 41.257” N) moves toward  Dera 
Khundadad where reference point N7 (74° 28' 9.831" E,31° 27' 
39.363” N), N8 (74° 28' 14.174" E,31° 27' 38.325” N) is placed 
passing alongside Sector Z1 towards east west, from  reference point 
N9 (74° 28' 17.431" E,31° 27' 38.243” N), N10 (74° 28' 20.940" 
E,31° 27' 37.596” N), N11 (74° 28' 24.957" E,31° 27' 35.641” N), 
N12 (74° 28' 28.774" E,31° 27' 34.106” N) & N13 (74° 28' 34.925" 
E,31° 27' 30.910” N) it passes alongside sector where reference point 
N14 (74° 28' 39.064" E,31° 27' 28.416” N),N15 (74° 28' 40.932" 
E,31° 27' 25.702” N),N16 (74° 28' 43.956" E,31° 27' 21.924” N),N17 
(74° 28' 45.567" E,31° 27' 20.898” N),N18 (74° 28' 51.772" E,31° 27' 
18.594” N),N19 (74° 28' 53.707" E ,31° 27' 17.160” N),N20 (74° 28' 
58.182" E,31° 27' 12.660” N) and N21 (74° 29' 2.388" E,31° 27' 
8.632” N) is exactly placed on the northeast side of Alfatah Cricket 
Ground Knowledge Park Lahore from that point it finally end at the 
last reference point N22 /E1 besides Defence Raya Golf Resort till 
reference point N22/E1 (74° 29' 3.152" E,31° 27' 7.626” N). 
EAST: 
From reference point N22/E1 (74° 29' 3.152" E,31° 27' 7.626” N) at 
Avenue 13 from north to south is placed on the road behind the 
school, It moves a longside to west of sector Y towards the Southern 
side through E2 (74° 29' 3.368" E,31° 27' 6.846” N),E3 (74° 29' 
2.570" E,31° 27' 1.120” N),E4 (74° 29' 1.267" E,31° 26' 53.771” N),E 
(74° 29' 0.554" E,31° 26' 51.041” N),E6 (74° 29' 0.428" E,31° 26' 
50.748” N),E7 (74° 28' 59.788" E,31° 26' 43.638” N),E8 (74° 28' 
59.191" E,31° 26' 42.201” N),E9 (74° 28' 58.639" E,31° 26' 38.496” 
N),E10 (74° 28' 58.296" E,31° 26' 37.988” N),E11 (74° 28' 57.314" 
E,31° 26' 34.624” N) & E12 (74° 28' 54.689" E,31° 26' 29.653” N) to 
the west of Dera Chanal till reference point E13/S1 (74° 28' 52.942" 
E,31° 26' 25.181” N) adjacent to Rohi Nala towards Block H.  
SOUTH: 
From reference point E13/S1 (74° 28' 52.942" E,31° 26' 25.181” N) it 
moves to West towards Dera Chahal and passes through the reference 
points S2 (74° 28' 52.608" E,31° 26' 25.243” N),S3 (74° 28' 51.408" 
E,31° 26' 27.299” N),S4 (74° 28' 49.783" E,31° 26' 27.115” N),S5 
(74° 28' 44.950" E,31° 26' 33.146” N),S6 (74° 28' 40.794" E,31° 26' 
34.991” N),S7 (74° 28' 33.647" E,31°  26' 37.188” N),S8 (74° 28' 
32.314" E,31° 26' 37.796” N),S9 (74° 28' 28.029" E,31° 26' 42.743” 
N) & S10 (74° 28' 23.546" E,31° 26' 46.467” N) connecting to S11 
(74° 28' 22.109" E,31° 26' 46.684” N) near Elite Police Force 
Headquarters which moves towards t he points S12 (74° 28' 16.352" 
E,31° 26' 46.999” N),S13 (74° 28' 15.078" E,31° 26' 47.310” N), S14 
(74° 28' 14.860" E,31° 26' 47.080” N),S15 (74° 28' 13.003" E,31° 26' 
48.293” N),S16 (74° 28' 13.236" E,31° 26' 48.524” N),S17 (74° 28' 
12.976" E,31° 26' 48.698” N),S18 (74° 28' 10.914" E,31° 26' 47.599” 
N),S19 (74° 28' 9.193" E,31° 26' 47.811” N) & S20 (74° 28' 8.802" 
E,31° 26' 47.751” N) and the last reference point of South is ends at 
the back of Elite Police Force Headquarters S21/W1 (74° 28' 7.177" 
E,31° 26' 49.187” N). 
WEST:  
S21/W1 (74° 28' 7.177" E,31° 26' 49.187” N), W2 (74° 28' 10.011" 
E,31° 26' 52.028” N) placed near residential houses through W3 (74° 
28' 6.335" E,31° 26' 56.532” N), W4 (74° 27' 56.762" E,31° 26' 
51.914” N) to W5 (74° 27' 50.515" E,31 ° 27' 0.771” N) which is 
placed near Chota Mota Singh.  From reference point W6 (74° 27' 
42.652" E,31° 27' 11.487” N), W7 (74° 27' 41.178" E,31° 27' 13.888” 
N), W8 (74° 27' 40.708" E,31° 27' 15.614” N), W9 (74° 27' 40.542" 
E,31° 27' 17.341” N), W10 (74° 27'  40.884" E,31° 27' 20.850” N), 
W11 (74° 27' 40.753" E,31° 27' 23.843” N), W12 (74° 27' 40.079" 
E,31° 27' 26.075” N), W13 (74° 27' 39.609" E,31° 27' 27.915” N) is 
ended the front side of Pakistan Kidney & Liver Institute and Research 
Center and connected at  N1/W27 (74° 27' 40.488" E,31° 27' 29.908” 
N) Near Sector – E DHA Phase 9 at Northern Side. The reference point 
of PKLI boundary which passes through W19 (74° 27' 53.938" E,31° 
27' 0.371” N) which is placed near ARCOP consultant QS Section, 
which is then connected to reference point W18 (74° 27' 57.840" 
E,31° 27' 0.899” N) placed on the road passing alongside the Pakistan 
Kidney & Liver Institute and Research Centre & from that boundary 
moves towards the reference point W15 (74° 27' 57.140" E,31° 27' 
20.259” N), & W16 (74° 27' 58.199" E,31° 27' 19.613” N) place at the 
corner point of schools GGCMS Lehna Singh extent at Avenue 5 and  
from there it connects to the boundary of PKLI having referenc e point 
W20 (74° 27' 45.523" E,31° 27' 11.565” N), W21 (74° 27' 43.750" 
E,31° 27' 14.042” N), W22 (74° 27' 43.213" E,31° 27' 15.693” N), 
W23 (74° 27' 42.979" E,31° 27' 18.738” N), W24 (74° 27' 43.221" 
E,31° 27' 21.797” N), W25 (74° 27' 45.134" E,31° 27' 21 .163” N) & 
W26 (74° 27' 45.439" E,31° 27' 22.054” N). 
(iii) Boundary Map:
(iv) Boundary Coordinates: 
ID Longitude Latitude ID Longitude Latitude 
1 74° 28' 14.848" E 31° 27' 38.256" N 98 74° 28' 29.812" E 31° 26' 40.642" N 
2 74° 28' 15.807" E 31° 27' 38.206" N 99 74° 28' 29.477" E 31° 26' 41.034" N 
3 74° 28' 16.596" E 31° 27' 38.234" N 100 74° 28' 28.985" E 31° 26' 41.629" N 
4 74° 28' 17.431" E 31° 27' 38.243" N 101 74° 28' 28.029" E 31° 26' 42.743" N 
5 74° 28' 18.060" E 31° 27' 38.194" N 102 74° 28' 27.595" E 31° 26' 43.288" N 
6 74° 28' 18.997" E 31° 27' 38.076" N 103 74° 28' 27.045" E 31° 26' 43.796" N 
7 74° 28' 19.626" E 31° 27' 37.929" N 104 74° 28' 25.980" E 31° 26' 44.633" N 
8 74° 28' 20.357" E 31° 27' 37.733" N 105 74° 28' 24.995" E 31° 26' 45.426" N 
9 74° 28' 20.940" E 31° 27' 37.596" N 106 74° 28' 23.546" E 31° 26' 46.467" N 
10 74° 28' 22.382" E 31° 27' 36.824" N 107 74° 28' 22.109" E 31° 26' 46.684" N 
11 74° 28' 22.828" E 31° 27' 36.609" N 108 74° 28' 18.425" E 31° 26' 46.910" N 
12 74° 28' 24.957" E 31° 27' 35.641" N 109 74° 28' 16.352" E 31° 26' 46.999" N 
13 74° 28' 25.825" E 31° 27' 35.260" N 110 74° 28' 15.627" E 31° 26' 47.124" N 
14 74° 28' 26.236" E 31° 27' 35.064" N 111 74° 28' 15.078" E 31° 26' 47.310" N 
15 74° 28' 27.995" E 31° 27' 34.364" N 112 74° 28' 14.860" E 31° 26' 47.080" N 
16 74° 28' 28.774" E 31° 27' 34.106" N 113 74° 28' 13.003" E 31° 26' 48.293" N 
17 74° 28' 29.540" E 31° 27' 33.764" N 114 74° 28' 13.236" E 31° 26' 48.524" N 
18 74° 28' 30.458" E 31° 27' 33.295" N 115 74° 28' 12.976" E 31° 26' 48.698" N 
19 74° 28' 31.052" E 31° 27' 33.002" N 116 74° 28' 10.914" E 31° 26' 47.599" N 
20 74° 28' 32.411" E 31° 27' 32.278" N 117 74° 28' 10.581" E 31° 26' 47.648" N 
21 74° 28' 33.648" E 31° 27' 31.631" N 118 74° 28' 9.193" E 31° 26' 47.811" N 
22 74° 28' 34.925" E 31° 27' 30.910" N 119 74° 28' 8.802" E 31° 26' 47.751" N 
23 74° 28' 36.003" E 31° 27' 30.312" N 120 74° 28' 7.177" E 31° 26' 49.187" N 
24 74° 28' 38.173" E 31° 27' 28.964" N 121 74° 28' 10.011" E 31° 26' 52.028" N 
25 74° 28' 39.064" E 31° 27' 28.416" N 122 74° 28' 8.969" E 31° 26' 53.266" N 
26 74° 28' 39.609" E 31° 27' 27.518" N 123 74° 28' 8.013" E 31° 26' 54.468" N 
27 74° 28' 40.190" E 31° 27' 26.678" N 124 74° 28' 6.335" E 31° 26' 56.532" N 
28 74° 28' 40.932" E 31° 27' 25.702" N 125 74° 28' 5.422" E 31° 26' 56.083" N 
29 74° 28' 41.776" E 31° 27' 24.540" N 126 74° 28' 2.649" E 31° 26' 54.688" N 
30 74° 28' 42.678" E 31° 27' 23.379" N 127 74° 27' 56.762" E 31° 26' 51.914" N 
31 74° 28' 43.306" E 31° 27' 22.637" N 128 74° 27' 54.958" E 31° 26' 54.615" N 
32 74° 28' 43.956" E 31° 27' 21.924" N 129 74° 27' 53.579" E 31° 26' 56.352" N 
33 74° 28' 44.459" E 31° 27' 21.455" N 130 74° 27' 51.919" E 31° 26' 58.827" N 
34 74° 28' 44.835" E 31° 27' 21.220" N 131 74° 27' 50.515" E 31° 27' 0.771" N 
35 74° 28' 45.567" E 31° 27' 20.898" N 132 74° 27' 42.652" E 31° 27' 11.487" N 
36 74° 28' 46.081" E 31° 27' 20.692" N 133 74° 27' 41.178" E 31° 27' 13.888" N 
37 74° 28' 47.384" E 31° 27' 20.228" N 134 74° 27' 40.708" E 31° 27' 15.614" N 
38 74° 28' 48.847" E 31° 27' 19.709" N 135 74° 27' 40.542" E 31° 27' 17.341" N 
39 74° 28' 50.503" E 31° 27' 19.122" N 136 74° 27' 40.884" E 31° 27' 20.850" N 
40 74° 28' 51.772" E 31° 27' 18.594" N 137 74° 27' 40.753" E 31° 27' 23.843" N 
41 74° 28' 52.874" E 31° 27' 17.815" N 138 74° 27' 40.079" E 31° 27' 26.075" N 
42 74° 28' 53.707" E 31° 27' 17.160" N 139 74° 27' 40.081" E 31° 27' 26.087" N 
43 74° 28' 54.780" E 31° 27' 16.086" N 140 74° 27' 39.609" E 31° 27' 27.915" N 
44 74° 28' 55.522" E 31° 27' 15.325" N 141 74° 27' 40.488" E 31° 27' 29.908" N 
45 74° 28' 56.927" E 31° 27' 13.910" N 142 74° 27' 42.582" E 31° 27' 29.336" N 
46 74° 28' 58.182" E 31° 27' 12.660" N 143 74° 27' 45.992" E 31° 27' 28.046" N 
47 74° 28' 59.598" E 31° 27' 11.215" N 144 74° 27' 53.039" E 31° 27' 25.439" N 
48 74° 29' 0.641" E 31° 27' 10.223" N 145 74° 27' 55.900" E 31° 27' 24.371" N 
49 74° 29' 2.388" E 31° 27' 8.632" N 146 74° 27' 57.335" E 31° 27' 23.837" N 
50 74° 29' 3.152" E 31° 27' 7.626" N 147 74° 27' 59.901" E 31° 27' 22.956" N 
51 74° 29' 3.323" E 31° 27' 7.275" N 148 74° 28' 0.090" E 31° 27' 23.414" N 
52 74° 29' 3.368" E 31° 27' 6.846" N 149 74° 28' 0.142" E 31° 27' 23.728" N 
53 74° 29' 3.287" E 31° 27' 5.801" N 150 74° 28' 0.266" E 31° 27' 24.323" N 
54 74° 29' 3.194" E 31° 27' 4.884" N 151 74° 28' 0.314" E 31° 27' 24.942" N 
55 74° 29' 3.078" E 31° 27' 3.938" N 152 74° 28' 0.262" E 31° 27' 25.265" N 
56 74° 29' 2.939" E 31° 27' 3.099" N 153 74° 28' 0.119" E 31° 27' 26.078" N 
57 74° 29' 2.570" E 31° 27' 1.120" N 154 74° 28' 0.094" E 31° 27' 26.921" N 
58 74° 29' 2.420" E 31° 27' 0.223" N 155 74° 28' 0.095" E 31° 27' 27.718" N 
59 74° 29' 2.316" E 31° 26' 59.423" N 156 74° 28' 0.037" E 31° 27' 29.116" N 
60 74° 29' 2.097" E 31° 26' 58.143" N 157 74° 28' 0.024" E 31° 27' 30.504" N 
61 74° 29' 1.832" E 31° 26' 56.691" N 158 74° 27' 59.980" E 31° 27' 31.481" N 
62 74° 29' 1.544" E 31° 26' 55.452" N 159 74° 27' 59.892" E 31° 27' 32.830" N 
63 74° 29' 1.267" E 31° 26' 53.771" N 160 74° 27' 59.773" E 31° 27' 34.441" N 
64 74° 29' 1.048" E 31° 26' 52.786" N 161 74° 27' 59.685" E 31° 27' 35.777" N 
65 74° 29' 0.772" E 31° 26' 51.860" N 162 74° 27' 59.577" E 31° 27' 37.549" N 
66 74° 29' 0.554" E 31° 26' 51.041" N 163 74° 27' 59.397" E 31° 27' 41.257" N 
67 74° 29' 0.428" E 31° 26' 50.748" N 164 74° 28' 1.199" E 31° 27' 40.939" N 
68 74° 28' 59.788" E 31° 26' 43.638" N 165 74° 28' 3.266" E 31° 27' 40.620" N 
69 74° 28' 59.191" E 31° 26' 42.201" N 166 74° 28' 5.810" E 31° 27' 40.143" N 
70 74° 28' 58.845" E 31° 26' 39.972" N 167 74° 28' 7.745" E 31° 27' 39.779" N 
71 74° 28' 58.639" E 31° 26' 38.496" N 168 74° 28' 9.831" E 31° 27' 39.363" N 
72 74° 28' 58.296" E 31° 26' 37.988" N 169 74° 28' 10.619" E 31° 27' 39.157" N 
73 74° 28' 57.314" E 31° 26' 34.624" N 170 74° 28' 11.293" E 31° 27' 38.942" N 
74 74° 28' 56.318" E 31° 26' 32.856" N 171 74° 28' 11.991" E 31° 27' 38.736" N 
75 74° 28' 55.620" E 31° 26' 31.483" N 172 74° 28' 12.756" E 31° 27' 38.609" N 
76 74° 28' 54.689" E 31° 26' 29.653" N 173 74° 28' 13.431" E 31° 27' 38.462" N 
77 74° 28' 53.932" E 31° 26' 27.506" N 174 74° 28' 14.174" E 31° 27' 38.325" N 
78 74° 28' 53.509" E 31° 26' 26.368" N 175 74° 28' 14.848" E 31° 27' 38.256" N 
79 74° 28' 52.942" E 31° 26' 25.181" N 176 74° 27' 45.272" E 31° 27' 24.226" N 
80 74° 28' 52.608" E 31° 26' 25.243" N 177 74° 27' 45.245" E 31° 27' 24.235" N 
81 74° 28' 51.408" E 31° 26' 27.299" N 178 74° 27' 45.247" E 31° 27' 24.221" N 
82 74° 28' 49.783" E 31° 26' 27.115" N 179 74° 27' 45.439" E 31° 27' 22.054" N 
83 74° 28' 48.305" E 31° 26' 29.107" N 180 74° 27' 45.134" E 31° 27' 21.163" N 
84 74° 28' 45.486" E 31° 26' 32.490" N 181 74° 27' 43.221" E 31° 27' 21.797" N 
85 74° 28' 44.950" E 31° 26' 33.146" N 182 74° 27' 42.979" E 31° 27' 18.738" N 
86 74° 28' 42.729" E 31° 26' 34.147" N 183 74° 27' 43.213" E 31° 27' 15.693" N 
87 74° 28' 41.729" E 31° 26' 34.556" N 184 74° 27' 43.750" E 31° 27' 14.042" N 
88 74° 28' 40.794" E 31° 26' 34.991" N 185 74° 27' 45.523" E 31° 27' 11.565" N 
89 74° 28' 40.033" E 31° 26' 35.202" N 186 74° 27' 47.993" E 31° 27' 8.167" N 
90 74° 28' 39.062" E 31° 26' 35.525" N 187 74° 27' 52.743" E 31° 27' 2.019" N 
91 74° 28' 36.694" E 31° 26' 36.267" N 188 74° 27' 53.938" E 31° 27' 0.371" N 
92 74° 28' 35.445" E 31° 26' 36.654" N 189 74° 27' 57.840" E 31° 27' 0.899" N 
93 74° 28' 34.604" E 31° 26' 36.903" N 190 74° 27' 57.780" E 31° 27' 10.330" N 
94 74° 28' 33.647" E 31° 26' 37.188" N 191 74° 27' 58.199" E 31° 27' 19.613" N 
95 74° 28' 32.314" E 31° 26' 37.796" N 192 74° 27' 57.140" E 31° 27' 20.259" N 
96 74° 28' 31.535" E 31° 26' 38.611" N 193 74° 27' 52.981" E 31° 27' 21.731" N 
97 74° 28' 30.521" E 31° 26' 39.788" N 194 74° 27' 45.272" E 31° 27' 24.226" N] 
46
[E. Sialkot on Wazirabad Road  (5092.02 kanals approximately i.e. 
636.27 acres) having the following details:  
(i) Boundary References:  
Datum and 
Spheroid 
World Geodetic System 1984 (WGS 84) 
Coordinate 
System 
Universal Transverse Mercator 43N  
 
