BOILERS AND PRESSURE VESSELS ORDINANCE, 2002
Stored extracted text; legal completeness and current force have not been independently established. Inspect source and version details
Reading view reduces excess blank space and hides page extraction markers. Original text and downloads are retained.
Reading layout follows the stored source. Open the original transcription below to compare wording and extraction details.
THE BOILERS AND PRESSURE VESSELS ORDINANCE, 2002 (CXXI of 2002)
TEXT 1THE BOILERS AND PRESSURE VESSELS ORDINANCE, 2002 (CXXI of 2002) [13th November, 2002] An Ordinance to amend and consolidate the law relating to boilers and pressure vessels WHEREAS it is expedient to amend and consolidate the law relating to boilers and pressure vessels. AND WHEREAS it is expedient to provide for regulation, use, construction, installation and repair of boilers and pressure vessels; prescribe uniform rules and regulations for boilers and pressure vessels and for matters ancillary thereto or connected therewith;
AND WHEREAS the President is satisfied that circumstances exist which rendered it necessary to take immediate action; NOW, THEREFORE, in pursuance of the Proclamation of Emergency of the fourteenth day of October, 1999, and the Provisional Constitution Order No. I of 1999, read with the Provisional Constitution (Amendment) Order No. 9 of 1999, and in exercise of all powers enabling him in that behalf, the President of the Islamic Republic of Pakistan is pleased to make and promulgate the following Ordinance:–
Section 1. Short title, extent and commencement
(1) This Ordinance may be called the Boilers and Pressure Vessels Ordinance, 2002.
(2) It extends to the whole of 2[the Punjab.]
(3) It shall come into force on such date as the 3[Government] may, by notification in the official Gazette, specify in this behalf and different dates may be specified for different provisions.
Section 2. Definitions
(1) In this Ordinance, unless there is anything repugnant in the subject or context,–
(a) “accident” means an explosion of a boiler or any part thereof which results to weaken the structural strength and render it due for further
1Pursuant to the proclamation of Emergency of the fourteenth day of October 1999, and the Provisional Constitution Order No. I of 1999, read with the Provisional Constitution (Amendment) Order No. 9 of 1999, and in exercise of all powers enabling him in that behalf, the President of the Islamic Republic of Pakistan promulgated this Ordinance which was published in the Punjab Gazette (Extraordinary) dated 13 November 2002, pages 1914-1928.
This Ordinance was originally in the Federal ambit, however, the subject on which this Ordinance was promulgated devolved to the provinces by virtue of 18th Amendment in the Constitution, hence it was adapted, with amendments, for the province of the Punjab by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807.
2Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.3.
3Ibid., s.2, for the words “Federal Government”.
certification;
4[(b) * * * * * * * * * * *]
(c) “Board” means the 5[Punjab] Boilers and Pressure Vessels safety Board constituted under section 25;
(d) “boiler” means a closed vessel exceeding twenty-five liters in capacity in which water is heated, steam is generated and superheated or a combination thereof under pressure, for external use by the application of heat from combustible fuels, electricity or external thermal energy, and includes any mountings or other fittings attached to such vessel which are wholly or partly under pressure when steam is shut off by isolating valve mounted on steam generation equipment; 6[(e) “Chief Inspector, Additional Chief Inspector and Deputy Chief Inspector” mean the Chief Inspector, Additional Chief Inspector and Deputy Chief Inspector appointed under section 5 of the Ordinance;] 7[(f) “Department” means “the Industries, Commerce and Investment Department of the Government;]
8[(ff) “Director General” means Director General of Directorate General of Industries, Price, Weight and Measures Punjab;]
(g) “design specification” means the specifications or standards as specified in the codes referred to in clause (k) to which the boiler shall be designed or manufactured and examined;
(h) “economizer” means any part of heat exchange surface that is wholly or partly exposed to the flue gases for the purpose of recovery of waste heat;
9[(hh) “Government” means Government of the Punjab;]
(i) “Inspector” means an Inspector appointed under this Ordinance;
(j) “Inspection Authority” means the organization other than manufacturer and user, approved by the Board authorized to carry out inspection 10[of a boiler or pressure vessel] during manufacturing, first registration and yearly inspection as provided under this Ordinance and includes the approved third party inspection companies and insurance companies;
4Omitted “clause (b)” by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(a).
5Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.4.
6Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(b).
7Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3. It was earlier substituted by the Punjab Boilers and Pressure Vessels
(Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, .4.
8Inserted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(c).
9Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.4.
10Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
(k) “manufacturer” means the company or firm recognized by the Board, competent to manufacture complete or in parts, a boiler, or fitting, and completes the product and is responsible for the product according to any one of the following codes, namely:–
(i) Pakistan Boilers Regulations;
(ii) ASME (American Society of Mechanical Engineers);
(iii) BS (British Standard);
(iv) TRD;
(v) JIS (Japanese Industrial Standard);
(vi) I.S.O. Standards; and
(vii) Prevailing internationally approved code subject to the approval of the Board;
(l) “owner” includes any company who is in the possession of a boiler or under whose name it has been registered;
(m) “prescribed” means prescribed by regulations or rules made under this Ordinance;
(n) “pressure vessel” means 11[a vessel categorized as such in the rules] along with its fitting other than a Boiler which is capable of being used to contain, distribute, transfer, process or otherwise handle gas, vapors, liquids and store energy under pressure internally and externally;
(o) “Registration Certificate” means the Registration Certificate issued under Section 7; and
(p) “structural alteration, addition or renewal” means changes and deviations from original design in the pressure parts but shall not be deemed to include any renewal or replacement of a petty nature when the part of fitting used for replacement is not inferior in strength, efficiency or otherwise to the replaced part or fitting.
(2) Every reference in this Ordinance to any boiler or economizer where
provided shall be considered as integral part of the boiler.
[12] Section 3. Limitation of application of this Ordinance
(1) Nothing in this Ordinance shall apply to–
(a) any boiler in any steamship or in any mechanically propelled vessel;
(b) any boiler appertaining to a sterilizer or disinfector and the like used in hospitals, hotels, laboratories and other industries etc, if it does not exceed ninety one liters in capacity;
(c) any boiler used in relation to the nuclear energy; and
(d) any boiler or steam-pipe, belonging to or under the control of railway.
11Substituted for the words “a vessel” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
12Substituted by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.5.
(2) The Government may, by notification in the official Gazette and for reasons to be recorded in writing, declare that provisions of this Ordinance shall not apply in the case of any specified class of boilers or steam-pipes.]
Section 4. Power to limit extent
The 13[Government] may, with the concurrence of the Board, by notification in the official Gazette, exclude any specified area from the operation of all or any of the provisions of this Ordinance.
Section 5. Appointment of Chief Inspector, 14[Additional Chief Inspector,] Deputy Chief Inspector and Inspector
(1) The 15[16[Chief Minister]] shall appoint a person to be Chief Inspector for the province, who may, in addition to the powers and duties conferred or imposed on the Chief Inspector under this Ordinance, exercise any power or perform any duty so conferred or imposed on Deputy Chief Inspector and Inspector by or under this Ordinance.
(2) The 17[18[Secretary of the Department]] may appoint such persons as it thinks fit to be 19[Additional Chief Inspector and] Deputy Chief Inspectors for the Province who may, in addition to the powers and duties conferred or imposed on the Deputy Chief Inspector under this Ordinance, exercise any power or perform any duty so conferred or imposed on Inspector by or under this Ordinance.
(3) The 20[21[Director General]] may appoint such persons as it thinks fit to be Inspector for the Province for the purpose of this Ordinance, and may define the local limits within which each Inspector shall exercise the powers and perform the duties conferred or imposed by, or under, this Ordinance.
(4) Every Chief Inspector, 22[Additional Chief Inspector,] Deputy Chief Inspector and Inspector shall be deemed to be a public servant within the meaning of the Pakistan Penal Code (Act XLV of 1860).
Section 6. Prohibition of use of unregistered or uncertified boilers
Save as otherwise expressly provided in this Ordinance, no owner of a boiler 23[or pressure
13Substituted for the words “Provincial Government” by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
14Inserted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(a).
15Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
16Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(b).
17Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
18Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(c)(i).
19Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(c)(ii).
20Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
21Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(d).
22Inserted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(e).
23Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
vessel] shall use the boiler 24[or pressure vessel] or permit it to be used-
(a) unless it has been registered in accordance with the provisions of this Ordinance;
25[(b) in case of any boiler 26[or pressure vessel] which has been transferred from another Province or territory until it is registered under this Ordinance;]
(c) unless a certificate or provisional order authorizing the use of the boiler 27[or pressure vessel] is for the time being in force under this Ordinance;
(d) at a pressure higher than the maximum pressure recorded in such certificate or provisional order or under which the boiler 28[or pressure vessel] was constructed and stamped; 29[*]
30[(e) unless the boiler or pressure vessel is in the charge of a person holding the Boiler Engineers Competency Certificate required by such rules and he is not less than twenty one years of age:
Provided that a person who is more than seventy years of age shall produce for each year a medical certificate of fitness issued by a Medical Officer of a Tehsil or District Headquarters Hospital31[; and]] 32[(f) where any material used as a fuel for combustion in contravention of the standards prescribed by the Board.]
Section 7. Registration
(1) The owner of a boiler 33[or pressure vessel], which is not registered under the provisions of this Ordinance, shall apply to the Chief Inspector, under intimation to the 34[Inspection Authority or, as the case may be, the Inspector], to have the boiler 35[or pressure vessel] registered. Imported boilers 36[or pressure vessels] which have been operated outside Pakistan will require an examination certificate from an insurance or third party inspection company of the country where
24Ibid.
25Substituted by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.6.
26Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
27Ibid. 28Ibid.
29Omitted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(a).
30Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.4.
31Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(b).
32Added by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(c).
33Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
34Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
35Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
36Ibid.
the boiler 37[or pressure vessel] has been in operation confirming integrity of boiler 38[or pressure vessel] in line with the guidelines for the Examination of Boiler 39[or pressure vessel] End Plate to Furnace and Shell Welded Joints issued by the Associated Offices Technical Committee, UK or country of origin. The application shall be accompanied by a copy of bill of entry and evidence of payment of custom duty and such application shall be accompanied by the prescribed fee.
(2) On receipt of an application under sub-section (1) the 40[Inspection Authority or, as the case may be, the Inspector] shall fix a date, within fifteen days or such shorter period as may be prescribed from the date of the receipt, for the examination of the boiler 41[or pressure vessel] and shall decide the inspection time and schedule with the owner.
(3) On the date referred to in sub-section (2) the 42[Inspection Authorities or, as the case may be, the Inspectors] shall proceed to examine the boiler 43[or pressure vessel] and to determine in the prescribed manner the maximum pressure, if any, at which such boiler 44[or pressure vessel] may be used, and shall report the result of the examination to the Chief Inspector.
