THE PUNJAB FLOOD PLAIN REGULATION ACT 2016 (XXVII of 2016)

TEXT

1THE PUNJAB FLOOD PLAIN REGULATION ACT 2016 (XXVII of 2016) [20th April 2016] An Act to regulate construction in the flood plains in the Punjab. It is necessary to regulate construction in flood plains for flood mitigation and development of water resources; and, to deal with ancillary matters; Be it enacted by Provincial Assembly of the Punjab as follows:

Section 1. Short title, commencement and extent

(1) This Act may be cited as the Punjab Flood Plain Regulation Act 2016.

(2) It shall come into force at once.

(3) It extends to whole of the Punjab.

Section 2. Definitions

In this Act:

(a) “breaching section” means the section of a flood embankment or other flood protection work which is designated for effecting a controlled breach to release a part of flood under specified conditions;

(b) “Canal Officer” means a Canal Officer appointed under the Act;

(c) “Chief Engineer” means the Chief Engineer of the Irrigation Zone commanding the relevant river reach;

(d) “committee” means a construction approval committee constituted under the Act;

(e) “construction” means any excavation, clearing, laying of utility lines, road or rail line, construction of a bridge or any other physical structure;

(f) “flood plain” means the land notified in the official Gazette as flood plain under section 3 of the Act;

(g) “Government” means Government of the Punjab;

1This Act was passed by the Punjab Assembly on 14 April 2016; assented to by the Governor of the Punjab on 19 April 2016; and, was published in the Punjab Gazette (Extraordinary), dated 20 April 2016, pages 4663-66.

(h) “land” includes the land of any tenure and land submerged in water;

(i) “pond area” means the area which is prone to flooding owing to back water effect of a dam or barrage;

(j) “prescribed” means prescribed by the rules made under the Act; and

(k) “river” includes a stream, nallah, hill torrent and any other natural water course conveying run-off from rain, snow melt or both.

Section 3. Authority to designate flood plain

(1) The Government may, by notification in the official Gazette, containing detail specifications of the land, declare any land as flood plain if the land falls under any of the following categories:

(a) natural course of a river, area of a lake or wetland;

(b) low plain which is adjacent to a river and is likely to flooding;

(c) area which is likely to be inundated due to the operation of a breaching section;

(d) pond area of a barrage or dam; and

(e) area likely to be used for construction of a dam or a barrage.

(2) The Government may, by notification in the official Gazette, revise the extent of a flood plain at such intervals as may be prescribed.

Section 4. Responsibility of Canal Officers

(1) The Government shall appoint Canal Officer not below basic scale 18 for the performance of one or more functions under this

Act.

(2) A Canal Officer shall have jurisdiction over such part of the flood plain as may be specified by the Government.

(3) Where a Canal Officer is on leave or he is absent from duty, a Canal Officer immediately superior to him shall be responsible for his assigned work.

Section 5. Construction in the flood plain

(1) Subject to subsection (2), the Government may, by notification in the official Gazette, declare that a person shall not undertake any type of construction in a flood plain without prior permission in writing of the Canal Officer.

(2) The Government may, by notification in the official Gazette, prohibit any particular type of construction in a flood plain.

Section 6. Application for permission

(1) A person may make an application for permission to construct in a flood plain to the Canal Officer in the prescribed manner.

(2) If an existing construction on a flood plain is an illegal construction under any law, the Government may, by notification in the official Gazette, require that the occupant of any category of such construction shall, within ninety days of the commencement of this Act, seek permission of the Canal Officer under the Act.

(3) The Canal Officer shall, without undue delay but within the time fixed by the Government, endorse his opinion on the application and submit it to the committee.

Section 7. Construction approval committee

(1) The Government may, by notification in the official Gazette, constitute one or more committees headed by Superintending Engineer consisting of such Canal Officers, other officials and experts in the relevant fields as it deems appropriate, to consider applications for permission to construct in a flood plain.

(2) The committee may, for reasons to be recorded, either rejects the application or grant permission subject to such conditions and restrictions as it may deem fit to achieve the objectives of this Act.

(3) While granting a permission to construct in a flood plain, the committee shall, among other things, consider the following matters:

(a) the obstruction that the construction is likely to cause to the flow and its flood related impact;

(b) the pressing need for such construction;

(c) the safety of the construction and its impact on safety of other constructions or related areas; and

(d) the opinion of the Canal Officer on the application for permission to construct in the flood plain.

(4) The committee shall decide the application within such time as may be prescribed or specified by the Government and convey its decision to the Canal Officer without unnecessary delay.