Boundary Reference Point ID Longitude Latitude 
NORTH 
N1/W4 74° 25' 14.440" E 32° 28' 39.169" N 
N2 74° 26' 2.420" E 32° 28' 39.607" N 
N3/E1 74° 26' 7.863" E 32° 28' 38.372" N 
EAST 
N3/E1 74° 26' 7.863" E 32° 28' 38.372" N 
E2 74° 26' 11.425" E 32° 28' 34.352" N 
E3 74° 26' 8.013" E 32° 28' 28.817" N 
E4 74° 26' 0.550" E 32° 28' 21.634" N 
E5 74° 26' 8.361" E 32° 28' 20.808" N 
E6 74° 26' 13.448" E 32° 28' 17.890" N 
E7 74° 26' 13.971" E 32° 28' 9.048" N 
E8 74° 26' 34.835" E 32° 28' 9.344" N 
S1/E9 74° 26' 34.983" E 32° 27' 44.525" N 
SOUTH 
S1/E9 74° 26' 34.983" E 32° 27' 44.525" N 
S2 74° 26' 20.446" E 32° 27' 43.377" N 
S3 74° 25' 51.214" E 32° 27' 37.228" N 
S4/W1 74° 25' 34.978" E 32° 27' 33.180" N 
WEST 
S4/W1 74° 25' 34.978" E 32° 27' 33.180" N 
W2 74° 25' 23.995" E 32° 27' 59.311" N 
W3 74° 25' 23.771" E 32° 28' 0.131" N 
N1/W4 74° 25' 14.440" E 32° 28' 39.169" N 
(ii) Boundary Description:  
NORTH:  
The northern boundary of jurisdiction start from  the reference point 
N1/W4 (74° 25' 14.440" E, 32° 28' 39.169" N) near the railway line , 
Where it moves eastward, continuing along with the railway track and 
passes through the reference point N2 (74° 26' 2.420" E, 32° 28' 
39.607" N) and extends further to the reference point N3/E1 (74° 26' 
7.863" E, 32° 28' 38.372" N) situated close to Wazirabad Road. 
EAST: 
                                                      