45[(4) The Chief Inspector, on receipt of the examination report from the Inspection Authority or Inspector, as the case may be, shall:
(a) register the boiler or pressure vessel and assign a registration number within three working days; or
(b) refuse to register the boiler and pressure vessel and declare the boiler or pressure vessel not fit for approval.]
(5) Where the Chief Inspector refuses to register a boiler 46[or pressure vessel] the 47[Inspection Authority or, as the case may be, the Inspector] shall forth with communicate refusal to the owner of the boiler 48[or pressure vessel] together with the reasons thereof.
(6) The Chief Inspector may randomly check or counter check the quality
37Ibid. 38Ibid. 39Ibid.
40Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
41Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
42Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
43Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
44Ibid.
45Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.5.
46Ibid.
47Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
48Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
of inspection and the procedure of examination of the 49[Inspection Authority or, as the case may be, the Inspector] but not exceeding twenty – five percent of boilers 50[or pressure vessels] offered for first registration.
(7) The Chief Inspector shall, on registering the boiler 51[or pressure vessel], order to issue a Registration Certificate to the owner in the prescribed form authorizing the use of the boiler 52[or pressure vessel] for a period not exceeding twelve months at a pressure not exceeding such maximum pressure as may be prescribed by regulations.
(8) The Inspector shall forthwith convey to the owner of the boiler 53[or pressure vessel], the order of the Chief Inspector through courier or registered post. The owner shall within seven days of receipt of Registration Certificate cause the register number to be permanently marked thereon in the prescribed manner. 54[(9) Subject to the fulfillment of all technical requirements by the owner, the registration of a boiler or pressure vessel shall be completed within thirty days of the submission of an application for its registration.]
Section 8. Renewal of Registration Certificate
(1) The Registration Certificate authorizing the use of a boiler 55[or pressure vessel] shall cease to be in force–
(a) on the expiry of the period for which it was granted;
(b) when any accident occurs to the boiler 56[or pressure vessel];
(c) when the boiler 57[or pressure vessel] is moved from one location to another unless it is registered as mobile unit;
(d) when any structural alteration, addition or renewal is made in or to any steam– pipe attached to the boiler 58[or pressure vessel]; or
(e) if the Chief Inspector in any particular case so directs, when any structural alteration, addition or renewal is made in or to any steam pipe made in or to any steam– pipe attached to the boiler 59[or pressure vessel].
(2) When a Registration Certificate ceases to be in force, the owner of the boiler 60[or pressure vessel] shall have the option to apply to the 61[Inspection
49Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
50Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
51Ibid. 52Ibid. 53Ibid.
54Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.5.
55Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
56Ibid. 57Ibid. 58Ibid. 59Ibid. 60Ibid.
Authority] or the Inspector for a renewal thereof under intimation to the Chief Inspector for such period not exceeding twelve months as he may specify in the application. 62[(3) An application under subsection (2) shall be accompanied by the receipt of payment of the prescribed fee.
(3a) On receipt of intimation from the owner, the Inspection Authority or, as the case may be, the inspector shall fix a date within fifteen days or such shorter period as may be agreed to with the owner from the date of the receipt for examination of the boiler or pressure vessel and shall give the owner at least three days’ notice for the purpose.]
(4) On the date fixed under sub-section (3) the 63[Inspection Authority] or the Inspector, as the case may be, shall examine the boiler 64[or pressure vessel] as per approved applicable code, and if the 65[Inspection Authority] or the Inspector, as the case may be, is satisfied that the boiler 66[or pressure vessel] is in good condition shall recommend to the Chief Inspector for renewal of the Registration Certificate authorizing the use of the boiler 67[or pressure vessel] for such period not exceeding twelve months and at a pressure not exceeding such maximum pressure as the 68[Inspection Authority] or the Inspector as the case may be, may determine and as may be prescribed by regulations.
(5) Where the 69[Inspection Authority] or the Inspector, as the case may be-
(a) makes recommendations as per the approved codes to any structural alteration, addition or renewal to be made in or to the boiler 70[or pressure vessel]; or
(b) is of opinion that the boiler 71[or pressure vessel] is not fit for use, the 72[Inspection Authority] or the Inspector, as the case may be, shall inform the owner of the boiler 73[or pressure vessel] in writing of findings
61Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
62Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.6.
63Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
64Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
65Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
66Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
67Ibid.
68Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
69Ibid.
70Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
71Ibid.
72Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
73Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
and the reasons thereof, and shall forthwith report the case with recommendations for orders to the Chief Inspector.
(6) The Chief Inspector, on receipt of a report under sub-section (5) may, subject to the provisions of this Ordinance and of the 74[rules or regulations] made there under, order the renewal of the Registration Certificate in such terms and on such conditions, if any, as he thinks fit, or may refuse to renew it:
Provided that where the Chief Inspector refuses to renew a Registration Certificate, he shall forthwith communicate his refusal to the owner of the boiler 75[or pressure vessel], together with the reasons thereof.
(7) The aggrieved party may, within seven days of the order, apply to the board regarding rejection of his request for the renewal of Registration Certificate and the Board shall issue appropriate orders either approving or disapproving the order of the Chief Inspector within thirty days of notice of order of the Chief Inspector.
(8) Nothing in this section shall be deemed to prevent an owner of a boiler 76[or pressure vessel] from applying for a renewal of Registration Certificate at any time during the currency of a Registration Certificate.
Section 9. Provisional orders
77[(1) Where the Inspector, based on the findings of the Inspection Authority or otherwise, reports the case of any boiler or pressure vessel to the Chief Inspector under subsection (3) or subsection (5) of section 8, he may, if the use of boiler or pressure vessel is not prohibited under subsection (1) of section 8, issue a provisional order in writing to the owner permitting the boiler or pressure vessel to be used at a pressure not exceeding such maximum pressure as recommended by the Inspection Authority or, as the case may be, the Inspector or as may be prescribed, pending the receipt of the order of the Chief Inspector.]
(2) A provisional order issued under sub– section (1) shall cease to be in force–
(a) on the expiry of six months from the date on which it is granted;
(b) on receipt of the orders of the Chief Inspector; or
(c) in any of the cases referred to in clauses (b) (c) (d) and (e) of sub– section (1) of section 8 shall stands cancelled.
10. Use of boiler pending grant of Registration Certificate.–
(1) Notwithstanding anything contained in this Ordinance, when the period of a Registration Certificate relating to a boiler has expired, the owner shall, provided that he has applied before the expiry of that period for a renewal of the Registration Certificate, be entitled to use the boiler at the maximum pressure entered in the former Registration Certificate pending the issue of orders on the application:
74Substituted for the word “regulations” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.6.
75Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
76Ibid.
77Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.7.
Provided that nothing in this section shall be deemed to authorize the use of a boiler in any of the cases referred to in clauses (b) , (c), (d) and (e) of sub-section (1) of section 8 occurring after the expiry of the period of the Registration Certificate.
(2) When a boiler cannot be offered for inspection by the owner for reasons which in the opinion of the owner are beyond his control such as the existence of 78[an emergency], the owner may approach the Chief Inspector, who may authorize the use of the boiler for a period not exceeding three months after the expiry of the Registration Certificate. The owner may also approach the Chief Inspector for grant of a provisional certificate not exceeding three months on payment of the prescribed fee.
Section 11. Revocation of Registration Certificate or provisional order
(1) The Chief Inspector may, at any time, withdraw or revoke a Registration Certificate or provisional order on the report of the Inspector–
(a) if there is reason to believe that the Registration Certificate or provisional order has been fraudulently obtained or has been granted erroneously or without sufficient examination; or
(b) if the boiler in respect of which it has been granted has developed some defect or has ceased to be in good conditions; or
(c) where the 79[Government] has made rules requiring that boilers shall be in the charge of persons holding certificates of competency and the boiler is in the charge of a person not holding the certificate required by such rules; or
(d) where no such rules have been made, if the boiler is in the charge of a person who is not maintaining the boiler in accordance with standard operation procedures 80[, standards and provisions of the Ordinance]:
Provided that where the Chief Inspector withdraws or revokes a Registration Certificate or provisional order on the ground specified in clause (d), he shall communicate to the owner of the boiler the reasons in writing for the withdrawal or revocation, and the order shall not take effect until the expiry of fifteen days from the receipt of such communication.
(2) The owner shall have the right to appeal to the Board against the order of the Chief Inspector.
(3) The Board shall issue appropriate orders either approving or disapproving the order of the Chief Inspector within thirty days of notice of the order of the Chief Inspector.
Section 12. Alterations and renewals to boilers
No structural alteration, addition or renewal shall be made by the repairer in any boiler registered under this Ordinance unless such alteration, addition or renewal has been sanctioned in writing by the Chief Inspector. The execution of any modification as per the approved drawings
78Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.7.
79Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
80Inserted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.6.
shall be verified by the 81[Inspection Authority].
Section 13. Duty of owner at examination
(1) On any date fixed under this Ordinance for the examination of a boiler 82[or pressure vessel], the owner thereof shall be bound– 83[(a) to intimate the Inspection Authority or the Inspector, as the case may be, to provide all reasonable facilities for examination and to furnish such information as may be required;]
(b) to have the boiler 84[or pressure vessel] properly prepared and ready for examination as per written down examination procedures conforming to applicable codes; and
(c) in the case of an application for the registration of a boiler 85[or pressure vessel], to provide such drawings, specifications, certificates and other particulars as may be prescribed.
(2) If the owner fails, without reasonable cause, to comply, the 86[Inspection Authority or, as the case may be, the Inspector] at the expense of owner shall refuse to make the examination and shall report the case to the Chief Inspector who shall, unless sufficient cause to the contrary is shown, require the owner to file a fresh application under section 7 or section 8, as the case may be, and may forbid him to use the boiler 87[or pressure vessel] notwithstanding anything contained in section10.
Section 14. Production of Registration Certificate, etc
(1) The owner of any boiler 88[or pressure vessel] who holds a Registration Certificate or provisional order relating thereto shall, at all reasonable times during the period for which the Registration Certificate or provisional order is in force, be bound to produce the same when called upon to do so by the Chief Inspector or the Inspector. 89[(2) On non-compliance of an order, the Chief Inspector may initiate proceedings for cancellation of the registration certificate in the prescribed manner.]
Section 15. Powers of entry
An Inspector may, for the purpose of inspecting or
81Substituted for the word “insurance company” by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.7.
82Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
83Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.8.
84Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
85Ibid.
86 Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
87Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
88Ibid.
89Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.9.
examining a boiler or any steam-pipe attached thereto or in case of non observance of any provision of this Ordinance or of any regulations or rules at all reasonable times enter any place or building within the limits of the area for which he has been appointed in which he has reason to believe that the boiler is in use.