Section 8. Formal permission to construct

(1) The Canal Officer shall, in accordance with the decision of the committee and within forty five days of receipt of application, accept or reject the application for permission to construct in writing and convey it to the applicant.

(2) The Canal Officer shall keep complete record of all applications for permission to construct in a flood plain, proceedings on the applications and decision of the committee on the applications in the prescribed manner.

Section 9. Public authorities

This Act applies to public authorities including the Federal Government, a Provincial Government or a local government and a public authority

shall not finance or undertake any construction in the flood plain without the prior written permission of the Canal Officer.

Section 10. Special building code

Notwithstanding anything in any other law, the Government may prescribe special building code for construction in a flood plain in view of their particular requirements of the flood plain.

Section 11. Flood plain surveys

Each year in October or at such other time as the Government may specify, the Canal Officer shall carryout survey of the flood plain and submit report to the Government mentioning constructions required to be notified under section 5 of this Act.

Section 12. Removal of unauthorized construction

(1) Where a construction is undertaken otherwise than in accordance with the provisions of this Act, the Canal Officer may order its removal and cause it to be removed.

(2) For purposes of subsection (1), if considered necessary, a Canal Officer may request assistance from the District Collector, local police or an authority of the local government.

(3) The District Collector, local police or the local government shall render the assistance to the Canal Officer and shall, in case of inability to render immediate assistance, inform the Canal Officer in writing within three days of the request.

Section 13. Power to arrest

(1) If a person resists removal of unauthorized construction or assaults or threatens any person acting under the order of the Canal Officer, the person may be arrested.

(2) Where a person is arrested by a person other than a police officer under this Act, he shall immediately be handed over to the nearest police station.

Section 14. Offence

(1) A person who undertakes construction or commissions a construction in violation of the provisions of this Act shall be guilty of an offence punishable with imprisonment which may extend to thirty days and fine which may extend to two hundred thousand rupees.

(2) If a person occupies an illegal construction after ninety days of the commencement of the Act, he shall be guilty of an offence punishable with fine which may extend to one hundred thousand rupees.

Section 15. Review Board

(1) The Government shall constitute a Review Board headed by Chief Engineer and comprising such Canal Officers, other officials and experts in the relevant fields as may be prescribed, to review the order of the Canal Officer under section 8.

(2) Any person aggrieved of the order of the Canal Officer under section 8 may, within thirty days, prefer an appeal to the Review Board in the prescribed manner.

(3) The Review Board shall decide an appeal for review of an order of the Canal Officer within thirty days from the date of filing of the appeal.

Section 16. Appeal against order under section 12

(1) Where a person is aggrieved by an order of Canal Officer under section 12, he may file an appeal to the Chief Engineer within thirty days of the passing of the order.

(2) The Chief Engineer shall decide the appeal within thirty days from the date of filling of the appeal.

Section 17. Protection of actions

No suit, prosecution or other legal proceeding shall lie against any person acting under this Act for anything done in good faith under the Act or any rules made or notification issued under the Act.

Section 18. No liability

(1) Notwithstanding anything contained in this Act, a Canal Officer or any other officer of the Government or the Government shall not be liable for any flood related or other damage occurring to any construction permitted under the Act.

(2) A court or tribunal shall not entertain any claim for compensation or damages for any damage mentioned in subsection (1).

Section 19. Power to make rules

The Government may, by notification in the official Gazette, make rules for carrying out the purposes of this Act.

Section 20. Overriding effect

This Act shall prevail over all other laws and any law inconsistent with the Act shall not be enforced in a flood plain.

Print contents from the source
CONTENTS 
1.       Short title, commencement and extent. 
2.       Definitions. 
3.       Authority to designate flood plain. 
4.       Responsibility of Canal Officers. 
5.       Construction in the flood plain. 
6.       Application for permission. 
7.       Construction approval committee. 
8.       Formal permission to construct. 
9.       Public authorities. 
10.     Special building code. 
11.     Flood plain surveys. 
12.     Removal of unauthorized construction. 
13.     Power to arrest. 
14.     Offence. 
15.     Review Board. 
16.     Appeal against order under section 12. 
17.     Protection of actions. 
18.     No liability. 
19.     Power to make rules. 
20.     Overriding effect.
Compare the original stored transcription

Exact source transcription retained, including print layout and extraction artifacts. Text SHA-256: 4f8426269c40c2dc46f4bfd38be47a028e70510bf649692e26d264b527baa538.