46Inserted by the Notification No.SO(H-II)3-3/2021( (P -II) dated: 27 -01-2026  vide  Gazette notification no.07 of 2026, 
published in the Punjab Gazette (Extraordinary), dated: 27 January 2026, pp, 3993-4000. 
 
The eastern boundary start from  reference point N3/E1 (74° 26' 
7.863" E, 32° 28' 38.372" N)  and continues through several points in 
a generally southeast direction  where it first reaches reference point 
E2 (74° 26' 11.425" E, 32° 28' 34.352" N), then proceeds to reference 
point E3 (74° 26' 8.013" E, 32° 28' 28.817" N), running alongside the 
rural settlement of Dulchike. The boundary line then moves through 
reference points E4 (74° 26' 0.550" E, 32° 28' 21.634" N), E5 (74° 26' 
8.361" E, 32° 28' 20.808" N), E6 (74° 26' 13.448" E, 32° 28' 17.890" 
N) and E7 (74° 26' 13.971" E, 32° 28' 9.048" N). It then reaches 
reference point E8 (74° 26' 34.835" E, 32° 28' 9.344" N) which lies 
adjacent to Ugoki Cantonment and finally continues to reference point 
S1/E9 (74° 26' 34.983" E, 32° 27' 44.525" N) situated near the rural 
settlement of Veerum.  
SOUTH: 
The southern boundary start from reference point S1/E9 (74° 26' 
34.983" E, 32° 27' 44.525 " N) and stretches across various points 
towards the west. It passes through reference point S2 (74° 25' 
51.214" E, 32° 27' 37.228" N), then to S3 (74° 26' 20.446" E, 31° 26' 
52.104" N), following a tertiary road that connects to the Marala -Ravi 
link and continues to reference point S4/W1 (74° 25' 34.978" E, 32° 
27' 33.180" N) located beside the Barala River link. 
WEST:  
The western boundary start from reference point S4/W1 (74° 25' 
34.978" E, 32° 27' 33.180" N) towards the north  where it moves to 
reference point W2 (74° 25' 23.771" E, 32° 28' 0.131" N) which 
connects to Ganjianwala Road. From there, the boundary returns to 
the original reference point N1/W4 (74° 25' 14.440" E, 32° 28' 
39.169" N) located near Wazirabad Road. 
  
(iii) Boundary Map: 
 