[90] Section 16. Report of accidents
(1) If any accident occurs to a boiler or pressure vessel, the owner or boiler engineer incharge shall immediately report such accident, in writing, to the Chief Inspector or the concerned Inspector, and such report shall contain a description of nature of the accident, the injury or casualty, if any and the damage to the boiler or pressure vessel.
(2) The Inspector, on its own information or on receipt of report under sub- section (1) or on the direction of the Chief Inspector, as the case may be, shall visit the site of the accident immediately.
(3) The Inspector shall submit a preliminary report to the Chief Inspector within twenty-four hours of receipt of information of the accident or direction issued under sub-section (2).
(4) The Chief Inspector shall, if deemed necessary, submit the report, as early as possible, with his recommendations to the Director General for constitution of an accident committee to determine the root cause of accident and fix the responsibility for such accident.
(5) The accident committee constituted by the Director General shall submit its comprehensive report with recommendations to the Board and the Board may direct any appropriate action under the Ordinance including direction to the Chief Inspector to get registered First Information Report through concerned Inspector against responsible persons and suspension of competency certificate of boiler engineer.
(6) The owner shall facilitate the accident committee to have access to the place of accident for the purpose of collection of evidence and every person having information of such accident shall answer truly to the best of his knowledge and ability to every question put to him, in writing, by the accident committee.]
Section 17. Appeal to the Board
(1) Any person, owner or company aggrieved by any recommendation made by the insurance company or findings or decision of the Chief Inspector for–
(a) refusing to register a boiler or to grant or renew a Registration Certificate in respect of a boiler; or
(b) refusing to grant a Registration Certificate having validity for the full period applied for; or
(c) refusing to grant a Registration Certificate authorizing the use of a boiler at the maximum pressure desired; or
(d) withdrawing or revoking a Registration Certificate or provisional order; or
(e) reducing the amount of pressure specified in any certificate or the period for which such certificate has been granted; or
90Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.8.
(f) ordering any structural alteration, addition or renewal to be made in or to a boiler which contravenes the design code, or refusing sanction to the making of any structural alteration, addition or renewal in or to a boiler based on approved drawings may, within fifteen days of the communication to him of such order, refer appeal to the Board.
(2) The Board shall communicate the decision in thirty days of receipt of an appeal, and pending final decision of the Board may grant interim relief to the
owner.
Section 18. Finality of orders
An order of the Board under section 17 shall be final and shall not be called in question in any court.
Section 19. Minor penalties
Any owner of a boiler who refuses or without reasonable excuse neglects–
(a) to surrender a provisional order as required by section 9;
(b) to produce a certificate or provisional order when duly called upon to do so under section 14; or
(c) to hand over to the new owner of a boiler a Registration Certificate or provisional order as required by section 14, shall be punishable with fine which may extend to ten thousand rupees.
[91] Section 20. Illegal use of boiler and pressure vessel
(1) The owner of a boiler or pressure vessel who, in any case in which a registration certificate or provisional order is required for its use under the Ordinance, uses the boiler or pressure vessel either without any such certificate or order being in force or without the assistance or presence of a qualified boiler engineer or at a higher pressure than that allowed thereby, shall be issued a warning to comply with the such provisions of the Ordinance, rules or regulations and within such time as the Chief Inspector may specify.
(2) In case, the order under subsection (1) is not implemented within the specified time, the Chief Inspector shall take such action as may be necessary including the closure of the boiler or pressure vessel or revocation of the registration certificate in the prescribed manner or, if necessary, sealing the factory in the prescribed manner.]
[92] Section 21. Penalties
Any person who:
(a) uses or permits to be used a boiler or pressure vessel of which he is the owner and which has been transferred from any Province to Province of the Punjab without such transfer having been reported as required by section 6; or
(b) being the owner of a boiler or pressure vessel, fails to cause the register number allotted to the boiler or pressure vessel under this
91Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.10.
92Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.11.
Ordinance, to be marked on the boiler or pressure vessel as required by subsection (8) of section 7; or
(c) makes any structural alteration, addition or renewal in or to a boiler or pressure vessel without prior approval when so required under section 12; or
(d) fails to report an accident to the boiler or pressure vessel when so required under section 16; or
(e) hampers with a safety valve of the boiler or pressure vessel so as to render it inoperative at the maximum pressure at which the use of the boiler or pressure vessel is authorized under this Ordinance; or
(f) uses the boiler or pressure vessel without getting it registered under the Ordinance; or
(g) fails to have a periodical inspection certificate issued for the boiler or pressure vessel as prescribed; or
(h) is a manufacturer of boilers or pressure vessels and contravenes the prescribed codes; or
(i) operates the boiler or pressure vessel without the assistance and presence of a qualified boiler engineer or technician–
shall be liable to punishment with imprisonment which may extend to two years but which shall not be less than three months and fine which may extend to four hundred thousand rupees but which shall not be less than fifty thousand rupees.]
Section 22. Penalties for tempering with registration number, etc
(1) Whoever removes, alters, defaces, renders invisible or otherwise tampers with the register number marked on a boiler 93[or pressure vessel] in accordance with this Ordinance or any law repealed, hereby, shall be punishable with fine which may extend to twenty five thousands rupees.
(2) 94[* * * * * * * * * * * ]
(3) Whoever fraudulently marks upon a boiler 95[or pressure vessel] a register number which has not been allotted to it under this Ordinance or any Act repealed hereby, shall be punishable with imprisonment which may extend to two years, or with a fine which may extend to fifty thousands rupees or with both.
Section 23. Limitation and previous sanction for prosecution
No prosecution for an offence punishable by or under this Ordinance shall be instituted–
(a) after six month of the commission of an offence; and
(b) without the previous sanction of the Chief Inspector.
93Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
94Omitted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.12.
95Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
Section 24. Trial of offence
Not withstanding any thing in the Code of Criminal Procedure, 1898 (Act V of 1898) no Court not inferior to that of a Magistrate of the first class shall try an offence under this Ordinance.
[96] Section 25. Punjab Boiler and Pressure Vessels Safety Board
97[(1) The Government shall constitute a Board to be called the Punjab Boilers and Pressure Vessels Safety Board for purposes of this Ordinance.
(1A) The Board shall consist of the following:
(a) Secretary to the Government, Industries, Commerce and Investment Department;
Chairperson
(b) Director General Industries, Prices, Weights and Measures;
Member
(c) an officer not below the rank of an Additional Secretary of the Department;
Member
(d) Chief Inspector;
Secretary
(e) one person nominated by the Lahore Chamber of Commerce and Industry, Lahore;
Member
(f) one person nominated by the Federal Chamber of Commerce and Industry, Islamabad;
Member
(g) two manufacturers of boilers and pressure vessels nominated by the Government;
Members
(h) two users of boilers and pressure vessels nominated by the Government;
Members
(i) one representative of the Inspection Authority nominated by the Government;
Member 98[(ia) a technical expert on Environment Protection and Climate Change, not below the rank of BPS-18, nominated by the Secretary to the Government, Environment Protection and Climate Change Department;
Member
(ib) Two members of Provincial Assembly of the Punjab, one from the Treasury and one from the Opposition, to be nominated by the Speaker of the Assembly;
Members]
(j) a faculty member of the Mechanical Member
96Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.8.
97Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.13.
98Inserted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.9.
Engineering Department of University of Engineering and Technology, Lahore; and
(k) a Boiler Engineer nominated by the Government.
Member
(1B) The Board may co-opt a professional member from a public or private sector organization for expert opinion.
(1C) The term of a member, other than an ex officio member, shall be three
years.
(1D) The Government may increase or decrease the number of members of the Board.] 99[100[26. * * * * * * * * * * *]]
[101] Section 27. Filling of vacancies
The Government shall, within sixty days from the date of occurrence of a vacancy, fill the vacancy in the Board 102[* * * *].
Section 28. Meeting of the Board
(1) The Powers of the Board shall be exercised with a quorum of at least seven members of the Board in which representation of the manufacturers and users shall be mandatory.
(2) The Board shall meet once every three months to review the implementation of rules, regulations and other matters on the agenda.
Section 29. Power to make rules
(1) The Board may, with the approval of the 103[Government] by notification in the official Gazette, make rules for carrying out the purposes of this Ordinance.
(2) Without prejudice to the generality of the foregoing power, such rules may provide for all or any of the following matters, namely:–
(a) for prescribing the qualifications and duties of the Chief Inspector, Deputy Chief Inspector and Inspectors;
(b) for regulating the transfer of boilers 104[or pressure vessels];
(c) for providing for the registration and certification of boilers 105[or pressure vessels] in accordance with the regulations and approved codes under this Ordinance;
99Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.9.
100Omitted “section 26’’ by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.10.
101Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.10.
102Omitted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.11.
103Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
104Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
105Ibid.
(d) for requiring boilers 106[or pressure vessels] to be in the charge of persons holding certificates of competency, and for prescribing the conditions on which such certificates may be granted;
(e) for prescribing the times within which the 107[Inspection Authority] shall be required to examine the boiler 108[or pressure vessel] as per approved practice or code of examination;
(f) for prescribing the fees payable for the renewal of Registration Certificate and methods of determining the amount of such fees in each case;
109[(g) for regulating the procedure of inquiries into accidents;]
(h) for determining the mode of disposal of fees, costs and penalties levied under this Ordinance; and
(i) generally to provide advice for any matter which is, in the opinion of the Board, a matter of local importance in the Province.
Section 30. Power to make regulations
(1) The Board may, by notification in the official Gazette, make regulations for carrying out the purposes of Ordinance.
(2) Without prejudice to the generality of the foregoing powers such regulations may provide for all or any of the following matters, namely:–
(a) adopting code and procedures as laid down in international boiler 110[or pressure vessel] code for materials, design and construction which shall be required for the purpose of registration and certification of a boiler 111[or pressure vessel] under this Ordinance;
(b) for prescribing the circumstances in which the extent to which, and the conditions subject to which variations from the standards laid down under international boiler 112[or pressure vessel] codes may be permitted;
(c) for prescribing the method of determining the maximum pressure at which a boiler 113[or pressure vessel] may be used;
(d) for regulating, the registration of boilers 114[or pressure vessels],
106Ibid.
107Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
108Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
109Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.12.
110Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
111Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
112Ibid. 113Ibid. 114Ibid.
prescribing the fees payable thereof, the drawings, specifications, certificate, particulars to be produced by the owner, the method of preparing a boiler 115[or pressure vessel] for examination by 116[Inspection Authority], the method of marking the register number, the period within which number is to be marked on the boiler 117[or pressure vessel], selection and regulating the rules for Inspection Authority and nomination of 118[Inspection Authorities] for boiler 119[or pressure vessel] insurance;
120[(e) excluding and exempting a pressure vessel from registration, inspection and certification;
(f) prescribing the time within which the Inspection Authority shall be required to examine a pressure vessel as per approved practice or codes of examination; and
(g) regulating examination of boiler engineers and their certification.]