THE PUNJAB FLOOD PLAIN REGULATION ACT 2016 
(XXVII of 2016) 
CONTENTS 
1.       Short title, commencement and extent. 
2.       Definitions. 
3.       Authority to designate flood plain. 
4.       Responsibility of Canal Officers. 
5.       Construction in the flood plain. 
6.       Application for permission. 
7.       Construction approval committee. 
8.       Formal permission to construct. 
9.       Public authorities. 
10.     Special building code. 
11.     Flood plain surveys. 
12.     Removal of unauthorized construction. 
13.     Power to arrest. 
14.     Offence. 
15.     Review Board. 
16.     Appeal against order under section 12. 
17.     Protection of actions. 
18.     No liability. 
19.     Power to make rules. 
20.     Overriding effect. 
TEXT 
 
1THE PUNJAB FLOOD PLAIN REGULATION ACT 2016 
(XXVII of 2016) 
[20th April 2016] 
An 
Act 
to regulate construction in the flood plains in the Punjab. 
It is necessary to regulate construction in flood plains for flood mitigation and 
development of water resources; and, to deal with ancillary matters; 
Be it enacted by Provincial Assembly of the Punjab as follows: 
1.     Short title, commencement and extent.– (1) This Act may be cited as the Punjab 
Flood Plain Regulation Act 2016. 
(2)   It shall come into force at once. 
(3)   It extends to whole of the Punjab. 
2.       Definitions.– In this Act: 
(a)     “breaching section” means the section of a flood embankment or other 
flood protection work which is designated for effecting a controlled breach 
to release a part of flood under specified conditions; 
(b)      “Canal Officer” means a Canal Officer appointed under the Act; 
(c)   “Chief Engineer” means the Chief Engineer of the Irrigation Zone 
commanding the relevant river reach; 
(d)     “committee” means a construction approval committ ee constituted under 
the Act; 
(e)      “construction” means any excavation, clearing, laying of utility lines, road 
or rail line, construction of a bridge or any other physical structure; 
(f)      “flood plain” means the land notified in th e official Gazette as flood pl ain 
under section 3 of the Act; 
(g)      “Government” means Government of the Punjab; 
                                                           