(iv) Boundary Coordinates: 
ID Longitude Latitude ID Longitude Latitude 
1 74° 25' 38.869" E 32° 28' 37.420" N 154 74° 26' 28.050" E 32° 27' 43.968" N 
2 74° 25' 40.328" E 32° 28' 37.547" N 155 74° 26' 31.401" E 32° 27' 44.266" N 
3 74° 26' 13.659" E 32° 28' 8.941" N 156 74° 26' 34.964" E 32° 27' 47.271" N 
4 74° 26' 13.980" E 32° 28' 3.761" N 157 74° 26' 34.945" E 32° 27' 49.378" N 
5 74° 26' 34.902" E 32° 28' 3.846" N 158 74° 26' 34.954" E 32° 27' 52.515" N 
6 74° 26' 24.133" E 32° 28' 3.790" N 159 74° 26' 34.899" E 32° 27' 56.062" N 
7 74° 26' 24.178" E 32° 28' 3.551" N 160 74° 26' 34.871" E 32° 27' 59.197" N 
8 74° 26' 34.823" E 32° 28' 3.563" N 161 74° 26' 34.869" E 32° 28' 5.293" N 
9 74° 26' 34.842" E 32° 28' 2.132" N 162 74° 26' 34.853" E 32° 28' 6.751" N 
10 74° 26' 33.948" E 32° 28' 2.125" N 163 74° 26' 34.843" E 32° 28' 8.143" N 
11 74° 26' 33.948" E 32° 28' 1.583" N 164 74° 26' 32.478" E 32° 28' 9.338" N 
12 74° 26' 34.850" E 32° 28' 1.596" N 165 74° 26' 29.785" E 32° 28' 9.292" N 
13 74° 25' 33.076" E 32° 27' 59.957" N 166 74° 26' 26.615" E 32° 28' 9.238" N 
14 74° 25' 33.146" E 32° 27' 59.295" N 167 74° 26' 23.527" E 32° 28' 9.186" N 
15 74° 25' 32.889" E 32° 27' 59.218" N 168 74° 26' 20.400" E 32° 28' 9.135" N 
16 74° 25' 32.954" E 32° 27' 58.493" N 169 74° 26' 17.018" E 32° 28' 9.089" N 
17 74° 25' 32.563" E 32° 27' 58.387" N 170 74° 26' 13.574" E 32° 28' 12.536" N 
18 74° 25' 32.607" E 32° 27' 57.887" N 171 74° 26' 13.505" E 32° 28' 15.463" N 
19 74° 25' 30.682" E 32° 27' 57.829" N 172 74° 26' 10.929" E 32° 28' 17.826" N 
20 74° 25' 30.682" E 32° 27' 57.161" N 173 74° 26' 8.489" E 32° 28' 17.764" N 
21 74° 25' 31.863" E 32° 27' 57.248" N 174 74° 26' 4.196" E 32° 28' 20.731" N 
22 74° 25' 31.914" E 32° 27' 56.360" N 175 74° 25' 59.575" E 32° 28' 20.591" N 
23 74° 25' 31.403" E 32° 27' 56.337" N 176 74° 25' 55.528" E 32° 28' 20.453" N 
24 74° 25' 31.429" E 32° 27' 55.693" N 177 74° 25' 55.508" E 32° 28' 16.602" N 
25 74° 25' 32.571" E 32° 27' 55.568" N 178 74° 25' 53.388" E 32° 28' 20.222" N 
26 74° 25' 32.454" E 32° 27' 57.110" N 179 74° 25' 53.748" E 32° 28' 24.914" N 
27 74° 25' 33.223" E 32° 27' 57.248" N 180 74° 25' 52.755" E 32° 28' 24.409" N 
28 74° 25' 33.170" E 32° 27' 57.823" N 181 74° 25' 54.005" E 32° 28' 20.670" N 
29 74° 25' 34.622" E 32° 27' 57.919" N 182 74° 25' 57.102" E 32° 28' 21.305" N 
30 74° 25' 34.879" E 32° 27' 57.129" N 183 74° 25' 53.831" E 32° 28' 17.973" N 
31 74° 25' 34.045" E 32° 27' 57.003" N 184 74° 25' 58.693" E 32° 28' 22.114" N 
32 74° 25' 34.143" E 32° 27' 55.880" N 185 74° 26' 0.416" E 32° 28' 29.299" N 
33 74° 25' 35.040" E 32° 27' 55.918" N 186 74° 26' 3.797" E 32° 28' 28.694" N 
34 74° 25' 35.233" E 32° 27' 54.419" N 187 74° 26' 8.018" E 32° 28' 34.304" N 
35 74° 25' 37.480" E 32° 27' 54.492" N 188 74° 26' 10.354" E 32° 28' 36.426" N 
36 74° 25' 37.427" E 32° 27' 55.245" N 189 74° 26' 2.726" E 32° 28' 36.338" N 
37 74° 25' 38.198" E 32° 27' 55.297" N 190 74° 26' 2.771" E 32° 28' 32.368" N 
38 74° 25' 38.249" E 32° 27' 55.708" N 191 74° 26' 5.508" E 32° 28' 32.441" N 
39 74° 25' 39.174" E 32° 27' 55.262" N 192 74° 26' 5.505" E 32° 28' 31.272" N 
40 74° 25' 39.705" E 32° 27' 55.297" N 193 74° 26' 0.285" E 32° 28' 31.120" N 
41 74° 25' 39.945" E 32° 27' 55.999" N 194 74° 25' 57.657" E 32° 28' 34.309" N 
42 74° 25' 40.922" E 32° 27' 55.965" N 195 74° 26' 0.267" E 32° 28' 34.385" N 
43 74° 25' 40.922" E 32° 27' 55.382" N 196 74° 26' 0.210" E 32° 28' 35.351" N 
44 74° 25' 41.727" E 32° 27' 55.365" N 197 74° 25' 57.625" E 32° 28' 35.329" N 
45 74° 25' 41.727" E 32° 27' 55.691" N 198 74° 25' 57.594" E 32° 28' 36.242" N 
46 74° 25' 44.827" E 32° 27' 55.897" N 299 74° 26' 1.648" E 32° 28' 36.335" N 
47 74° 25' 44.805" E 32° 27' 56.732" N 200 74° 26' 1.509" E 32° 28' 38.279" N 
48 74° 25' 44.099" E 32° 27' 56.860" N 201 74° 25' 57.810" E 32° 28' 29.874" N 
49 74° 25' 44.141" E 32° 27' 57.674" N 202 74° 26' 5.704" E 32° 28' 38.328" N 
50 74° 25' 42.482" E 32° 27' 57.775" N 203 74° 26' 7.966" E 32° 28' 36.422" N 
51 74° 25' 42.465" E 32° 27' 58.632" N 204 74° 25' 17.875" E 32° 28' 39.269" N 
52 74° 25' 43.752" E 32° 27' 58.804" N 205 74° 25' 21.525" E 32° 28' 39.261" N 
53 74° 25' 43.670" E 32° 27' 59.893" N 206 74° 25' 24.865" E 32° 28' 39.253" N 
54 74° 25' 44.298" E 32° 28' 0.251" N 207 74° 25' 28.725" E 32° 28' 39.244" N 
55 74° 25' 45.154" E 32° 28' 0.352" N 208 74° 25' 32.422" E 32° 28' 39.290" N 
56 74° 25' 47.421" E 32° 28' 0.078" N 209 74° 25' 36.273" E 32° 28' 39.337" N 
57 74° 25' 47.438" E 32° 28' 0.922" N 210 74° 25' 38.609" E 32° 28' 39.366" N 
58 74° 25' 48.508" E 32° 28' 0.915" N 211 74° 25' 40.317" E 32° 28' 39.382" N 
59 74° 25' 48.525" E 32° 28' 0.237" N 212 74° 25' 43.419" E 32° 28' 39.390" N 
60 74° 25' 50.279" E 32° 28' 0.164" N 213 74° 25' 46.504" E 32° 28' 39.398" N 
61 74° 25' 50.339" E 32° 27' 59.183" N 214 74° 25' 50.100" E 32° 28' 39.407" N 
62 74° 25' 51.203" E 32° 27' 59.139" N 215 74° 25' 53.492" E 32° 28' 39.415" N 
63 74° 25' 51.143" E 32° 28' 0.951" N 216 74° 25' 57.085" E 32° 28' 39.470" N 
64 74° 25' 51.964" E 32° 28' 0.973" N 217 74° 25' 59.814" E 32° 28' 39.558" N 
65 74° 25' 51.973" E 32° 28' 0.000" N 218 74° 25' 35.613" E 32° 28' 4.061" N 
66 74° 25' 52.444" E 32° 27' 59.970" N 219 74° 25' 36.694" E 32° 28' 4.200" N 
67 74° 25' 52.889" E 32° 28' 0.179" N 220 74° 25' 40.313" E 32° 28' 6.202" N 
68 74° 25' 53.128" E 32° 28' 0.511" N 221 74° 25' 40.110" E 32° 28' 6.973" N 
69 74° 25' 53.693" E 32° 28' 0.800" N 222 74° 25' 35.281" E 32° 28' 6.371" N 
70 74° 25' 53.111" E 32° 28' 0.821" N 223 74° 25' 40.714" E 32° 28' 10.443" N 
71 74° 25' 53.753" E 32° 28' 0.107" N 224 74° 25' 42.591" E 32° 28' 5.582" N 
72 74° 25' 54.831" E 32° 27' 59.977" N 225 74° 25' 43.184" E 32° 28' 5.579" N 
73 74° 25' 55.199" E 32° 27' 59.782" N 226 74° 25' 43.226" E 32° 28' 6.391" N 
74 74° 25' 55.712" E 32° 27' 59.782" N 227 74° 25' 44.210" E 32° 28' 6.500" N 
75 74° 25' 55.695" E 32° 28' 0.345" N 228 74° 25' 44.125" E 32° 28' 7.600" N 
76 74° 25' 56.499" E 32° 28' 0.403" N 229 74° 25' 45.644" E 32° 28' 7.637" N 
77 74° 25' 56.474" E 32° 28' 1.081" N 230 74° 25' 45.472" E 32° 28' 9.911" N 
78 74° 25' 55.147" E 32° 28' 1.096" N 231 74° 25' 44.660" E 32° 28' 9.911" N 
79 74° 25' 53.796" E 32° 28' 1.190" N 232 74° 25' 44.595" E 32° 28' 10.560" N 
80 74° 25' 53.744" E 32° 28' 1.767" N 233 74° 26' 28.999" E 32° 27' 55.069" N 
81 74° 25' 54.300" E 32° 28' 1.803" N 234 74° 26' 28.603" E 32° 27' 53.845" N 
82 74° 25' 54.309" E 32° 28' 2.128" N 235 74° 26' 24.464" E 32° 27' 53.854" N 
83 74° 25' 53.650" E 32° 28' 2.128" N 236 74° 26' 24.635" E 32° 27' 54.942" N 
84 74° 25' 53.633" E 32° 28' 2.944" N 237 74° 26' 23.341" E 32° 27' 55.187" N 
85 74° 25' 52.298" E 32° 28' 3.045" N 238 74° 26' 23.084" E 32° 27' 56.384" N 
86 74° 25' 52.281" E 32° 28' 2.633" N 239 74° 26' 21.533" E 32° 27' 57.409" N 
87 74° 25' 52.247" E 32° 28' 2.323" N 240 74° 26' 19.619" E 32° 27' 56.865" N 
88 74° 25' 52.349" E 32° 28' 1.218" N 241 74° 26' 19.822" E 32° 27' 57.336" N 
89 74° 25' 51.913" E 32° 28' 1.211" N 242 74° 26' 22.421" E 32° 27' 58.025" N 
90 74° 25' 51.887" E 32° 28' 2.114" N 243 74° 26' 21.672" E 32° 27' 57.726" N 
91 74° 25' 51.451" E 32° 28' 2.099" N 244 74° 26' 23.223" E 32° 27' 57.001" N 
92 74° 25' 51.417" E 32° 28' 2.424" N 245 74° 26' 26.935" E 32° 27' 55.468" N 
93 74° 25' 51.032" E 32° 28' 2.424" N 246 74° 26' 27.225" E 32° 27' 53.399" N 
94 74° 25' 50.980" E 32° 28' 1.717" N 247 74° 26' 25.204" E 32° 27' 52.527" N 
95 74° 25' 48.508" E 32° 28' 1.594" N 248 74° 26' 25.150" E 32° 27' 51.170" N 
96 74° 25' 48.516" E 32° 28' 1.955" N 249 74° 26' 24.797" E 32° 27' 50.655" N 
97 74° 25' 46.223" E 32° 28' 1.919" N 250 74° 26' 23.411" E 32° 27' 50.710" N 
98 74° 25' 46.240" E 32° 28' 1.449" N 251 74° 26' 22.422" E 32° 27' 50.691" N 
99 74° 25' 44.632" E 32° 28' 1.399" N 252 74° 26' 22.188" E 32° 27' 48.800" N 
100 74° 25' 44.512" E 32° 28' 2.272" N 253 74° 26' 20.423" E 32° 27' 48.612" N 
101 74° 25' 43.613" E 32° 28' 2.280" N 254 74° 26' 19.674" E 32° 27' 48.127" N 
102 74° 25' 43.588" E 32° 28' 1.738" N 255 74° 26' 19.727" E 32° 27' 49.645" N 
103 74° 25' 42.609" E 32° 28' 1.723" N 256 74° 26' 18.890" E 32° 27' 49.612" N 
104 74° 25' 42.187" E 32° 28' 0.550" N 257 74° 26' 18.914" E 32° 27' 50.502" N 
105 74° 25' 41.044" E 32° 28' 0.250" N 258 74° 26' 18.444" E 32° 27' 50.503" N 
106 74° 25' 40.715" E 32° 28' 0.377" N 259 74° 26' 18.454" E 32° 27' 50.069" N 
107 74° 25' 39.504" E 32° 28' 0.943" N 260 74° 26' 18.005" E 32° 27' 50.060" N 
108 74° 25' 38.335" E 32° 28' 1.562" N 261 74° 26' 18.005" E 32° 27' 49.627" N 
109 74° 25' 40.195" E 32° 28' 1.183" N 262 74° 26' 17.492" E 32° 27' 49.681" N 
110 74° 25' 40.445" E 32° 28' 1.693" N 263 74° 26' 17.492" E 32° 27' 50.503" N 
111 74° 25' 39.907" E 32° 28' 1.978" N 264 74° 26' 16.882" E 32° 27' 50.503" N 
112 74° 25' 39.181" E 32° 28' 2.113" N 265 74° 26' 16.309" E 32° 27' 51.126" N 
113 74° 25' 38.150" E 32° 28' 2.636" N 266 74° 26' 15.655" E 32° 27' 51.535" N 
114 74° 25' 36.562" E 32° 28' 3.302" N 267 74° 26' 14.389" E 32° 27' 52.043" N 
115 74° 25' 34.714" E 32° 28' 3.094" N 268 74° 26' 14.384" E 32° 27' 52.993" N 
116 74° 25' 33.939" E 32° 28' 2.263" N 269 74° 26' 15.556" E 32° 27' 53.317" N 
117 74° 25' 33.237" E 32° 28' 1.735" N 270 74° 26' 16.765" E 32° 27' 53.742" N 
118 74° 25' 31.978" E 32° 28' 0.792" N 271 74° 26' 16.283" E 32° 27' 53.534" N 
119 74° 25' 23.486" E 32° 28' 1.169" N 272 74° 26' 16.465" E 32° 27' 54.951" N 
120 74° 25' 22.646" E 32° 28' 4.236" N 273 74° 26' 15.638" E 32° 27' 54.816" N 
121 74° 25' 21.831" E 32° 28' 8.364" N 274 74° 26' 15.716" E 32° 27' 54.229" N 
122 74° 25' 21.080" E 32° 28' 12.685" N 275 74° 26' 14.946" E 32° 27' 54.148" N 
123 74° 25' 20.363" E 32° 28' 16.852" N 276 74° 26' 14.069" E 32° 27' 56.160" N 
124 74° 25' 19.550" E 32° 28' 21.157" N 277 74° 26' 14.807" E 32° 27' 55.519" N 
125 74° 25' 18.761" E 32° 28' 24.946" N 278 74° 26' 15.545" E 32° 27' 55.610" N 
126 74° 25' 17.665" E 32° 28' 29.730" N 279 74° 26' 15.545" E 32° 27' 56.169" N 
127 74° 25' 16.461" E 32° 28' 34.495" N 280 74° 26' 16.112" E 32° 27' 56.169" N 
128 74° 25' 34.119" E 32° 27' 35.344" N 281 74° 26' 16.133" E 32° 27' 55.592" N 
129 74° 25' 33.246" E 32° 27' 37.544" N 282 74° 26' 18.166" E 32° 27' 55.781" N 
130 74° 25' 32.246" E 32° 27' 39.919" N 283 74° 26' 18.099" E 32° 27' 56.157" N 
131 74° 25' 31.222" E 32° 27' 42.299" N 284 74° 26' 18.790" E 32° 27' 56.323" N 
132 74° 25' 30.274" E 32° 27' 44.499" N 285 74° 26' 18.658" E 32° 27' 57.360" N 
133 74° 25' 29.312" E 32° 27' 46.669" N 286 74° 26' 19.203" E 32° 27' 57.351" N 
134 74° 25' 28.303" E 32° 27' 48.906" N 287 74° 26' 19.107" E 32° 27' 59.345" N 
135 74° 25' 27.151" E 32° 27' 51.461" N 288 74° 26' 19.834" E 32° 27' 59.373" N 
136 74° 25' 26.153" E 32° 27' 53.733" N 289 74° 26' 19.877" E 32° 27' 58.596" N 
137 74° 25' 25.226" E 32° 27' 55.951" N 290 74° 26' 20.209" E 32° 27' 58.651" N 
138 74° 25' 24.533" E 32° 27' 57.611" N 291 74° 26' 20.241" E 32° 27' 58.028" N 
139 74° 25' 37.962" E 32° 27' 33.558" N 292 74° 26' 20.069" E 32° 27' 57.432" N 
140 74° 25' 40.907" E 32° 27' 34.258" N 293 74° 26' 19.481" E 32° 27' 56.846" N 
141 74° 25' 43.930" E 32° 27' 34.976" N 294 74° 26' 21.631" E 32° 27' 57.117" N 
142 74° 25' 47.015" E 32° 27' 35.883" N 295 74° 26' 21.689" E 32° 27' 56.573" N 
143 74° 25' 49.109" E 32° 27' 36.554" N 296 74° 26' 22.294" E 32° 27' 56.629" N 
144 74° 25' 54.510" E 32° 27' 38.604" N 297 74° 26' 22.455" E 32° 27' 55.537" N 
145 74° 25' 57.260" E 32° 27' 39.652" N 298 74° 26' 23.197" E 32° 27' 55.040" N 
146 74° 26' 0.095" E 32° 27' 40.729" N 399 74° 26' 24.407" E 32° 27' 54.985" N 
147 74° 26' 3.593" E 32° 27' 41.982" N 300 74° 26' 24.380" E 32° 27' 53.534" N 
148 74° 26' 6.340" E 32° 27' 42.884" N 301 74° 26' 26.508" E 32° 27' 52.253" N 
149 74° 26' 9.905" E 32° 27' 43.492" N 302 74° 26' 26.786" E 32° 27' 52.993" N 
150 74° 26' 13.176" E 32° 27' 43.782" N 303 74° 26' 21.225" E 32° 27' 48.814" N 
151 74° 26' 16.599" E 32° 27' 44.012" N 304 74° 26' 24.080" E 32° 27' 50.294" N 
152 74° 26' 22.992" E 32° 27' 43.335" N 305 74° 26' 25.727" E 32° 27' 51.179" N 
153 74° 26' 25.316" E 32° 27' 43.638" N 306 74° 26' 25.717" E 32° 27' 50.664" N] 
 