[121] Section 31. Breach of rules and regulations
(1) Any rules or regulations made under section 29 or section 30 may provide that a person or company contravening such rules or regulations shall be warned by the Chief Inspector to take such remedial action within such time as the Chief Inspector may specify.
(2) In case, the remedial steps are not taken within the specified time, the Chief Inspector shall take necessary action to stop illegal use of the boiler or pressure vessel, including the closure of the boiler or pressure vessel, revocation of the registration certificate in the prescribed manner or, if necessary, sealing of the factory in the prescribed manner.]
Section 32. Previous publication of rules or regulations
(1) The power to make rules and regulations conferred by sections 29 and 30 respectively shall be subject to the condition of the rules and regulations being made after previous publication.
(2) The rules and regulations so made shall be published in the official Gazette and on such publication, shall have effect as if enacted in this Ordinance.
Section 33. Recovery of fees, etc
All fees, costs and penalties levied under this Ordinance shall be recoverable as arrears of land revenue.
115Ibid.
116Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
117Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
118Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
119Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
120Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.15.
121Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.16.
[122] Section 34. Application of the Ordinance to the Governments
Save as otherwise expressly provided, this Ordinance shall be applicable to boilers and pressure vessels belonging to the Government, Federal Government, local government or any other Provincial Government.]
Section 35. Power to suspend in case of emergency
(1) The 123[Government] may, by notification in the official Gazette, with the consultation of the Board, exempt from the operation of this Ordinance, subject to such conditions and restrictions as it thinks fit, any boilers 124[or pressure vessels] or classes or types of boilers 125[or pressure vessels] used exclusively for the heating of buildings or the supply of hot water.
(2) In case of any emergency the 126[Government] may, by general or special order in writing, exempt any boilers 127[or pressure vessels] or any class of boilers 128[or pressure vessels] from the operation of all or any of the provisions of this Ordinance.
Section 36. Inspection by 129[Inspection Authority or, as the case may be, the Inspector]
(1) The 130[Inspection Authority or, as the case may be, the Inspector] shall carry out inspection of boilers 131[or pressure vessels] at the first registration as well as subsequent inspections as defined in the Ordinance.
(2) The 132[Inspection Authority or, as the case may be, the Inspector] shall be approved by the Board for the purposes of this Ordinance, and shall have qualified personnel and necessary skill to carry out the inspection and examination of boilers 133[or pressure vessels] within the scope and under the guidelines of any approved code.
(3) The 134[Inspection Authority’s or, as the case may be, the Inspector’s] technical personnel shall be approved by the Board for the purposes of this Ordinance.
122Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.11.
123Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
124Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
125Ibid.
126Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
127Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
128Ibid.
129 Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
130Ibid.
131Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
132Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
133Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
134Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
Section 37. Insurance of boilers
All boilers shall be insured against damage due to accidents as per the existing laws and standards.
Section 38. Repeal and saving
(1) The Boilers Act, 1923 (V of 1923), is hereby repealed.
(2) Any boiler registered, certified or licensed under the Boilers Act, 1923 (V of 1923), shall be deemed to have been registered, certified or licensed under this Ordinance.
(3) Notwithstanding the repeal of the Boilers Act, 1923 (V of 1923), the rules and regulations made under the said Act, and in force immediately before the commencement of this Ordinance, shall, mutatis mutandis and in so far they are not inconsistent with any of the provisions of this Ordinance, shall continue in force until repealed or altered by rules or regulations made under this Ordinance.
Print contents from the source
CONTENTS 1. Short title, extent and commencement 2. Definitions 3. Limitation of application of this Ordinance 4. Power to limit extent 5. Appointment of Chief Inspector, Additional Chief Inspector, Deputy Chief Inspector and Inspector 6. Prohibition of use of unregistered or uncertified boilers 7. Registration 8. Renewal of Registration Certificate 9. Provisional orders 10. Use of boiler pending grant of Registration Certificate 11. Revocation of Registration Certificate or provisional order 12. Alterations and renewals to boilers 13. Duty of owner at examination 14. Production of Registration Certificate, etc 15. Powers of entry 16. Report of accidents 17. Appeal to the Board 18. Finality of orders 19. Minor penalties 20. Illegal use of boiler and pressure vessel 21. Penalties 22. Penalties for tempering with registration number, etc 23. Limitation and previous sanction for prosecution 24. Trial of offence 25. Punjab Boiler and Pressure Vessels Safety Board 26. [Omitted] 27. Filling of vacancies 28. Meeting of the Board 29. Power to make rules 30. Power to make regulations 31. Breach of rules and regulations 32. Previous publication of rules or regulations 33. Recovery of fees, etc 34. Application of the Ordinance to the Governments 35. Power to suspend in case of emergency 36. Inspection by Inspection Authority or, as the case may be, the Inspector 37. Insurance of boilers 38. Repeal and saving
Compare the original stored transcription
Exact source transcription retained, including print layout and extraction artifacts. Text SHA-256: 3b5857b3c00258881adfd5dd5f3ba5218557f0faa724b5132067e07d77c7c52c.
THE BOILERS AND PRESSURE VESSELS ORDINANCE,
2002
(CXXI of 2002)
CONTENTS
1. Short title, extent and commencement
2. Definitions
3. Limitation of application of this Ordinance
4. Power to limit extent
5. Appointment of Chief Inspector, Additional Chief Inspector, Deputy
Chief Inspector and Inspector
6. Prohibition of use of unregistered or uncertified boilers
7. Registration
8. Renewal of Registration Certificate
9. Provisional orders
10. Use of boiler pending grant of Registration Certificate
11. Revocation of Registration Certificate or provisional order
12. Alterations and renewals to boilers
13. Duty of owner at examination
14. Production of Registration Certificate, etc
15. Powers of entry
16. Report of accidents
17. Appeal to the Board
18. Finality of orders
19. Minor penalties
20. Illegal use of boiler and pressure vessel
21. Penalties
22. Penalties for tempering with registration number, etc
23. Limitation and previous sanction for prosecution
24. Trial of offence
25. Punjab Boiler and Pressure Vessels Safety Board
26. [Omitted]
27. Filling of vacancies
28. Meeting of the Board
29. Power to make rules
30. Power to make regulations
31. Breach of rules and regulations
32. Previous publication of rules or regulations
33. Recovery of fees, etc
34. Application of the Ordinance to the Governments
35. Power to suspend in case of emergency
36. Inspection by Inspection Authority or, as the case may be, the Inspector
37. Insurance of boilers
38. Repeal and saving
TEXT
1
THE BOILERS AND PRESSURE VESSELS ORDINANCE, 2002
(CXXI of 2002)
[13th November, 2002]
An
Ordinance
to amend and consolidate the law relating to boilers and pressure vessels
WHEREAS it is expedient to amend and consolidate the law relating to boilers
and pressure vessels.
AND WHER EAS it is expedient to provide for regulation, use , construction,
installation and repair of boilers and pressure vessels; prescribe uniform rules and
regulations for boilers and pressure vessels and for matters ancillary thereto or
connected therewith;
AND WHEREAS the President is satisfied that circumstances exist which
rendered it necessary to take immediate action;
NOW, THEREFORE, in pursuance of the Proclamation of Emergency of the
fourteenth day of October , 1999, and the Provisional Constitution Order No. I of
1999, read with the Provisional Constitution (Amendment) Order No. 9 of 1999, and
in exercise of all powers enabling him in that behalf, the President of the Islamic
Republic of Pakistan is pleased to make and promulgate the following Ordinance:–
1. Short title, extent and commencement .– (1) This Ordinance may be called
the Boilers and Pressure Vessels Ordinance, 2002.
(2) It extends to the whole of
2
[the Punjab.]
(3) It shall come into force on such date as the
3
[Government] may, by
notification in the official Gazette, specify in this behalf and different dates may be
specified for different provisions.
2. Definitions.– (1) In this Ordinance, unless there is anything repugnant in the
subject or context,–
(a) “accident” means an explosion of a boiler or any part thereof which
results to weaken the structural strength and render it due for further
1Pursuant to the proclamation of Emergency of the fourteenth day of October 1999, and the Provisional Constitution Order No. I
of 1999, read with the Provisional Constitution (Amendment) Order No. 9 of 1999, and in exercise of all powers enabling him i n
that behalf, the President of the Islamic Republic of Pakistan promulgated this Ordinance which was published in th e Punjab
Gazette (Extraordinary) dated 13 November 2002, pages 1914-1928.
This Ordinance was originally in the Federal ambit, however, the subject on which this Ordinance was promulgated devolved to
the provinces by virtue of 18th Amendment in the Constitution, hence it was adapted, with amendments, for the province of the
Punjab by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of 2013); and published in the Punjab Gazette
(Extraordinary), dated 3.9.2013, pages 805-807.
2Substituted by th e Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.3.
3Ibid., s.2, for the words “Federal Government”.
certification;
4[(b) * * * * * * * * * * *]
(c) “Board” means the
5
[Punjab] Boilers and Pressure Vessels safety
Board constituted under section 25;
(d) “boiler” means a closed vessel exceeding twenty -five liters in capacity
in which water is heated, steam is generated and superheated or a
combination thereof under pressure, for external use by the application
of heat from combustible fuels, electricity or external thermal energy,
and includes any mountings or other fittings attached to such vessel
which are wholly or partly under pressure when steam is shut off by
isolating valve mounted on steam generation equipment;
6[(e) “Chief Inspector, Additional C hief Inspector and Deputy Chief
Inspector” mean the Chief Inspector, Additional Chief Inspector and
Deputy Chief Inspector appointed under section 5 of the Ordinance;]
7
[(f) “Department” means “the Industries, Commerce and Investment
Department of the Government;]
8[(ff) “Director General” means Director General of Directorate General of
Industries, Price, Weight and Measures Punjab;]
(g) “design specification” means the specifications or standards as
specified in the codes referred t o in clause (k) to which the boiler shall
be designed or manufactured and examined;
(h) “economizer” means any part of heat exchange surface that is wholly
or partly exposed to the flue gases for the purpose of recovery of waste
heat;
9
[(hh) “Government” means Government of the Punjab;]
(i) “Inspector” means an Inspector appointed under this Ordinance;
(j) “Inspection Authority” means the organization other than manufacturer
and user, approved by the Board authorized to carry out inspection
10
[of
a boiler or pressure vessel] during manufacturing, first registration and
yearly inspection as provided under this Ordinance and includes the
approved third party inspection companies and insurance companies;
4Omitted “clause (b)” by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab
Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(a).
5Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.4.
6Substituted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(b).
7Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3. It was earlier substituted by the Punjab Boilers and Pressure Vessels
(Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, .4.
8Inserted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.2(c).
9Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.4.