1This Act was passed by the Punjab Assemb ly on 14 April 2016; assented to by the Governor of the Punjab on 19 April 2016; and, 
was published in the Punjab Gazette (Extraordinary), dated 20 April 2016, pages 4663-66. 
(h)      “land” includes the land of any tenure and land submerged in water; 
(i)       “pond area” means the area which is prone to flooding owing to back water 
effect of a dam or barrage; 
(j)       “prescribed” means prescribed by the rules made under the Act; and 
(k)    “river” includes a stream, nallah, hill torrent and any other natural water 
course conveying run-off from rain, snow melt or both. 
3.      Authority to designate flood plain. – (1) The Government may, by notification in 
the official Gazette, containing detail specifications of the land, declare any land as flood 
plain if the land falls under any of the following categories: 
(a)    natural course of a river, area of a lake or wetland; 
(b)    low plain which is adjacent to a river and is likely to flooding; 
(c)   area which is likely to be inundated due to the op eration of a breaching 
section; 
(d)    pond area of a barrage or dam; and 
(e)    area likely to be used for construction of a dam or a barrage. 
(2)    The Government may, by notification in the official Gazette, revise the 
extent of a flood plain at such intervals as may be prescribed. 
4.    Responsibility of Canal Officers. – (1) The Government shall appoint Canal 
Officer not below basic scale 18 for the performance of one or more functions under this 
Act. 
            (2)    A Canal Officer shall have jurisdiction over such part of the flood plain as 
may be specified by the Government. 
            (3)    Where a Canal Officer is on leave or he is absent from duty, a Cana l 
Officer immediately superior to him shall be responsible for his assigned work. 
5.        Construction in the flood plain.– (1) Subject to subsection (2), the Government 
may, by notification in the official Gazette, declare that a person shall no t undertake any 
type of construction in a flood plain without prior permission i n writing of the Canal 
Officer. 
            (2)    The Government may, by notification in the official Gazette, prohibit any 
particular type of construction in a flood plain. 
6.    Application for permission. – (1) A person may make an application for 
permission to construct in a flood plain to the Canal Officer in the prescribed manner. 
 (2) If an existing construction on a flood plain is an illegal constru ction under 
any law, the Government may, by notification in the official Gazette, require that the 
occupant of any category of such construction shall, within ninety days of the 
commencement of this Act, seek permission of the Canal Officer under the Act. 
 (3) The Canal Officer shall, without undue delay but within the time fixed by 
the Government, endorse his opinion on the application and submit it to the committee. 
7. Construction approval committee.– (1) The Government may, by notification in 
the official Gazette, constitute one or more committees headed by Superintending 
Engineer consisting of such Canal Officers, other officials and experts in the relevant 
fields as it deems appropriate, to consider applications for permissio n to construct in a 
flood plain. 
          (2) The committee may, for reasons to be recorded, either rejects the 
application or grant permission subject to such conditions and restrictions as it may 
deem fit to achieve the objectives of this Act. 
          (3) While granting a permission to construct in a flood plain, the committee 
shall, among other things, consider the following matters: 
(a) the obstruction that the construction is likely to cause to the flo w and its 
flood related impact; 
(b) the pressing need for such construction; 
(c) the safety of the construction and its impact on safety of other 
constructions or related areas; and 
(d) the opinion of the Canal Officer on the application for permission to 
construct in the flood plain. 
           (4) The committee shall decide the application within such time as may be 
prescribed or specified by the Government and convey its decision to the Canal Off icer 
without unnecessary delay. 
8. Formal permission to construct. – (1) The Canal Officer shall, in accordance 
with the decision of the committee and within forty five days of receipt of application, 
accept or reject the application for permission to construct in writing and c onvey it to the 
applicant.  
            (2) The Canal Officer shall keep complete record of all applications for 
permission to construct in a flood plain, proceedings on the applications and decision of 
the committee on the applications in the prescribed manner. 
9. Public authorities. – This Act applies to public authorities including the Federal 
Government, a Provincial Government or a local government and a public authority 
shall not finance or undertake any construction in the flood plain without the prior written 
permission of the Canal Officer. 
10. Special building code. – Notwithstanding anything in any other law, the 
Government may prescribe special building code for construction in a flood plain in view 
of their particular requirements of the flood plain. 
11. Flood plain surveys. – Each year in October or at such other time as the 
Government may specify, the Canal Officer shall carryout survey of the flood plain and 
submit report to the Government mentioning cons tructions required to be notified under 
section 5 of this Act. 
12. Removal of unauthorized construction. – (1) Where a construction is 
undertaken otherwise than in accordance with the provisions of this Act, the Canal 
Officer may order its removal and cause it to be removed. 
            (2) For purposes of subsection (1), if considered necessary, a Canal Officer 
may request assistance from the District Collector, local police or an aut hority of the 
local government. 
            (3) The District Collector, local police or the local government shall render the 
assistance to the Canal Officer and shall, in case of inability to render immediate 
assistance, inform the Canal Officer in writing within three days of the request. 
13. Power to arrest.– (1) If a person resists removal of unauthorized construction or 
assaults or threatens any person acting under the order of the Canal Offic er, the person 
may be arrested. 
            (2) Where a person is arrested by a person other than a police officer under 
this Act, he shall immediately be handed over to the nearest police station. 
14. Offence.– (1) A person who undertakes construction or commissions a 
construction in violation of the provisions of this Act shall be guilty of an offence 
punishable with imprisonment which may extend to thirty days and fine which may 
extend to two hundred thousand rupees. 
           (2) If a person occupies an illegal constru ction after ninety days of the 
commencement of the Act, he shall be guilty of an offence punishable with fine which 
may extend to one hundred thousand rupees. 
15. Review Board.– (1) The Government shall constitute a Review Board headed by 
Chief Engineer and comprising such Canal Officers, other officials and experts in the 
relevant fields as may be prescribed, to review the order of the  Canal Officer under 
section 8. 
            (2)  Any person aggrieved of the order of the Canal Officer under section 8 
may, within thirty days, prefer an appeal to the Review Board in the prescribed manner.  
            (3) The Review Board shall decide an appeal for review of an order of the 
Canal Officer within thirty days from the date of filing of the appeal. 
16. Appeal against order under section 12. – (1) Where a person is aggrieved by 
an order of Canal Officer under section 12, he may file an appeal to the Chief Engineer 
within thirty days of the passing of the order. 
            (2)  The Chief Engineer shall decide the appeal within thirty days from the date 
of filling of the appeal. 
17. Protection of actions. – No suit, prosecution or other legal proceeding shall lie 
against any person acting under this Act for anything done in good faith under the Act or 
any rules made or notification issued under the Act. 
18.      No liability.– (1) Notwithstanding anything contained in this Act, a Canal Officer 
or any other officer of the Government or the Government shall not be liable for any 
flood related or other damage occurring to any construction permitted under the Act. 
              (2)   A court or tribunal shall not entertain any claim for compensation or 
damages for any damage mentioned in subsection (1). 
19.     Power to make rules. – The Government may, by notification in the official 
Gazette, make rules for carrying out the purposes of this Act. 
20.    Overriding effect. – This Act shall prevail over all other laws and any law 
inconsistent with the Act shall not be enforced in a flood plain.
LAW LIBRARY MAP

This law in the library

Follow the instruments and provisions named in this source edition, and the laws that cite it. Citation links identify the text being referred to; legal effect and current force require separate examination.