47
[F. Potohar Site (both sides) adjacent to Islamabad International 
Airport along M -14 (99241.61 Kanals approximately i.e. 12405.20 
acres) 
(i) Boundary References: 
Datum and Spheroid  World Geodetic System 1984 (WGS 84) 
Coordinate System Universal Transverse Mercator 43N 
 
Boundary Reference Points ID Longitude Latitude 
North 
N1/W4 72° 43' 15.893" E 33° 34' 41.604" N 
N2 72° 44' 24.489" E 33° 35' 1.769" N 
N3 72° 46' 6.611" E 33° 35' 38.042" N 
N4 72° 47' 26.059" E 33° 35' 53.960" N 
N5/E1 72° 49' 20.742" E 33° 35' 43.511" N 
East 
 
N5/E1 72° 49' 20.742" E 33° 35' 43.511" N 
E2 72° 49' 4.994" E 33° 35' 12.263" N 
E3 72° 48' 58.874" E 33° 34' 6.743" N 
E4 72° 47' 48.063" E 33° 33' 29.714" N 
E5 72° 47' 49.483" E 33° 32' 57.904" N 
E6/S1 72° 47' 47.871" E 33° 31' 51.798" N 
South 
 
E6/S1 72° 47' 47.871" E 33° 31' 51.798" N 
S2 72° 46' 42.140" E 33° 31' 17.286" N 
S3 72° 45' 48.340" E 33° 31' 44.206" N 
S4 72° 45' 9.147" E 33° 32' 4.181" N 
S5/W1 72° 44' 11.409" E 33° 32' 11.193" N 
West 
 
S5/W1 72° 44' 11.409" E 33° 32' 11.193" N 
W2 72° 43' 35.089" E 33° 33' 23.097" N 
W3 72° 43' 39.411" E 33° 33' 50.645" N 
N1/W4 72° 43' 15.893" E 33° 34' 41.604" N 
 
                                                      
47 Inserted by the Notification No.SO(H-II)3-3/2021( (P-III) dated: 08 -01-2026  vide  Gazette notification no.08 of 2026, 
published in the Punjab Gazette (Extraordinary), dated: 27 January 2026, pp, 4001-4012. 
(ii) Boundary Description: 
NORTH: 
The northern boundary of jurisdiction start from the reference point 
N1/W4 (72° 43' 15.893"E, 33° 34' 41.604"N) near Madina Protein 
Farms, where it moves towards the eastern side which  passes 
through the reference point N2 (72° 44' 24.489"E, 33° 35' 1.769"N) 
along Sukha Kas and to the  reference point N3 (72° 46' 6.611"E, 33° 
35' 38.042"N) crossing Fateh Jang -Girja Road towards east,  where it 
passes alongside sector  towards the reference point N4 (72° 47' 
26.059"E, 33° 35' 53.960"N) on the Rawalpindi -Jand Kohat Road  
where it finally end at the reference point N5/E1  (72° 49' 20.742"E, 
33° 35' 43.511"N) besides Mian Cattle Farms. 
EAST: 
The eastern boundary start from the reference point N5/E1 (72° 49' 
20.742"E, 33° 35' 43.511"N) near Mian  Cattle farms, where it moves  
towards the southern side to the reference point E2 (72°49'4.994"E,  
33°35'12.263"N) at Dr. Yasir’s Farms and then it moves towards the 
reference point E3 (72°48'58.874"E, 33°34'6.743"N) near Rama Dam 
and then moves along the boundary wall of Islamabad International 
Airport to the reference  point E4 (72°47'48.063"E, 33°33'29.714"N) 
which further moves towards the reference point E5  
(72°47'49.483"E, 33°32'57.904"N) at ASF Camp Mosque which ends 
at the reference point E6/S1 (72°47 '47.871"E, 33°31'51.798"N) near 
Dhoke Manewali. 
SOUTH: 
The southern boundary start from the reference point S1/E6 
(72°47'47.871"E, 33°31'51.798"N) where it moves to west towards 
Dulatpur at   the reference point S2 (72°46'42.140"E, 
33°31'17.286"N) which end s at the reference  point S3 
(72°45'48.340"E, 33°31'44.206"N) near Bonga which further extends 
to the reference point S4 (72° 45' 9.147" E, 33° 32' 4.181" N) by  
passing the settlement of Bonga and ends at the reference point 
S5/W1 (72° 44' 11.409"E, 33° 32' 11.193"N). 
WEST: 
The western boundary start from the  reference point S5/ W1 (72° 44' 
11.409"E, 33° 32' 11.193"N) where  it passes through the reference 
point W2  (72° 43' 35.089"E, 33° 33' 23.097"N) at M14 further it 
moves in the northern direction along water stream to the reference 
point W3  (72° 43' 39.411"E, 33° 33' 50.645"N)  and ends at the 
reference point  N1/ W4 (72° 43' 15.893"E, 33° 34' 41.604"N)  near 
Madina Protein Farms. 
 