10Inserted by the Punjab Boilers an d Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
(k) “manufacturer” means the company or firm recognized by the Board,
competent to manufacture complete or in parts, a boiler, or fitting, and
completes the product and is responsible for the product according to
any one of the following codes, namely:–
(i) Pakistan Boilers Regulations;
(ii) ASME (American Society of Mechanical Engineers);
(iii) BS (British Standard);
(iv) TRD;
(v) JIS (Japanese Industrial Standard);
(vi) I.S.O. Standards; and
(vii) Prevailing internationally approved code subject to the approval
of the Board;
(l) “owner” includes any compa ny who is in the possession of a boiler or
under whose name it has been registered;
(m) “prescribed” means prescribed by regulations or rules made under this
Ordinance;
(n) “pressure vessel” means
11
[a vessel categorized as such in the rules ]
along with its fitting other than a Boiler which is capable of being used
to contain, distribute, transfer, process or otherwise handle gas,
vapors, liquids and store energy under pressure internally and
externally;
(o) “Registration C ertificate” means the Registr ation Certificate issued
under Section 7; and
(p) “structural alteration, addition or renewal” means changes and
deviations from original design in the pressure parts but shall not be
deemed to include any renewal or replacement of a petty nature when
the part of fitting used for replacement is not inferior i n strength,
efficiency or otherwise to the replaced part or fitting.
(2) Every reference in this Ordinance to any boiler or economizer where
provided shall be considered as integral part of the boiler.
12
[3. Limitation of application of this Ordinance.– (1) Nothing in this Ordinance
shall apply to–
(a) any boiler in any steamship or in any mechanically propelled vessel;
(b) any boiler appertaining to a sterilizer or disinfector and the like used in
hospitals, hotels, laboratories and other industries etc, if it does not
exceed ninety one liters in capacity;
(c) any boiler used in relation to the nuclear energy; and
(d) any boiler or steam-pipe, belonging to or under the control of railway.
11Substituted for the words “a vessel” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 ( XI of 201 7),
published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
12Substituted by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.5.
(2) The Governmen t may, by notification in the official Gazette and for
reasons to be recorded in writing, declare that provisions of this Ordinance shall not
apply in the case of any specified class of boilers or steam-pipes.]
4. Power to limit extent .– The
13
[Government] may, with the concurrence of the
Board, by notification in the official Gazette, exclude any specified area from the
operation of all or any of the provisions of this Ordinance.
5. Appointment of Chief Inspector, 14[Additional Chief Inspector ,] Deputy
Chief Inspector and Inspector.– (1) The
15
[16[Chief Minister]] shall appoint a person
to be Chief Inspector for the province, who may, in addition to the powers and duties
conferred or imposed on the Chief Inspector under this Ordinance, exercise any
power or per form any duty so conferred or imposed on Deputy Chief Inspector an d
Inspector by or under this Ordinance.
(2) The
17
[18[Secretary of the Department ]] may appoint such persons as it
thinks fit to be 19[Additional Chief Inspector and ] Deputy Chief Inspectors fo r the
Province who may, in addition to the powers and duties conferred or imposed on the
Deputy Chief Inspector under this Ordinance, exercise any power or perform any
duty so conferred or imposed on Inspector by or under this Ordinance.
(3) The
20
[21[Director General]] may appoint such persons as it thinks fit to
be Inspector for the Province for the purpose of this Ordinance, and may define the
local limits within which each Inspector shall exercise the powers and perform the
duties conferred or imposed by, or under, this Ordinance.
(4) Every Chief Inspector, 22[Additional Chief Inspector, ] Deputy Chief
Inspector and Inspector shall be deemed to be a public servant within the meaning of
the Pakistan Penal Code (Act XLV of 1860).
6. Prohibition of use of unreg istered or uncertified boilers .– Save as
otherwise expressly provided in this Ordinance, no owner of a boiler
23
[or pressure
13Substituted for the words “Provincial Government” by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX
of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
14Inserted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(a).
15Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of
2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
16Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(b).
17Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of
2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
18Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(c)(i).
19Substituted by the Boilers and Pressure Vessels (Amendment) A ct 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(c)(ii).
20Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.3.
21Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(d).
22Inserted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.3(e).
23Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punja b Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
vessel] shall use the boiler
24
[or pressure vessel] or permit it to be used-
(a) unless it has been registered in accordance with the provisions of this
Ordinance;
25
[(b) in case of any boiler
26
[or pressure vessel] which has been transferred
from another Province or territory until it is registered under this
Ordinance;]
(c) unless a certificate or provisional order authorizing the use o f the boiler
27
[or pressure vessel] is for the time being in force under this Ordinance;
(d) at a pressure higher than the maximum pressure recorded in such
certificate or provisional order or under which the boiler
28
[or pressure
vessel] was constructed and stamped; 29[*]
30
[(e) unless the boiler or pressure vessel is in the charge of a person
holding the Boiler Engineers Competency Certificate required by such
rules and he is not less than twenty one years of age:
Provided that a person who is more than seventy years of age shall
produce for each year a medical certificate of fitness issued by a
Medical Officer of a Tehsil or District Headquarters Hospital31[; and]]
32[(f) where any material used as a fuel for combustion in contravention of
the standards prescribed by the Board.]
7. Registration.– (1) The owner of a boiler
33
[or pressure vessel] , which is not
registered under the provisions of this Ordinance, shall apply to the Chief Inspector,
under intimation to the
34
[Inspection Authority or, as the case may be, the Inspector ],
to have the boiler
35
[or pressure vessel] registered. Imported boilers
36
[or pressure
vessels] which have been operated outside Pakistan will require an examination
certificate from an insurance or third party inspection company of the country where
24Ibid.
25Substituted by the Punjab Boilers And Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.6.
26Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
27Ibid.
28Ibid.
29Omitted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(a).
30Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.4.
31Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(b).
32Added by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.4(c).
33Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punj ab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
34Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
35Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
36Ibid.
the boiler
37
[or pressure vessel] has been in operation confirming integrity of boiler
38
[or pressure vessel] in line with the guidelines for the Examination of Boiler
39
[or
pressure vessel] End Plate to Furnace and Shell Welded J oints issued by the
Associated Offices Technical Committee, UK or country of origin . The application
shall be accompanied by a copy of bill of entry and evidence of payment of custom
duty and such application shall be accompanied by the prescribed fee.
(2) On receipt of an application under sub -section (1) the
40
[Inspection
Authority or, as the case may be, the Inspector ] shall fix a date, within fifteen days or
such shorter period as may be prescribed from the date of the receipt, for the
examination of th e boiler
41
[or pressure vessel] and shall decide the inspection time
and schedule with the owner.
(3) On the date referred to in sub -section (2) the
42
[Inspection Authorit ies
or, as the case may be, the Inspector s] shall proceed to examine the boiler
43
[or
pressure vessel] and to determine in the prescribed manner the maximum pressure,
if any, at which such boiler
44
[or pressure vessel] may be used, and shall report the
result of the examination to the Chief Inspector.
45[(4) The Chief Inspector, on receipt of the examination report from the
Inspection Authority or Inspector, as the case may be, shall:
(a) register the boiler or pressure vessel and assign a registration
number within three working days; or
(b) refuse to register the boiler and pressure vessel and de clare the
boiler or pressure vessel not fit for approval.]
(5) Where the Chief Inspector refuses to register a boiler
46
[or pressure
vessel] the
47
[Inspection Authority or, as the case may be, the Inspector ] shall forth
with communicate refusal to the owne r of the boiler
48
[or pressure vessel] together
with the reasons thereof.
(6) The Chief Inspector may randomly check or counter check the quality
37Ibid.
38Ibid.
39Ibid.
40Substituted for the w ords “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
41Inserted by the Punjab Boilers and Pressure Vessels (Amendment ) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
42Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
43Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
44Ibid.
45Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.5.
46Ibid.
47Substituted for the words “insurance company” by the Punjab Bo ilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
48Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
of inspection and the procedure of examination of the
49
[Inspection Authority or, as
the case may be, the Inspec tor] but not exceeding twenty – five percent of boilers
50
[or pressure vessels] offered for first registration.
(7) The Chief Inspector shall, on registering the boiler
51
[or pressure
vessel], order to issue a Registration Certificate t o the owner in the pre scribed form
authorizing the use of the boiler
52
[or pressure vessel] for a period not exceeding
twelve months at a pressure not exceeding such maximum pressure as may be
prescribed by regulations.
(8) The I nspector shall forthwith convey to the owner of th e boiler
53
[or
pressure vessel], the order of the Chief Inspector through courier or registered post.
The owner shall within seven days of receipt of Registration Certificate cause the
register number to be permanently marked thereon in the prescribed manner.
54
[(9) Subject to the fulfillment of all technical requirements by the owner, the
registration of a boiler or pressure vessel shall be completed within thirty days of the
submission of an application for its registration.]
8. Renewal of Registration Cert ificate.– (1) The Registration Certificate
authorizing the use of a boiler
55
[or pressure vessel] shall cease to be in force–
(a) on the expiry of the period for which it was granted;
(b) when any accident occurs to the boiler
56
[or pressure vessel];
(c) when the boiler
57
[or pressure vessel] is moved from one location to
another unless it is registered as mobile unit;
(d) when any structural alteration, addition or renewal is made in or to any
steam– pipe attached to the boiler
58
[or pressure vessel]; or
(e) if the Chief Inspector in any particular case so directs, when any
structural alteration, addition or renewal is made in or to any steam
pipe made in or to any steam – pipe attached to the boiler
59
[or pressure
vessel].
(2) When a Registration Certifica te ceases to be in force, the owner of the
boiler
60
[or pressure vessel] shall have the option to apply to the
61
[Inspection
49Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
50Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
51Ibid.
52Ibid.
53Ibid.
54Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.5.
55Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in th e Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
56Ibid.
57Ibid.
58Ibid.
59Ibid.
60Ibid.
Authority] or the Inspector for a renewal thereof under intimation to the Chief
Inspector for such period not exceeding twelve months as he may specify in the
application.
62
[(3) An application under subsection (2) shall be accompanied by the
receipt of payment of the prescribed fee.
(3a) On receipt of intimation from the owner, the Inspection Authority or, as
the case may be, the inspe ctor shall fix a date within fifteen days or such shorter
period as may be agreed to with the owner from the date of the receipt for
examination of the boiler or pressure vessel and shall give the owner at least three
days’ notice for the purpose.]
(4) On the date fixed under sub -section (3) the
63
[Inspection Authority ] or
the Inspector, as the case may be, shall examine the boiler
64
[or pressure vessel] as
per approved applicable code, and if the
65
[Inspection Authority] or the Inspector, as
the case may be, is satisfied that the boiler
66
[or pressure vessel] is in good condition
shall recommend to the Chief Inspector for renewal of the Registration Certificate
authorizing the use of the boiler
67
[or pressure vessel] for such period not exceeding
twelve months and at a pressure not exceeding such maximum pressure as the
68
[Inspection Authority] or the Inspector as the case may be, may determine and as
may be prescribed by regulations.