0 citations to other instruments1 citations from other laws6 internal provision references0 explicit external provision references
Laws that cite this instrument 1
References to provisions in this text 6

Section 12

Open the identified operative provision

Read reference in context
plain surveys. 12. Removal of unauthorized construction. 13. Power to arrest. 14. Offence. 15. Review Board. 16. Appeal against order under section 12. 17. Protection of actions. 18. No liability. 19. Power to make rules. 20. Overriding effect. TEXT 1THE PUNJAB FLOOD PLAIN REGULATION ACT 2016 (XXVII of 2016) [20th April 2016] An Act to r

Read the source passage

Section 5

Open the identified operative provision

Read reference in context
t may specify, the Canal Officer shall carryout survey of the flood plain and submit report to the Government mentioning cons tructions required to be notified under section 5 of this Act. 12. Removal of unauthorized construction. – (1) Where a construction is undertaken otherwise than in accordance with the provisions of this Act, the Canal Officer may order its removal and cause it to be remove

Read the source passage

Section 8

Open the identified operative provision

Read reference in context
Engineer and comprising such Canal Officers, other officials and experts in the relevant fields as may be prescribed, to review the order of the Canal Officer under section 8. (2) Any person aggrieved of the order of the Canal Officer under section 8 may, within thirty days, prefer an appeal to the Review Board in the prescribed manner. (3) The Review Board shall decide

Read the source passage

Section 8

Open the identified operative provision

Read reference in context
fields as may be prescribed, to review the order of the Canal Officer under section 8. (2) Any person aggrieved of the order of the Canal Officer under section 8 may, within thirty days, prefer an appeal to the Review Board in the prescribed manner. (3) The Review Board shall decide an appeal for review of an order of the Canal Officer within thirty days from the date o

Read the source passage

Section 12

Open the identified operative provision

Read reference in context
iew Board shall decide an appeal for review of an order of the Canal Officer within thirty days from the date of filing of the appeal. 16. Appeal against order under section 12. – (1) Where a person is aggrieved by an order of Canal Officer under section 12, he may file an appeal to the Chief Engineer within thirty days of the passing of the order. (2) The Chief Engineer shall decide

Read the source passage

Section 12

Open the identified operative provision

Read reference in context
in thirty days from the date of filing of the appeal. 16. Appeal against order under section 12. – (1) Where a person is aggrieved by an order of Canal Officer under section 12, he may file an appeal to the Chief Engineer within thirty days of the passing of the order. (2) The Chief Engineer shall decide the appeal within thirty days from the date of filling of the appeal. 17. Prote

Read the source passage

Explore this law in the whole-library map · Download this law’s relationship evidence · Download preserved source record

Original-source comparison

Original-source character comparison matched under the recorded normalization

Open the compared original source

Source comparison checks the identified transcription and edition. The law's current force, later amendments and territorial application require separate legal review.

Comparison evidence
Stored text SHA-256
4f8426269c40c2dc46f4bfd38be47a028e70510bf649692e26d264b527baa538
Original source SHA-256
0ecbf1d7b2c8d569719ab9324ead64345bd7bc9410571bd719bf3dba8af5a16f
Comparison method
Complete exact non-whitespace character stream after NFKC, quotation-mark equivalents and soft-hyphen removal. Word boundaries and PDF line-layout differences remain separately described.

Download the library source-comparison register

View the recorded official source
Source, version and text details
Recorded title
PUNJAB FLOOD PLAIN REGULATION ACT 2016
Source collection
Punjab — this does not establish territorial applicability.
Recorded version
Not supplied in this record
Source snapshot
2026-08-06T16:56:27Z
Legal status
not independently verified
Text quality
Complete stored UTF-8 TXT file recovered byte-for-byte from owned Drive. Source transcription retained verbatim; legal completeness, OCR accuracy and current consolidation unverified.
Recorded quality flags
No additional flags recorded
Stable record
punjab-code-d6e7715666228ff4
Content extent
Legal completeness not independently established
Integrity scope
Stored UTF-8 text and TXT download bytes checked against their recorded hash. This does not establish legal authenticity or currency.
Passage offsets
zero-based Unicode code points and UTF8 bytes; end exclusive
Stored text SHA-256
4f8426269c40c2dc46f4bfd38be47a028e70510bf649692e26d264b527baa538

Law, understood
in its full context.

Evolutionary

Examine institutional development, adaptation and correction.

Strategic

Examine authority, purpose and the choices before institutions.

Anticipatory

Explore emerging consequences and the safeguards they require.