(iii) Boundary Map: 
 

 
(iv) Boundary Coordinates: 
ID Longitude Latitude ID Longitude Latitude 
1 72° 48' 38.374" E 33° 35' 52.963" N 60 72° 43' 20.004" E 33° 34' 40.634" N 
2 72° 47' 57.979" E 33° 35' 53.987" N 61 72° 43' 13.285" E 33° 34' 39.358" N 
3 72° 47' 51.769" E 33° 35' 53.267" N 62 72° 43' 3.554" E 33° 34' 29.044" N 
4 72° 47' 38.613" E 33° 35' 56.126" N 63 72° 43' 2.637" E 33° 34' 12.493" N 
5 72° 47' 28.344" E 33° 35' 17.303" N 64 72° 43' 5.161" E 33° 34' 7.060" N 
6 72° 46' 44.194" E 33° 35' 11.644" N 65 72° 43' 11.667" E 33° 34' 7.021" N 
7 72° 46' 27.695" E 33° 35' 13.233" N 66 72° 43' 12.688" E 33° 34' 0.161" N 
8 72° 46' 14.161" E 33° 35' 21.659" N 67 72° 43' 7.437" E 33° 34' 1.538" N 
9 72° 45' 52.631" E 33° 35' 40.203" N 68 72° 43' 6.157" E 33° 33' 57.278" N 
10 72° 45' 48.132" E 33° 35' 36.660" N 69 72° 43' 10.659" E 33° 33' 53.384" N 
11 72° 45' 43.242" E 33° 35' 35.298" N 70 72° 43' 14.932" E 33° 33' 55.392" N 
12 72° 45' 40.893" E 33° 35' 30.130" N 71 72° 43' 25.652" E 33° 33' 49.842" N 
13 72° 45' 36.208" E 33° 35' 30.036" N 72 72° 43' 27.354" E 33° 33' 48.505" N 
14 72° 45' 35.590" E 33° 35' 27.045" N 73 72° 43' 29.187" E 33° 33' 46.241" N 
15 72° 45' 31.213" E 33° 35' 25.221" N 74 72° 43' 33.934" E 33° 33' 50.442" N 
16 72° 45' 35.332" E 33° 35' 22.349" N 75 72° 43' 43.165" E 33° 33' 45.831" N 
17 72° 45' 32.100" E 33° 35' 18.862" N 76 72° 43' 39.725" E 33° 33' 42.734" N 
18 72° 45' 26.949" E 33° 35' 15.858" N 77 72° 43' 45.872" E 33° 33' 39.970" N 
19 72° 45' 13.637" E 33° 35' 17.527" N 78 72° 43' 46.451" E 33° 33' 35.268" N 
20 72° 45' 8.579" E 33° 35' 16.301" N 79 72° 43' 53.189" E 33° 33' 34.706" N 
21 72° 45' 4.714" E 33° 35' 17.433" N 80 72° 43' 49.125" E 33° 33' 29.388" N 
22 72° 45' 4.407" E 33° 35' 12.987" N 81 72° 43' 42.928" E 33° 33' 8.748" N 
23 72° 44' 59.394" E 33° 35' 5.640" N 82 72° 43' 55.011" E 33° 32' 58.954" N 
24 72° 44' 58.671" E 33° 35' 8.957" N 83 72° 44' 0.380" E 33° 32' 56.844" N 
25 72° 44' 51.933" E 33° 35' 7.884" N 84 72° 44' 15.769" E 33° 32' 42.621" N 
26 72° 44' 50.051" E 33° 35' 10.238" N 85 72° 44' 20.025" E 33° 32' 38.709" N 
27 72° 44' 47.223" E 33° 35' 10.368" N 86 72° 44' 26.258" E 33° 32' 30.332" N 
 
28 72° 44' 43.613" E 33° 35' 10.516" N 87 72° 44' 30.989" E 33° 32' 28.640" N 
29 72° 44' 43.096" E 33° 35' 6.214" N 88 72° 44' 30.478" E 33° 32' 26.039" N 
30 72° 44' 40.707" E 33° 35' 3.836" N 89 72° 44' 25.986" E 33° 32' 23.088" N 
31 72° 44' 34.511" E 33° 34' 58.234" N 90 72° 44' 55.253" E 33° 31' 59.951" N 
32 72° 44' 30.504" E 33° 34' 58.842" N 91 72° 45' 19.695" E 33° 32' 8.297" N 
33 72° 44' 24.741" E 33° 34' 56.928" N 92 72° 45' 24.577" E 33° 32' 3.599" N 
34 72° 44' 20.341" E 33° 34' 59.015" N 93 72° 45' 35.656" E 33° 32' 4.515" N 
35 72° 44' 13.245" E 33° 34' 58.155" N 94 72° 45' 44.413" E 33° 32' 3.092" N 
36 72° 44' 9.275" E 33° 34' 55.862" N 95 72° 45' 48.834" E 33° 32' 4.106" N 
37 72° 44' 3.641" E 33° 34' 55.042" N 96 72° 45' 54.646" E 33° 31' 54.197" N 
38 72° 43' 59.953" E 33° 34' 56.204" N 97 72° 45' 54.750" E 33° 31' 39.705" N 
39 72° 43' 58.567" E 33° 34' 53.265" N 98 72° 45' 58.467" E 33° 31' 36.989" N 
40 72° 43' 49.502" E 33° 34' 52.864" N 99 72° 46' 9.621" E 33° 31' 31.861" N 
41 72° 43' 49.775" E 33° 34' 50.443" N 100 72° 46' 24.557" E 33° 31' 21.965" N 
42 72° 43' 45.891" E 33° 34' 49.754" N 101 72° 46' 54.119" E 33° 31' 22.479" N 
43 72° 43' 43.962" E 33° 34' 47.586" N 102 72° 47' 4.501" E 33° 31' 28.298" N 
44 72° 43' 40.161" E 33° 34' 47.462" N 103 72° 47' 11.249" E 33° 31' 30.234" N 
45 72° 43' 38.201" E 33° 34' 49.743" N 104 72° 47' 46.349" E 33° 32' 44.867" N 
46 72° 43' 37.554" E 33° 34' 46.689" N 105 72° 47' 27.863" E 33° 33' 2.209" N 
47 72° 43' 35.541" E 33° 34' 44.857" N 106 72° 47' 31.001" E 33° 33' 23.985" N 
48 72° 43' 31.124" E 33° 34' 43.064" N 107 72° 47' 46.412" E 33° 33' 21.603" N 
49 72° 43' 31.745" E 33° 34' 45.052" N 108 72° 48' 59.500" E 33° 33' 19.178" N 
50 72° 43' 32.668" E 33° 34' 46.621" N 109 72° 49' 19.109" E 33° 33' 27.641" N 
51 72° 43' 33.187" E 33° 34' 52.059" N 110 72° 49' 22.412" E 33° 33' 41.065" N 
52 72° 43' 31.518" E 33° 34' 50.406" N 111 72° 49' 22.620" E 33° 33' 53.797" N 
53 72° 43' 27.082" E 33° 34' 49.688" N 112 72° 49' 17.234" E 33° 33' 59.183" N 
54 72° 43' 24.830" E 33° 34' 48.957" N 113 72° 49' 6.434" E 33° 34' 0.983" N 
55 72° 43' 22.107" E 33° 34' 47.656" N 114 72° 49' 15.434" E 33° 34' 39.143" N 
56 72° 43' 23.300" E 33° 34' 43.942" N 115 72° 49' 16.154" E 33° 34' 51.023" N 
 
57 72° 43' 23.011" E 33° 34' 41.083" N 116 72° 49' 12.914" E 33° 35' 23.783" N 
58 72° 43' 24.020" E 33° 34' 37.230" N 117 72° 49' 18.674" E 33° 35' 34.943" N 
59 72° 43' 16.772" E 33° 34' 35.285" N]    
 
G. Potohar Site near Hassan Abdal  situated at junction of M -1 (Islamabad-
Peshawar Motorway) and M -15 corridor (2824.60 Kanals approximately i.e. 
353.08 acres) 
(i) Boundary References: 
Datum and Spheroid  World Geodetic System 1984 (WGS 84) 
Coordinate System Universal Transverse Mercator 43N 
  
Boundary Reference Point Longitude Latitude 
North 
 
N1/W7 72° 37' 7.949" E 33° 51' 36.321" N 
N2 72° 37' 22.497" E 33° 51' 50.048" N 
N3/E1 72° 37' 36.89" E 33° 51' 35.25" N 
East 
 