(5) Where the
69
[Inspection Authority] or the Inspector, as the case may be-
(a) makes recommendations as per the approved codes to any structural
alteration, addition or renewal to be made in or to the boiler
70
[or
pressure vessel]; or
(b) is of opinion that the boiler
71
[or pressure vessel] is not fit for use, the
72
[Inspection Auth ority] or the Inspector, as the case may be, shall
inform the owner of the boiler
73
[or pressure vessel] in writing of findings
61Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
62Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.6.
63Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
64Inserted by the Punjab Boilers and Pressure Vess els (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
65Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
66Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
67Ibid.
68Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
69Ibid.
70Inserted by the Pu njab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
71Ibid.
72Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
73Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
and the reasons thereof, and shall forthwith report the case with
recommendations for orders to the Chief Inspector.
(6) The Chief Inspector, on receipt of a report under sub -section (5) may,
subject to the provisions of this Ordinance and of the
74
[rules or regulations ] made
there under, order the renewal of the Registration Certificate in such terms and on
such conditions, if any, as he thinks fit, or may refuse to renew it:
Provided that where the Chief Inspector refuses to renew a Registration
Certificate, he shall forthwith communicate his refusal to the owner of the boiler
75
[or
pressure vessel], together with the reasons thereof.
(7) The aggrieved party may, within seven days of the order, apply to the
board regarding rejection of his request for the renewal of Registration Certificate
and the Board shall issue appropriate orders either approving or disapproving the
order of the Chief Inspector within thirty days of notice of order of the Chief
Inspector.
(8) Nothing in this section shall be deemed to prevent an owner of a boiler
76
[or pressure vessel] from applying for a renewal of Registration Certificate at any
time during the currency of a Registration Certificate.
9. Provisional orders.–
77
[(1) Where the Inspector, based on the findings of the
Inspection Authority or otherwise, reports the case of any boiler or pressure vessel to
the Chief Inspector under subsection (3) or subsection (5) of section 8, he may, if the
use of boiler or pressure vessel is not prohibited under subsection (1) of section 8,
issue a provisional order in writing to the owner permitting the boiler or pressure
vessel to be used at a pressure not exceeding such maximum pressure as
recommended by the Inspection Authority or, as the case may be, the Inspector or
as may be prescribed, pending the receipt of the order of the Chief Inspector.]
(2) A provisional order issued under sub – section (1) shall cease to be in
force–
(a) on the expiry of six months from the date on which it is granted;
(b) on receipt of the orders of the Chief Inspector; or
(c) in any of the cases referred to in clauses (b) (c) (d) and ( e) of sub –
section (1) of section 8 shall stands cancelled.
10. Use of boiler pending grant of Registration Certificate .– (1)
Notwithstanding anything contained in this Ordinance, when the period of a
Registration Certificate relating to a boiler has expired, the owner shall, provided that
he has applied b efore the expiry of that period for a renewal of the Registration
Certificate, be entitled to use the boiler at the maximum pressure entered in the
former Registration Certificate pending the issue of orders on the application:
74Substituted for the word “regulations” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017),
published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.6.
75Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
76Ibid.
77Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.7.
Provided that nothing in this section shall be deemed to authorize the use of a
boiler in any of the cases referred to in clauses (b) , (c), (d) and (e) of sub -section (1)
of section 8 occurring after the expiry of the period of the Registration Certificate.
(2) When a boiler canno t be offered for inspection by the owner for
reasons which in the opinion of the owner are beyond his control such as the
existence of
78
[an emergency] , the owner may approac h the Chief Inspector, who
may authorize the use of the boiler for a period not exc eeding three months after the
expiry of the Registration Certificate. The owner may also approach the Chief
Inspector for grant of a provisional certificate not exceeding three months on
payment of the prescribed fee.
11. Revocation of Registration Certificate or provisional order.– (1) The Chief
Inspector may, at any time, withdraw or revoke a Registration Certificate or
provisional order on the report of the Inspector–
(a) if there is reason to believe that the Registration Certificate or
provisional order has been fraudulently obtained or has been granted
erroneously or without sufficient examination; or
(b) if the boiler in respect of which it has been granted has developed
some defect or has ceased to be in good conditions; or
(c) where the
79
[Government] has made rules requiring that boilers shall be
in the charge of persons holding certificates of competency and the
boiler is in the charge of a person not holding the certificate required by
such rules; or
(d) where no such rules have been made, if the bo iler is in the charge of a
person who is not maintaining the boiler in accordance wit h standard
operation procedures 80[, standards and provisions of the Ordinance]:
Provided that where the Chief Inspector withdraws or revokes a Registration
Certificate or provisional order on the ground specified in clause (d), he shall
communicate to the owner of the boiler the reasons in writing for the withdrawal or
revocation, and the order shall not take effect until the expiry of fifteen days from the
receipt of such communication.
(2) The owner shall have the right to appeal to the Board against the order
of the Chief Inspector.
(3) The Board shall issue appropriate orders either approving or
disapproving the order of the Chief Inspector within thirty days of notice o f the order
of the Chief Inspector.
12. Alterations and renewals to boilers .– No structural alteration, addition or
renewal shall be made by the repairer in any boiler registered under this Ordinance
unless such alteration, addition or renewal has been san ctioned in writing by the
Chief Inspector. The execution of any modification as per the approved drawings
78Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.7.
79Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2013 (XX of
2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
80Inserted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.6.
shall be verified by the 81[Inspection Authority].
13. Duty of owner at examination .– (1) On any date fixed under this Ordinance
for the examination of a boiler
82
[or pressure vessel] , the owner thereof shall be
bound–
83
[(a) to intimate the Inspection Authority or the Inspector, as the case may
be, to provide all reasonable facilities for examination and to furnish
such information as may be required;]
(b) to have the boiler
84
[or pressure vessel] properly prepared and ready for
examination as per written down examination procedures conforming
to applicable codes; and
(c) in the case of an application for the registration of a boiler
85
[or pressure
vessel], to provide such drawings, specifications, certificates and other
particulars as may be prescribed.
(2) If the owner fails, without reasonable cause, to comply, the
86
[Inspection
Authority or, as the case may be, the Inspector ] at the expense of owner shall refuse
to make the examination and shall report the case to the Chief Inspector who shall,
unless sufficient cause to the contrary is shown, require the owner to file a fresh
application under section 7 or section 8, as the case may be , and may forbid him to
use the boiler
87
[or pressure vessel] notwithstanding anything contained in section10.
14. Production of Registration Certificate , etc.– (1) The owner of any boiler
88
[or pressure vessel] who holds a Registration Certificate or provisional order relating
thereto shall, at all reasonable times during the period for which the Registration
Certificate or provisional order is in force, be bound to produce the same when called
upon to do so by the Chief Inspector or the Inspector.
89
[(2) On non -compliance o f an order, the Chief Inspector may initiate
proceedings for cancellation of the registration certificate in the prescribed manner.]
15. Powers of entry. - An Inspect or may, for the purpose of inspecting or
81Substituted for the word “insurance company” by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and
published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.7.
82Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
83Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.8.
84Inserted by the Punjab Boile rs and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
85Ibid.
86 Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendmen t) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
87Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
88Ibid.
89Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.9.
examining a boiler or any steam -pipe attached thereto or in case of non observance
of any provision of this Ordinance or of any regulations or rules at all reasonable
times enter any place or building within the limits of the area for which he has been
appointed in which he has reason to believe that the boiler is in use.
90[16. Report of accidents.- (1) If any accident occurs to a boiler or pressure vessel,
the owner or boiler engineer incharge shall immediately report such accident, in
writing, to the Chief Inspector or the concerned Inspector, and such r eport shall
contain a description of nature of the accident, the injury or casualty, if any and the
damage to the boiler or pressure vessel.
(2) The Inspector, on its own information or on receipt of report under sub -
section (1) or on the direction of t he Chief Inspector, as the case may be, shall visit
the site of the accident immediately.
(3) The Inspector shall submit a preliminary report to the Chief Inspector
within twenty-four hours of receipt of information of the accident or direction issued
under sub-section (2).
(4) The Chief Inspector shall, if deemed necessary, submit the report, as
early as possible, with his recommendations to the Director General for constitution
of an accident committee to determine the root cause of accident an d fix the
responsibility for such accident.
(5) The accident committee constituted by the Director General shall submit
its comprehensive report with recommendations to the Board and the Board may
direct any appropriate action under the Ord inance including direction to the Chief
Inspector to get registered First Information Report through concerned Inspector
against responsible persons and suspension of competency certificate of boiler
engineer.
(6) The owner shall facilitate the accident committee to have access to the
place of accident for the purpose of collection of evidence and every person having
information of such accident shall answer truly to the best of his knowledge and
ability to every question put to him, in writing, by the accident committee.]
17. Appeal to the Board. – (1) Any person, owner or company aggrieved by any
recommendation made by the insurance company or findings or decision of the Chief
Inspector for–
(a) refusing to register a boiler or to grant or r enew a Registration
Certificate in respect of a boiler; or
(b) refusing to grant a Registration Certificate having validity for the full
period applied for; or
(c) refusing to grant a Registration Certificate authorizing the use of a
boiler at the maximum pressure desired; or
(d) withdrawing or revoking a Registration Certificate or provisional order;
or
(e) reducing the amount of pressure specified in any certificate or the
period for which such certificate has been granted; or
90Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.8.
(f) ordering any struct ural alteration, addition or renewal to be made in or
to a boiler which contravenes the design code, or refusing sanction to
the making of any structural alteration, addition or renewal in or to a
boiler based on approved drawings may, within fifteen days of the
communication to him of such order, refer appeal to the Board.
(2) The Board shall communicate the decision in thirty days of receipt of
an appeal, and pending final decision of the Board may grant interim relief to the
owner.
18. Finality of orders.– An order of the Board under section 17 shall be final and
shall not be called in question in any court.
19. Minor penalties. – Any owner of a boiler who refuses or without reasonable
excuse neglects–
(a) to surrender a provisional order as required by section 9;
(b) to produce a certificate or provisional order when duly called upon to
do so under section 14; or
(c) to hand over to the new owner of a boiler a Registration Certificate or
provisional order as required by section 14,
shall be punishable with fine which may extend to ten thousand rupees.
91
[20. Illegal use of boiler and pressure vessel .– (1) The owner of a boiler or
pressure vessel who, in any case in which a registration certificate or provisional
order is required for its use under the O rdinance, uses the boiler or pressure vessel
either without any such certificate or order being in force or without the assistance or
presence of a qualified boiler engineer or at a higher pressure than that allowed
thereby, shall be issued a warning to co mply with the such provisions of the
Ordinance, rules or regulations and within such time as the Chief Inspector may
specify.
(2) In case, the order under subsection (1) is not implemented within the
specified time, the Chief Inspector shall take such ac tion as may be necessary
including the closure of the boiler or pressure vessel or revocation of the registration
certificate in the prescribed manner or, if necessary, sealing the factory in the
prescribed manner.]
92
[21. Penalties.– Any person who:
(a) uses or permits to be used a boiler or pressure vessel of which he is
the owner and which has been transferred from any Province to
Province of the Punjab without such transfer having been reported as
required by section 6; or
(b) being the owner of a boile r or pressure vessel, fails to cause the
register number allotted to the boiler or pressure vessel under this
91Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.10.
92Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.11.
Ordinance, to be marked on the boiler or pressure vessel as required
by subsection (8) of section 7; or
(c) makes any structural alteration, addit ion or renewal in or to a boiler or
pressure vessel without prior approval when so required under section
12; or
(d) fails to report an accident to the boiler or pressure vessel when so
required under section 16; or
(e) hampers with a safety valve of the b oiler or pressure vessel so as to
render it inoperative at the maximum pressure at which the use of the
boiler or pressure vessel is authorized under this Ordinance; or
(f) uses the boiler or pressure vessel without getting it registered under
the Ordinance; or
(g) fails to have a periodical inspection certificate issued for the boiler or
pressure vessel as prescribed; or
(h) is a manufacturer of boilers or pressure vessels and contravenes the
prescribed codes; or
(i) operates the boiler or pressure vessel without the assistance and
presence of a qualified boiler engineer or technician–
shall be liable to punishment with imprisonment which may extend to two
years but which shall not be less than three months and fine which may extend to
four hundred thousa nd rupees but which shall not be less than fifty thousand
rupees.]
22. Penalties for tempering with registration number, etc .– (1) Whoever
removes, alters , defaces, renders invisible or other wise tampers with the register
number marked on a boiler
93
[or pressure vessel] in accordance with this Ordinance
or any law repealed, hereby, shall be punishable with fine which may extend to
twenty five thousands rupees.
(2)
94
[* * * * * * * * * * * ]
(3) Whoever fraudulently marks upon a boiler
95
[or pressure vessel ] a
register number which has not been allotted to it under this Ordinance or any Act
repealed hereby, shall be punishable with imprisonment which may extend to two
years, or with a fine which may extend to fifty thousands rupees or with both.
23. Limitation and previous sanction for prosecution .– No prosecution for an
offence punishable by or under this Ordinance shall be instituted–
(a) after six month of the commission of an offence; and
(b) without the previous sanction of the Chief Inspector.
93Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
94Omitted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.12.
95Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
24. Trial of offence .– Not withstanding any thing in the Code of Criminal
Procedure, 1898 (Act V of 1898) no Court not inferior to that of a Magistrate of the
first class shall try an offence under this Ordinance.
96
[25. Punjab Boiler and Pressure Vessels Safety B oard.–
97
[(1) The Government
shall constitute a Board to be called the Punjab Boilers and Pressure Vessels Safety
Board for purposes of this Ordinance.
(1A) The Board shall consist of the following:
(a) Secretary to the Government, Industries,
Commerce and Investment Department;
Chairperson
(b) Director General Industries, Prices,
Weights and Measures;
Member
(c) an officer not below the rank of an
Additional Secretary of the Department;
Member
(d) Chief Inspector; Secretary
(e) one perso n nominated by the Lahore
Chamber of Commerce and Industry,
Lahore;
Member
(f) one person nominated by the Federal
Chamber of Commerce and Industry,
Islamabad;
Member
(g) two manufacturers of boilers and pressure
vessels nominated by the Government;
Members
(h) two users of boilers and pressure vessels
nominated by the Government;
Members
(i) one representative of the Inspection
Authority nominated by the Government; Member
98[(ia) a technical expert on Environment
Protection and Climate Change, not below
the rank of BPS -18, nominated by the
Secretary to the Government,
Environment Protection and Climate
Change Department;
Member
(ib) Two members of Provincial Assembly of
the Punjab, one from the Treasury and
one from the Opposition, to be nominated
by the Speaker of the Assembly;
Members]
(j) a faculty member of the Mechanical Member
96Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.8.
97Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.13.
98Inserted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 20 25); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.9.
Engineering Department of University of
Engineering and Technology, Lahore; and
(k) a Boiler Engineer nominated by the
Government.
Member
(1B) The Board may co -opt a professional member from a public or private
sector organization for expert opinion.
(1C) The term of a member, other than an ex officio member, shall be three
years.
(1D) The Government may increase or decrease the number of members of
the Board.]
99
[100[26. * * * * * * * * * * *]]
101
[27. Filling of vacancies.– The Government shall, within sixty days from the date
of occurrence of a vacancy, fill the vacancy in the Board 102[* * * *].
28. Meeting of the Board .– (1) The Powers of the Board shall be exercised with
a quorum of at least seven members of the Board in which representati on of the
manufacturers and users shall be mandatory.
(2) The Board shall meet once every three months to review the
implementation of rules, regulations and other matters on the agenda.
29. Power to make rules .– (1) The Board may, with the approval of the
103
[Government] by notification in the official Gazette, make rules for carrying out the
purposes of this Ordinance.
(2) Without prejudice to the generality of t he foregoing power, such rules
may provide for all or any of the following matters, namely:–
(a) for prescribing the qualifications and duties of the Chief Inspector ,
Deputy Chief Inspector and Inspectors;
(b) for regulating the transfer of boilers
104
[or pressure vessels];
(c) for providing for the registration and certification of boilers
105
[or
pressure vessel s] in accordance with the regulations and approved
codes under this Ordinance;
99Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.9.
100Omitted “section 26’’ by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab
Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.10.
101Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab
Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.10.
102Omitted by the Boilers and P ressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.11.
103Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (A mendment) Act 2013 (XX
of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
104Inserted by the Punjab Bo ilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
105Ibid.
(d) for requiring boilers
106
[or pressure vessel s] to be in the charge of
persons holding certificates of competency, and for prescribing the
conditions on which such certificates may be granted;
(e) for prescribing the times within which the
107
[Inspection Authority] shall
be required to examine the boiler
108
[or pressure vesse l] as per
approved practice or code of examination;
(f) for prescribing the fees payable for the renewal of Registration
Certificate and methods of determining the amount of such fees in
each case;
109[(g) for regulating the procedure of inquiries into accidents;]
(h) for determining the mode of disposal of fees, costs and penalties levied
under this Ordinance; and
(i) generally to provide advice for any matter which is, in the opinion of the
Board, a matter of local importance in the Province.
30. Power to make regulations .– (1) The Board may, by notification in the
official Gazette, make regulations for carrying out the purposes of Ordinance.
(2) Without prejudice to the generality of the foregoing powers such
regulations may provide for all or any of the following matters, namely:–
(a) adopting code and procedures as laid down in international boiler
110
[or
pressure vessel] code for materials, design and construction which
shall be required for the purpose of registration and certification of a
boiler
111
[or pressure vessel] under this Ordinance;
(b) for prescribing the circumstances in which the extent to which, and the
conditions subject to which variations from the standards laid down
under international boiler
112
[or pressure vessel] codes may be
permitted;
(c) for prescribing the method of determining the maximum pressure at
which a boiler
113
[or pressure vessel] may be used;
(d) for regulating , the registration of boilers
114
[or pressure vessel s],
106Ibid.
107Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
108Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
109Substituted by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette
(Extraordinary), dated 25.06.2025, pages 5235-5237, s.12.
110Inserted by the Punjab Boil ers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
111Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the P unjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
112Ibid.
113Ibid.
114Ibid.
prescribing the fees payable thereof, the drawings, specificati ons,
certificate, particulars to be produced by the owner, the method of
preparing a boiler
115
[or pressure vessel] for examination by
116
[Inspection Authority], the method of marking the register number, the
period within which number is to be marked on the b oiler
117
[or pressure
vessel], selection and regulating the rules for Inspection Authority and
nomination of
118
[Inspection Authorities] for boiler
119
[or pressure vessel]
insurance;
120
[(e) excluding and exempting a pressure vessel from registration,
inspection and certification;
(f) prescribing the time within which the Inspection Authority shall be
required to examine a pressure vessel as per approved practice or
codes of examination; and
(g) regulating examination of boiler engineers and their certification.]
121
[31. Breach of rules and regulations .– (1) Any rules or regulations made under
section 29 or section 30 may provide that a person or company contravening such
rules or regulations shall be warned by the Chief Inspector to take such remedial
action within such time as the Chief Inspector may specify.
(2) In case, the remedial steps are not taken within the specified time, the
Chief Inspector shall take necessary action to stop illegal use of the boiler or
pressure vessel, including the closure of the boiler or pressure vessel, revocation of
the registration certificate in the prescribed manner or, if necessary, sealing of the
factory in the prescribed manner.]
32. Previous publication of rules or regulations .– (1) The power to make rules
and regulations conferred by sections 29 and 30 respectively shall be subject to the
condition of the rules and regulations being made after previous publication.
(2) The rules and regulations so made shall be published in the official
Gazette and on such publication, shall have effect as if enacted in this Ordinance.
33. Recovery of fees, etc .– All fees, costs and penalties levied under this
Ordinance shall be recoverable as arrears of land revenue.
115Ibid.
116Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
117Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
118Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
119Inserted by the Punjab Boilers and Pressure Vessels (Amendmen t) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
120Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.15.
121Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab
Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.16.
122
[34. Application of the Ordinance to the Governments .– Save as otherwise
expressly provided, this Ordinance shall be applicable to boilers and pressure
vessels belonging to the Government, Federal Government, local government or any
other Provincial Government.]
35. Power to suspend in case of emergency .– (1) The
123
[Government] may, by
notification in the official Gazette, with the consultation of the Board, exempt from the
operation of this Ordinance, subject to such conditions and restrictions as it thinks fit,
any boilers
124
[or pressure vessel s] or classes or types of boilers
125
[or pressure
vessels] used exclusively for the heating of buildings or the supply of hot water.
(2) In case of any emergency the
126
[Government] may, by general or
special order in writing, exempt any boilers
127
[or pressure vessel s] or any class of
boilers
128
[or pressure vessels] from the operation of all or any of the provisions of this
Ordinance.
36. Inspection by
129
[Inspection Authority or, as the case may be, the
Inspector].– (1) The
130
[Inspection Authority or, as the case may be, the Inspector ]
shall carry out inspection of boilers
131
[or pressure vessel s] at the first registration as
well as subsequent inspections as defined in the Ordinance.
(2) The
132
[Inspection Authority or, as the case may be, the Inspector ] shall
be approved by the Board for the purposes of this Ordinance, and shall have
qualified personnel and necessary skill to carry out the inspection and examination of
boilers
133
[or pressure vessel s] within the scope and under the guidelines of any
approved code.