N3/E1 72° 37' 36.89" E 33° 51' 35.25" N 
E2 72° 37' 51.286" E 33° 51' 20.452" N 
E3/S1 72° 37' 24.236" E 33° 51' 1.277" N 
South 
 
E3/S1 72° 37' 24.236" E 33° 51' 1.277" N 
S2 72° 37' 11.650" E 33° 50' 58.321" N 
S3/W1 72° 36' 45.714" E 33° 51' 8.272" N 
West 
 
S3/W1 72° 36' 45.714" E 33° 51' 8.272" N 
W2 72° 36' 45.883" E 33° 51' 11.648" N 
W3 72° 36' 42.694" E 33° 51' 15.806" N 
W4 72° 36' 47.726" E 33° 51' 16.483" N 
W5 72° 36' 52.323" E 33° 51' 21.105" N 
W6 72° 36' 52.425" E 33° 51' 27.386" N 
N1/W7 72° 37' 7.949" E 33° 51' 36.321" N 
 
  
 
(ii) Boundary Description: 
NORTH:  
The northern boundary of jurisdiction start from the reference point N1/W7 
(72° 37' 7.949"E, 33° 51' 36.321"N) near Aab -e-Sifa Road and moves to the 
north most to the reference point N2 (72° 37' 22.497"E, 33° 51' 50.048"N) 
near Aab-e-Shifa Chasma. It further moves in south -eastern direction upto 
the end to the reference point N3/E1(72° 37' 36.89"E, 33° 51' 35.25"N) near 
Allah Tawakal Book Depot. 
EAST: 
The eastern boundary start from the reference point N3/ E1 (72° 37' 36.89"E, 
33° 51' 35 .25"N) and moves further in south -eastern direction to the east 
most reference point E2 (72° 37' 51.286"E, 33° 51' 20.452"N) located near 
M-15 corridor and moves parallel to M-15 up to the end to the reference point 
E3/S1 (72° 37' 24.236"E, 33° 51' 1.277"N).  
SOUTH: 
The southern boundary start from the reference  point E3/S1 (72° 37' 
24.236"E, 33° 51' 1.277"N) moving parallel to the exit road of M -1 (towards 
M-15) and reach to the reference point S2 (72° 37' 11.650"E, 33° 50' 
58.321"N) and further extends to  the end to the reference point S3/W1 (72° 
36' 45.714"E, 33° 51' 8.272"N) moving parallel to M-1. 
WEST:  
The western boundary start from the reference  point S3/W1 ( 72° 36' 
45.714"E, 33° 51' 8.272"N ) outlining the western edge of the site and 
reflecting natural terrain and access routes, and passes through the reference 
points W2 (72° 36' 45.883"E, 33° 51' 11.648"N ), W3 (72° 36' 42.694"E, 33° 
51' 15.806"N ), W4 ( 72° 36' 47.726"E, 33° 51' 16.483"N ), W5 ( 72° 36' 
52.323"E, 33° 51' 21.105"N ), towards the referenc e point W6 (72° 36' 
52.425"E, 33° 51' 27.386"N), from where the boundary closes the loop by 
heading northeast returning to the reference point N1/W7 (72° 37' 7.949"E, 
33° 51' 36.321"N). 
(iii) Boundary Map: 
 

 
(iv) Boundary Coordinates: 
ID Longitude Latitude ID Longitude Latitude 
1 72° 37' 50.076" E 33° 51' 19.649" N 29 72° 36' 57.306" E 33° 51' 13.388" N 
2 72° 37' 44.618" E 33° 51' 16.025" N 30 72° 36' 56.584" E 33° 51' 15.900" N 
3 72° 37' 43.869" E 33° 51' 15.529" N 31 72° 36' 56.199" E 33° 51' 17.238" N 
4 72° 37' 41.774" E 33° 51' 14.143" N 32 72° 36' 56.093" E 33° 51' 17.543" N 
5 72° 37' 31.771" E 33° 51' 6.804" N 33 72° 36' 54.733" E 33° 51' 18.366" N 
6 72° 37' 24.236" E 33° 51' 1.277" N 34 72° 36' 54.194" E 33° 51' 18.692" N 
7 72° 37' 16.537" E 33° 50' 58.810" N 35 72° 36' 53.488" E 33° 51' 20.302" N 
8 72° 37' 2.818" E 33° 51' 2.997" N 36 72° 36' 52.502" E 33° 51' 21.858" N 
9 72° 37' 2.798" E 33° 51' 3.007" N 37 72° 36' 52.482" E 33° 51' 23.053" N 
10 72° 37' 2.752" E 33° 51' 3.025" N 38 72° 36' 52.322" E 33° 51' 23.454" N 
11 72° 36' 45.877" E 33° 51' 8.253" N 39 72° 36' 53.033" E 33° 51' 23.543" N 
12 72° 36' 45.867" E 33° 51' 8.256" N 40 72° 36' 52.823" E 33° 51' 24.504" N 
13 72° 36' 45.808" E 33° 51' 8.268" N 41 72° 36' 52.562" E 33° 51' 26.105" N 
14 72° 36' 45.746" E 33° 51' 8.271" N 42 72° 36' 52.466" E 33° 51' 26.693" N 
15 72° 36' 45.720" E 33° 51' 8.269" N 43 72° 36' 55.434" E 33° 51' 29.118" N 
16 72° 36' 45.441" E 33° 51' 10.148" N 44 72° 37' 7.949" E 33° 51' 36.321" N 
17 72° 36' 45.670" E 33° 51' 11.368"N 45 72° 37' 9.515" E 33° 51' 37.338" N 
18 72° 36' 44.584" E 33° 51' 12.855" N 46 72° 37' 11.068" E 33° 51' 38.375" N 
19 72° 36' 44.487" E 33° 51' 13.007" N 47 72° 37' 12.608" E 33° 51' 39.432" N 
20 72° 36' 47.009" E 33° 51' 16.141" N 48 72° 37' 14.134" E 33° 51' 40.508" N 
21 72° 36' 48.796" E 33° 51' 15.261" N 49 72° 37' 17.145" E 33° 51' 42.718" N 
22 72° 36' 49.522" E 33° 51' 14.432" N 50 72° 37' 18.628" E 33° 51' 43.851" N 
23 72° 36' 52.308" E 33° 51' 14.539" N 51 72° 37' 19.241" E 33° 51' 44.698" N 
 
 
 
24 72° 36' 53.261" E 33° 51' 14.288" N 52 72° 37' 19.834" E 33° 51' 45.558" N 
25 72° 36' 53.135" E 33° 51' 12.720" N 53 72° 37' 20.407" E 33° 51' 46.431" N 
26 72° 36' 54.057" E 33° 51' 12.275" N 54 72° 37' 20.960" E 33° 51' 47.317" N 
27 72° 36' 55.344" E 33° 51' 12.038" N 55 72° 37' 21.493" E 33° 51' 48.216" N 
28 72° 36' 56.284" E 33° 51' 12.198" N 56 72° 37' 22.005" E 33° 51' 49.126" N] 
 
 
48[SECOND SCHEDULE] 
(See section 56) 
 
Part- A 
1. Discharging any dangerous chemical, inflammable, hazardous or offensive 
article in any drain, or sewer, public water course or public land vested in, 
managed, or controlled by Authority or an Agency of the Authority in such 
manner as causes or is likely to cause dange r to persons passing by or living 
or working in neighborhood, or risk or injury to property or causing harm to the 
environment. 
2. Failure of commercial concern and occupier of a property to provide adequate 
and safe disposal of affluent or prevention of their mixing up with the water 
supply or sewerage system. 
Part-B 
1. Willfully obstructing any officer or servant of Authority or any person 
authorized to exercise power conferred under this Act. 
2. Failure to deliver back possession of property to the Auth ority on expiration 
and cancellation of lease or allotment or exemption of plot. 
3. Doing an act without approval or permission when the doing of such act 
requires an approval or permission under any of the provisions of this Act, the 
rules or regulations. 
4. Violation of the Master Plan, building plan or sanctioned site or development 
scheme as determined by the Authority or any officer authorized on its behalf. 
5. Erection or re -erection of building over set back area or parking area or 
building line area  required to be left open under the rules or bylaws for using 
such space for any purpose which is not approved. 
6. Changing or converting into any other use any portion of a commercial or 
residential building or area specified or earmarked for public parki ng or 
amenities. 
                                                      
48Renamed by the Lahore Central Business District Development Authority (Amendment) Act 2022 (XVIII of 2022), published in 
the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.28. 
 
 
 
7. Establishing any parking stand on any property or on any open space and 
public park or land vested in or managed, maintained or controlled by the 
Authority or an Agency. 
8. Establishing temporary shops or running any restaurant or vendi ng stalls for 
eatables, wooden Khokas or any sort of commercial activity on any road, 
street, footpath, public place, over a drain, or any other property vesting in the 
Authority. 
9. Obstructing or tampering with any road, street, drain or sewer pine or 
pavement or tampering with any main pipe, meter or any apparatus or 
appliance for the supply of water or sewerage system or laying out a drain or 
altering any drain in a street or road. 
10.  Connecting any house drain with a drain in a public street without approval of 
the Authority. 
11.  Drawing off, diverting or taking any water except with the permission required 
under this Act, rules or regulations. 
12.  Willfully causing damage, or allowing damage to be caused to any property 
which vests in the Authority , or which is intended to be acquired by the 
Authority, or unlawfully converting it to his own or any other person's use. 
13.  Refusal or willfully neglecting to provide any officer or servant of the Authority 
with the means necessary for entering into any  premises for the purpose of 
collecting any information or making an examination or enquiry in relation to 
any water works. 
14.  Failure or neglect of the sponsor to abide by or fulfill the commitment made to 
a person regarding allotment of a plot, housing unit or price of the same in any 
scheme.