(3) The
134
[Inspection Authority’s or, a s the case may be, the Inspector ’s]
technical personnel shall be approved by the Board for the purposes of this
Ordinance.
122Substituted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab
Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.11.
123Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) Act 201 3 (XX
of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
124Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
125Ibid.
126Substituted for the words “Provincial Government” by the Punjab Boilers and Pressure Vessels (Amendment) A ct 2013 (XX
of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.2.
127Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
128Ibid.
129 Substituted for the words “insurance company” by the Punjab Boilers and Pr essure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
130Ibid.
131Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punja b Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
132Substituted for the words “insurance company” by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
133Inserted by the Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of 2017), published in the Punjab Gazette
(Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
134Substituted for the words “insurance company” by th e Punjab Boilers and Pressure Vessels (Amendment) Act 2017 (XI of
2017), published in the Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.2.
37. Insurance of boilers .– All boilers shall be insured against damage due to
accidents as per the existing laws and standards.
38. Repeal and saving .– (1) The Boilers Act, 1923 (V of 1923), is hereby
repealed.
(2) Any boiler registered, certified or licensed under the Boilers Act, 1923
(V of 1923), shall be deemed to have been registered, certified or licensed under this
Ordinance.
(3) Notwithstanding the repeal of the Boilers Act, 1923 (V of 1923), the
rules and regulations made under the said Act, and in force immediately before the
commencement of this Ordinance, shall, mutatis mutandis and in so far they are not
inconsistent with any of the provisions of this Ordinance, shall continue in force until
repealed or altered by rules or regulations made under this Ordinance.This law in the library
Follow the instruments and provisions named in this source edition, and the laws that cite it. Citation links identify the text being referred to; legal effect and current force require separate examination.
Instruments cited by this law 2
References to provisions in this text 19
Section 25
Open the identified operative provision
Read reference in context
Federal Government”. certification; 4[(b) * * * * * * * * * * *] (c) “Board” means the 5 [Punjab] Boilers and Pressure Vessels safety Board constituted under section 25; (d) “boiler” means a closed vessel exceeding twenty -five liters in capacity in which water is heated, steam is generated and superheated or a combination thereof under pressure, for external use by the application of he
Section 7
Open the identified operative provision
Read reference in context
gas, vapors, liquids and store energy under pressure internally and externally; (o) “Registration C ertificate” means the Registr ation Certificate issued under Section 7; and (p) “structural alteration, addition or renewal” means changes and deviations from original design in the pressure parts but shall not be deemed to include any renewal or replacement of a petty nature when the part
Section 8
Open the identified operative provision
Read reference in context
findings of the Inspection Authority or otherwise, reports the case of any boiler or pressure vessel to the Chief Inspector under subsection (3) or subsection (5) of section 8, he may, if the use of boiler or pressure vessel is not prohibited under subsection (1) of section 8, issue a provisional order in writing to the owner permitting the boiler or pressure vessel to be used at a pressure not e
Section 8
Open the identified operative provision
Read reference in context
to the Chief Inspector under subsection (3) or subsection (5) of section 8, he may, if the use of boiler or pressure vessel is not prohibited under subsection (1) of section 8, issue a provisional order in writing to the owner permitting the boiler or pressure vessel to be used at a pressure not exceeding such maximum pressure as recommended by the Inspection Authority or, as the case may be, the
Section 8
Open the identified operative provision
Read reference in context
it is granted; (b) on receipt of the orders of the Chief Inspector; or (c) in any of the cases referred to in clauses (b) (c) (d) and ( e) of sub – section (1) of section 8 shall stands cancelled. 10. Use of boiler pending grant of Registration Certificate .– (1) Notwithstanding anything contained in this Ordinance, when the period of a Registration Certificate relating to a boiler has expired
Section 8
Open the identified operative provision
Read reference in context
at nothing in this section shall be deemed to authorize the use of a boiler in any of the cases referred to in clauses (b) , (c), (d) and (e) of sub -section (1) of section 8 occurring after the expiry of the period of the Registration Certificate. (2) When a boiler canno t be offered for inspection by the owner for reasons which in the opinion of the owner are beyond his control such as the ex
Section 7
Open the identified operative provision
Read reference in context
ion and shall report the case to the Chief Inspector who shall, unless sufficient cause to the contrary is shown, require the owner to file a fresh application under section 7 or section 8, as the case may be , and may forbid him to use the boiler 87 [or pressure vessel] notwithstanding anything contained in section10. 14. Production of Registration Certificate , etc.– (1) The owner of any boile
Section 8
Open the identified operative provision
Read reference in context
report the case to the Chief Inspector who shall, unless sufficient cause to the contrary is shown, require the owner to file a fresh application under section 7 or section 8, as the case may be , and may forbid him to use the boiler 87 [or pressure vessel] notwithstanding anything contained in section10. 14. Production of Registration Certificate , etc.– (1) The owner of any boiler 88 [or
Section 17
Open the identified operative provision
Read reference in context
y days of receipt of an appeal, and pending final decision of the Board may grant interim relief to the owner. 18. Finality of orders.– An order of the Board under section 17 shall be final and shall not be called in question in any court. 19. Minor penalties. – Any owner of a boiler who refuses or without reasonable excuse neglects– (a) to surrender a provisional order as required by section
Section 9
Open the identified operative provision
Read reference in context
in any court. 19. Minor penalties. – Any owner of a boiler who refuses or without reasonable excuse neglects– (a) to surrender a provisional order as required by section 9; (b) to produce a certificate or provisional order when duly called upon to do so under section 14; or (c) to hand over to the new owner of a boiler a Registration Certificate or provisional order as required by section
Section 14
Open the identified operative provision
Read reference in context
e neglects– (a) to surrender a provisional order as required by section 9; (b) to produce a certificate or provisional order when duly called upon to do so under section 14; or (c) to hand over to the new owner of a boiler a Registration Certificate or provisional order as required by section 14, shall be punishable with fine which may extend to ten thousand rupees. 91 [20. Illegal use of
Section 14
Open the identified operative provision
Read reference in context
r when duly called upon to do so under section 14; or (c) to hand over to the new owner of a boiler a Registration Certificate or provisional order as required by section 14, shall be punishable with fine which may extend to ten thousand rupees. 91 [20. Illegal use of boiler and pressure vessel .– (1) The owner of a boiler or pressure vessel who, in any case in which a registration certificat
Section 6
Open the identified operative provision
Read reference in context
essel of which he is the owner and which has been transferred from any Province to Province of the Punjab without such transfer having been reported as required by section 6; or (b) being the owner of a boile r or pressure vessel, fails to cause the register number allotted to the boiler or pressure vessel under this 91Substituted by the Punjab
Section 7
Open the identified operative provision
Read reference in context
Punjab Gazette (Extraordinary), dated: 31 May 2017, pp. 7673-7677, s.11. Ordinance, to be marked on the boiler or pressure vessel as required by subsection (8) of section 7; or (c) makes any structural alteration, addit ion or renewal in or to a boiler or pressure vessel without prior approval when so required under section 12; or (d) fails to report an accident to the boiler or pressure ves
Section 12
Open the identified operative provision
Read reference in context
ion (8) of section 7; or (c) makes any structural alteration, addit ion or renewal in or to a boiler or pressure vessel without prior approval when so required under section 12; or (d) fails to report an accident to the boiler or pressure vessel when so required under section 16; or (e) hampers with a safety valve of the b oiler or pressure vessel so as to render it inoperative at the maximum pr
Section 16
Open the identified operative provision
Read reference in context
ressure vessel without prior approval when so required under section 12; or (d) fails to report an accident to the boiler or pressure vessel when so required under section 16; or (e) hampers with a safety valve of the b oiler or pressure vessel so as to render it inoperative at the maximum pressure at which the use of the boiler or pressure vessel is authorized under this Ordinance; or (f) use
Section 26
An operative target heading has not been identified. Read the source passage
Read reference in context
Boilers and Pressure Vessels (Amendment) Act, 2013 (XX of 2013); and published in the Punjab Gazette (Extraordinary), dated 3.9.2013, pages 805-807, s.9. 100Omitted “section 26’’ by the Boilers and Pressure Vessels (Amendment) Act 2025 (LV of 2025); and published in the Punjab Gazette (Extraordinary), dated 25.06.2025, pages 5235-5237, s.10. 101Substituted by the Punjab Boilers and Pressure Vesse
Section 29
Open the identified operative provision
Read reference in context
; and (g) regulating examination of boiler engineers and their certification.] 121 [31. Breach of rules and regulations .– (1) Any rules or regulations made under section 29 or section 30 may provide that a person or company contravening such rules or regulations shall be warned by the Chief Inspector to take such remedial action within such time as the Chief Inspector may specify. (2) In case,
Section 30
Open the identified operative provision
Read reference in context
gulating examination of boiler engineers and their certification.] 121 [31. Breach of rules and regulations .– (1) Any rules or regulations made under section 29 or section 30 may provide that a person or company contravening such rules or regulations shall be warned by the Chief Inspector to take such remedial action within such time as the Chief Inspector may specify. (2) In case, the remedial
Explore this law in the whole-library map · Download this law’s relationship evidence · Download preserved source record
Original-source comparison
Original-source character comparison matched under the recorded normalization
Open the compared original source
Source comparison checks the identified transcription and edition. The law's current force, later amendments and territorial application require separate legal review.
Comparison evidence
- Stored text SHA-256
- 3b5857b3c00258881adfd5dd5f3ba5218557f0faa724b5132067e07d77c7c52c
- Original source SHA-256
- 7f93b8d373598a6b2de379d993a21e084cf295856a01c2b947dea4990973453f
- Comparison method
- Complete exact non-whitespace character stream after NFKC, quotation-mark equivalents and soft-hyphen removal. Word boundaries and PDF line-layout differences remain separately described.
Source, version and text details
- Recorded title
- BOILERS AND PRESSURE VESSELS ORDINANCE, 2002
- Source collection
- Punjab — this does not establish territorial applicability.
- Recorded version
- Not supplied in this record
- Source snapshot
- 2026-08-06T16:19:11Z
- Legal status
- not independently verified
- Text quality
- Complete stored UTF-8 TXT file recovered byte-for-byte from owned Drive. Source transcription retained verbatim; legal completeness, OCR accuracy and current consolidation unverified.
- Recorded quality flags
- No additional flags recorded
- Stable record
- punjab-code-bcd4a30610c7a935
- Content extent
- Legal completeness not independently established
- Integrity scope
- Stored UTF-8 text and TXT download bytes checked against their recorded hash. This does not establish legal authenticity or currency.
- Passage offsets
- zero-based Unicode code points and UTF8 bytes; end exclusive
- Stored text SHA-256
- 3b5857b3c00258881adfd5dd5f3ba5218557f0faa724b5132067e07d77c7c52c