Original source pages: graphics and forms

These 7 complete source pages supplement the reading text above. Graphic, form or scanned material on these pages is not fully represented by the searchable transcription. Read the original page images for that material; no verified OCR transcription is claimed.

The full original PDF contains 55 pages. Physical source page numbers below refer to that PDF.

Original PDF page 26 of 55Open full-resolution pageView physical PDF page 26Next source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 26
Original PDF page 28 of 55Open full-resolution pageView physical PDF page 28Previous source pageNext source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 28
Original PDF page 30 of 55Open full-resolution pageView physical PDF page 30Previous source pageNext source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 30
Original PDF page 36 of 55Open full-resolution pageView physical PDF page 36Previous source pageNext source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 36
Original PDF page 41 of 55Open full-resolution pageView physical PDF page 41Previous source pageNext source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 41
Original PDF page 47 of 55Open full-resolution pageView physical PDF page 47Previous source pageNext source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 47
Original PDF page 52 of 55Open full-resolution pageView physical PDF page 52Previous source page
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 — complete original PDF page 52
Original source and image integrity

Official original PDF source. Source PDF SHA-256: ccc8d3c9948cc432c2a0101810d246ca6f9134f805c97fb6a5ae114f31cb4df1.

Each selected page is rendered in full without clipping. The original file and every page image are hashed. The source-page review identifies graphic or form material; it does not establish a complete OCR transcription, amendment completeness or current force.

  1. Physical PDF page 26: 32564510ae139b9372378f11d92ef2873ce3017af1ac9f67027f326329660a91
  2. Physical PDF page 28: b2ffcd47bc1676026b59844a44342da15aee335babfe57ba1e9844cf193135b9
  3. Physical PDF page 30: ac0092b632b247d6ae86c5d30bddb4a988b25d145a3322f91c6537ab1ac35f76
  4. Physical PDF page 36: dce484bf401977783cf8d18a1a4ce5fa603666807dd08b7b10c9a57867f2f195
  5. Physical PDF page 41: a97622db8905979111cfa99fb75a07c514a38c252574bd410166221e1304555b
  6. Physical PDF page 47: 3093e5fe09776db9b001dc0d3a7b59247367b4452b1668ff9482e8afe23e9073
  7. Physical PDF page 52: d673c2de852ecd160f7865bbdad2571605ad29357d455d0317506a3ba75b3230
LAW LIBRARY MAP

This law in the library

Follow the instruments and provisions named in this source edition, and the laws that cite it. Citation links identify the text being referred to; legal effect and current force require separate examination.

10 citations to other instruments0 citations from other laws9 internal provision references2 explicit external provision references
Instruments cited by this law 7
References to provisions in this text 9

Section 2(b)

Open the identified operative provision

Read reference in context
rules 53. Power to frame regulations 54. Municipal and local government functions 55. Penalty 56. Offences and cognizance 57. Repeal FIRST SCHEDULE [See section 2(b)] SECOND SCHEDULE (See section 56) TEXT 1 THE PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 (VI of 2021) [17 May 2021] An Act to establish 2[Punjab] Central Business District

Read the source passage

Section 56

Open the identified operative provision

Read reference in context
4. Municipal and local government functions 55. Penalty 56. Offences and cognizance 57. Repeal FIRST SCHEDULE [See section 2(b)] SECOND SCHEDULE (See section 56) TEXT 1 THE PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021 (VI of 2021) [17 May 2021] An Act to establish 2[Punjab] Central Business District Development Authority. It is necessar

Read the source passage

Section 4

Open the identified operative provision

Read reference in context
ns the area of the Authority as specified in the FIRST SCHEDULE]; (c) “Authority” means 8[Punjab] Central Business District Development Authority constituted under section 4 of this Act; 1This Act was passed by Provincial Assembly of the Punjab on 17 May 2021; assented to by the Governor of the Punjab on 17 May 2021; and, was published in th

Read the source passage

Section 5

Open the identified operative provision

Read reference in context
2022), published in the Punjab Gazette (Extraordinary), dated: 14 September 2022, pp, 687-697, s.3. (d) “Board” means th e Board of the Authority established under section 5 of this Act; (e) “CEO” means Chief Executive Officer of the Authority appointed under section 10 of this Act; (f) “Chairman” means the Chairman of the Board; (g) “Collector” means Land Acquisition Collector under the Lan

Read the source passage

Section 10

Open the identified operative provision

Read reference in context
(d) “Board” means th e Board of the Authority established under section 5 of this Act; (e) “CEO” means Chief Executive Officer of the Authority appointed under section 10 of this Act; (f) “Chairman” means the Chairman of the Board; (g) “Collector” means Land Acquisition Collector under the Land Acquisition Act, 1894 (I of 1894); (h) “compensation” means the compensation given under this Ac

Read the source passage

Section 8

Open the identified operative provision

Read reference in context
ual vacancy, a member other than the Chairman shall be nominated by the Government for the remaining term of the outgoing member. (4) Subject to subsection (4) of section 8, no act or proceeding of the Board shall be invalid merely by reason of any vacancy or defect in the constitution of the Board.] 6. Disqualifications of members.– (1) No person shall be, or shall continue to be a member w

Read the source passage

Section 20

Open the identified operative provision

Read reference in context
ny disagreement, as may be determined by the Government. 21. Power to execute schemes. – (1) Where the Authority is satisfied th at any direction given by it under section 20 with regard to any scheme, has not been carried out by the Government agency, the Authority may, itself, undertake any work for the execution of that scheme and the cost thereof shall be borne as may be agreed between the A

Read the source passage

Section 2(b)

Open the identified operative provision

Read reference in context
the Authority. 57. Repeal.– The Lahore Central Business District Development Authority Ordinance 2021 (IV of 2021) is hereby repealed. 43FIRST SCHEDULE [See section 2(b)] Area of the Authority 1. Lahore: A. Walton Airport and Bab-e-Pakistan (3128 kanals approximately) having the following details: (i) Boundary references: Datum and Spheroid World Geodetic System 1984 (WGS 8

Read the source passage

Section 56

Open the identified operative provision

Read reference in context
51' 12.038" N 55 72° 37' 21.493" E 33° 51' 48.216" N 28 72° 36' 56.284" E 33° 51' 12.198" N 56 72° 37' 22.005" E 33° 51' 49.126" N] 48[SECOND SCHEDULE] (See section 56) Part- A 1. Discharging any dangerous chemical, inflammable, hazardous or offensive article in any drain, or sewer, public water course or public land vested in, managed, or controlled by Authority or an Agency of the

Read the source passage

Provisions explicitly cited in other instruments 2

Section 21 of Pakistan Penal Code, 1860

Cited by PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021

The named instrument matches multiple source editions; no edition is selected.

Read source and target evidence

Explicit source reference

neral shall, when acting or purporting to act under this Act in pursuance of any of the provisions of this Act, be deemed to be public servants within the meaning of section 21 of the Pakistan Penal Code, 1860 (XLV of 1860). 47. Immunity.– No suit, prosecution or any other legal proceedings shall lie against the Authority, CEO, any member, officer, servant, expert or consultant of the Authority or the Director General, in resp

Read the source passage

Section 2 of Local Authorities Loans Ordinance, 1914

Cited by PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021

The named instrument has not been matched in this library.

Read source and target evidence

Explicit source reference

a „Local Authority‟ for the purpose of borrowing money and any scheme or project prepared or undertaken by the Authority shall be deemed to be “work” as defined in section 2 of the Local Authorities Loans Ordinance, 1914 (IX of 1914). 30Omitted by the Lahore Central Business District Development Authority (Amendment) Ac t 2022 (XVIII of 2022), published in the Punjab Gazette (Extraordina

Read the source passage

Cited instruments not matched in this library 6

Explore this law in the whole-library map · Download this law’s relationship evidence · Download preserved source record

Original-source comparison

Read the original graphic and form pages retained with this law. Their visual content is separate from the text comparison below.

Original-source character comparison matched under the recorded normalization

Open the compared original source

Source comparison checks the identified transcription and edition. The law's current force, later amendments and territorial application require separate legal review.

Comparison evidence
Stored text SHA-256
25c5c044a43bdc8500a94427b81f2476d3acc64cb7798cfc3d540c029dd005a1
Original source SHA-256
ccc8d3c9948cc432c2a0101810d246ca6f9134f805c97fb6a5ae114f31cb4df1
Comparison method
Complete exact non-whitespace character stream after NFKC, quotation-mark equivalents and soft-hyphen removal. Word boundaries and PDF line-layout differences remain separately described.

Download the library source-comparison register

View the recorded official source
Source, version and text details
Recorded title
PUNJAB CENTRAL BUSINESS DISTRICT DEVELOPMENT AUTHORITY ACT 2021
Source collection
Punjab — this does not establish territorial applicability.
Recorded version
Not supplied in this record
Source snapshot
2026-08-06T16:52:30Z
Legal status
not independently verified
Text quality
Complete stored UTF-8 TXT file recovered byte-for-byte from owned Drive. Source transcription retained verbatim; legal completeness, OCR accuracy and current consolidation unverified.
Recorded quality flags
No additional flags recorded
Stable record
punjab-code-cdc4fd60ddc66655
Content extent
Legal completeness not independently established
Integrity scope
Stored UTF-8 text and TXT download bytes checked against their recorded hash. This does not establish legal authenticity or currency.
Passage offsets
zero-based Unicode code points and UTF8 bytes; end exclusive
Stored text SHA-256
25c5c044a43bdc8500a94427b81f2476d3acc64cb7798cfc3d540c029dd005a1

Law, understood
in its full context.

Evolutionary

Examine institutional development, adaptation and correction.